A Ellery company - serving North Las Vegas, NV
A new cottage-style ADU with a front porch

Specials & Coupons - Ellery ADU Studio North Las Vegas

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas

ADU Specials in North Las Vegas, NV

We’d rather show you a real offer than a fake countdown. Call (866) 403-8955 and the first thing you’ll get is a written price, not a pitch. Our North Las Vegas specials exist for one reason: to remove the guesswork that keeps homeowners from starting an ADU project they’ve been thinking about for years. Every offer below ties to work we already document, warrant, and quote in writing.

Call (866) 403-8955

Current Offers

A new modern ADU with wood cladding

Free ADU Feasibility Consultation & Site Walk

We walk your North Las Vegas property, check the setbacks and lot coverage against city code, and tell you in plain terms what actually fits. This is the visit where most homeowners learn their garage conversion is a simpler path than the detached unit they came in asking about. Qualifies for any residential lot inside North Las Vegas city limits. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.

Free Second Opinion on Any Written ADU Estimate

Already have a bid in hand from another contractor? Send it over and we’ll review it line by line, flag anything missing from the scope, and tell you where the allowances look thin. We’ve seen plenty of North Las Vegas estimates that quote the build but forget the utility trench or the permit fees. No obligation to hire us. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.

Written Price Before Work Starts – On Every ADU Project

Under Haven Standard Clause 1, every project gets a written price before any work begins, and that applies to garage conversions, detached units, and interior conversions alike. Our in-house designer and our build team sit under one contract, so no one can point at the other when a number moves. Fixed pricing with no change orders on a locked scope. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.

Prefab & Modular System Sourcing At No Added Fee

We coordinate prefab and modular systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie, and we don’t add a middleman markup for specifying them within your contract. If a factory-built unit makes more sense for your North Las Vegas lot than site-built, we’ll tell you so. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.

365-Day Done Right Promise – Standard on Every ADU

If the finished ADU isn’t built to the permitted drawings, we make it right, in writing, before the project even starts. That’s the 365-Day Done Right Promise, and it comes standard rather than as an upgrade. Applies to every design-build category we offer: design and permitting, garage conversion, new detached ADU, and junior ADU or interior conversion. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.

Documented Photo Record on Every Visit

Clients get evidence of what was found and what was done, not a summary of how it felt. You receive photos at each stage, from slab inspection through framing to final, so you can see the work whether you’re standing on site or across the country. Comes standard on every North Las Vegas project. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.

How to Redeem

  • Call and mention the offer. Dial (866) 403-8955, name the special you want, and a live person takes it from there. No voicemail queue.
  • Book the visit. We schedule your site walk or estimate review at a time that works, and you’ll know who’s arriving and when.
  • Present it at service. Reference the offer when our team arrives, and it comes off your written price before work starts.

Why Our Offers Work Differently

Most ADU “specials” you’ll see around North Las Vegas are discount codes stacked on top of a number that was never firm to begin with. We don’t play that game. Since 2015 we’ve designed, permitted, and built 900+ ADUs, every one with a written price before work started and a documented photo record when work was complete. Our technicians bring up to experience on each project, and our crews are background-checked and uniformed, with our license number on every page. An offer from us removes friction from a real price; it doesn’t hide one.

What These Offers Don’t Cover

To keep things honest: our specials don’t include permit fees, utility connection costs, or site-prep work that a specific North Las Vegas lot turns up during the site walk. Those get itemized in your written quote so you see them coming. We also don’t discount a scope we haven’t inspected yet. That’s why the free feasibility visit comes first.

Frequently Asked Questions

The bedroom inside a new ADU

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in North Las Vegas? Licensed & insured · free written estimates
Call (866) 403-8955
Local Service Coverage

Request a Free Estimate in North Las Vegas

Tell us what you need - Ellery ADU Studio North Las Vegas responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch