







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateTrusted Junior ADU & Interior Conversion for North Las Vegas Homeowners
North Las Vegas has a housing type problem that most contractors gloss over: a lot of the city’s mid-century and 1990s housing stock was built with rooms that are almost, but not quite, legal living space. An oversized attached garage, a den off the kitchen, a bonus room over the garage, a partially finished basement in the older tracts near Civic Center – each one is a candidate for a junior ADU, and each one has a different set of Clark County code questions attached to it. Most homeowners who call us have already gotten one vague estimate from a general contractor and one from a garage door company, and neither one explained what a JADU actually requires in North Las Vegas.
That’s the gap we close. Our technicians have up to 11 years of experience with junior ADU conversions, interior rehab, and the specific North Las Vegas permit path for an interior JADU. We’ve built a strong local reputation on written pricing and complete documentation, not on sales talk. If you already have an estimate in hand, we’ll give you a free second opinion on it before you sign anything. Call (866) 403-8955 and a live person will pick up.
What Our Junior ADU & Interior Conversion Service Includes

A junior ADU is a smaller, attached living unit – typically 500 square feet or less – with its own entrance, kitchenette, and bathroom. In North Las Vegas, the difference between a legal JADU and an illegal guest room comes down to the permit set, the egress path, and the utility separation. Here’s how we handle each of the five conversion types that fall under this category.
Basement ADU
Basements are uncommon in North Las Vegas new construction, but the older neighborhoods near the North Las Vegas Airport and along Carey Avenue have them. A basement ADU converts unfinished or partially finished below-grade space into a self-contained unit with egress windows, a sump and vapor barrier system, and a separate electrical subpanel. We start with a moisture survey and a structural read of the existing foundation wall – what we find there determines whether the project is a finish-out or a retrofit, and the written price reflects which one before any work begins.
Above-Garage ADU
An above-garage ADU puts a studio or one-bedroom unit over an existing detached or attached garage. In North Las Vegas, the sticking point is almost always structural: a 1990s garage slab and wall assembly wasn’t framed for a second-story load, so the drawings have to show a reinforcement plan or a new load path. We handle the structural engineering and the permit set together, so you’re not coordinating a separate engineer and a separate builder and hoping they agree. This conversion type works especially well on the deep lots common in the Aliante and Eldorado neighborhoods.
Room-to-ADU Conversion
A room-to-ADU conversion takes an existing bedroom, den, or bonus room and brings it up to JADU code: added egress, a legal kitchenette, a bathroom that meets fixture clearances, and a door that separates the unit from the main house. This is the least expensive path to a legal unit and the one most North Las Vegas homeowners ask about first, because it usually doesn’t touch the foundation or the roof. We price the code upgrades line by line – the egress window, the plumbing rough-in, the electrical – so you can see what the city is actually requiring versus what’s cosmetic.
Attached Addition ADU
An attached addition ADU is new square footage built onto the side or rear of the house, sharing a wall with the primary structure. This is the conversion type that triggers the most North Las Vegas zoning questions – setback, lot coverage, and parking – and the one where a pre-application meeting with the city saves the most money. We pull the permits and sit in on the pre-app meeting with you; the drawings we submit are the drawings we build from, and the price is locked at signing.
Interior JADU
An interior JADU is a junior unit carved entirely out of existing interior space, sharing the main house’s utility connections where the code allows it. North Las Vegas homeowners use these for aging parents, adult children, or a rental unit that stays under the square-footage threshold. We document what we found on the first visit – the panel capacity, the water heater, the existing rough-in locations – and that photo record goes in your file, so there’s no argument later about what the house looked like before we started.
Whichever type fits your property, the drawings, the permit set, and the construction all sit under one contract at one written price. That’s the design-build model and it’s what separates a design-build studio from a contractor who subs out the drawings.
Brands We Work With for Junior ADU & Interior Conversion
Prefab and modular systems have changed what’s possible for a junior ADU, and we specify and coordinate several of them inside the same contract. Mighty Buildings panels work well for above-garage and attached addition units because they arrive dimensioned for the load path we’ve engineered; we’ve coordinated enough of them to know where the panel joints need to land relative to your framing. Plant Prefab modules are a fit for homeowners who want the interior JADU finished in a factory and set in one operation, and we handle the site interface so the module and the existing house meet correctly.
Boxabl units are a reasonable option for a detached or above-garage studio when the lot is tight and the timeline matters; we coordinate the utility hookups and the permit drawings that go with them. And a Tuff Shed shell can be upgraded into a legal JADU in the right circumstances, though it takes a real drawing set to get it past the North Las Vegas plan check – a shed on a slab is not a dwelling unit until the paperwork says it is. Whether your project leans toward a Mighty Buildings system or a Tuff Shed retrofit, we can specify it and build to it under one contract. If you’re weighing a JADU against a full Junior ADU & Interior Conversion in North Las Vegas, we’ll price both before you commit to either.
Signs You Need to Start Your Junior ADU & Interior Conversion
- You have a room that’s “almost” legal. A den with a closet and a window but no egress, or a bonus room over the garage with a stair that doesn’t meet code – these are the most common JADU candidates we see in North Las Vegas. Fixing them now is cheaper than fixing them after a rental or resale inspection flags them.
- You’re housing family and the arrangement isn’t temporary. Aging parents, an adult child moving back, or a relative who needs a separate entrance and kitchen. Once the arrangement looks like it will last more than a year, a legal JADU is worth more than a converted bedroom, and it protects you when you sell.
- Your panel or plumbing is already at its limit. A 100-amp panel with no spare breaker slots, or a water heater at the end of its life, will force a decision during a JADU conversion. We check both on the first visit and put the findings in writing, so the upgrade is a priced line item, not a mid-project surprise.
- A contractor quoted you a number with no drawings attached. If the estimate doesn’t show what the permit set looks like and who’s pulling it, the number is a guess. The designer-versus-builder blame gap is what derails most ADU projects, and it’s the one thing a single-contract design-build model eliminates.
- You want rental income but your lot doesn’t fit a detached unit. If setback or lot coverage rules out a new detached ADU, an interior or above-garage conversion is often the only legal path. We’ll tell you which conversion types your lot can actually support before you spend on drawings.
Our Junior ADU & Interior Conversion Process, Step by Step
- 1
Site visit and documentation. We walk the property, measure the candidate space, check the electrical panel, the water heater, and the existing rough-in locations, and photograph everything. You get the photo record in your file – evidence of what we found, not a summary of how it felt.
- 2
Written scope and written price. Before any work starts, you receive the scope and the price in writing, line by line. Under Clause 1 of The Haven Standard, the price is set before the first day of work, and it doesn’t move because of a door-side upsell.
- 3
Drawings and permit set. Our team produces the drawings the city actually needs – egress, structural, plumbing, electrical – and pulls the permits. Where the project touches setback or lot coverage, we attend the pre-application meeting with you. Nothing gets built from a sketch.
- 4
Construction and inspections. Our background-checked crews build to the permitted drawings, and we schedule and pass the inspections rather than leaving them to you. The Junior ADU & Interior Conversion in Sunrise Manor page walks through how the same process works on the east side of the valley.
- 5
Final walk and the 365-Day Done Right Promise. We walk the finished unit with you against the drawings. If something isn’t built to the permitted set, we make it right in writing – that’s the 365-Day Done Right Promise, and it’s backed in writing before the project starts, not after.
How Much Does a Junior ADU & Interior Conversion Cost in North Las Vegas?

A room-to-ADU conversion in North Las Vegas typically runs $45,000 – $85,000 all-in, drawings through final inspection. An interior JADU carved out of existing space usually lands $60,000 – $110,000, and the spread comes down to whether the electrical panel and plumbing need upgrading. An above-garage ADU runs $120,000 – $190,000 because of the structural work, and an attached addition ADU is the high end, $150,000 – $230,000 depending on square footage and how much site work the lot needs.
What moves these numbers: foundation or structural reinforcement if the existing framing wasn’t built for the load, a panel upgrade or a new subpanel, plumbing relocation, and whether the city requires a setback variance. What doesn’t move the number is the written price we give you at signing – that’s the point of Clause 1.
To avoid overpaying, get the drawings and the price quoted together and ask who pulls the permit. A cheap estimate that leaves the permit set to you is not a cheap estimate. Every free estimate from us includes a line-item written scope, the photo record from the site visit, and the permit path spelled out. If you already have a written estimate from another contractor, our free second opinion will tell you what’s missing from it before you sign. Call (866) 403-8955 for an exact quote – estimates are free.
Junior ADU & Interior Conversion Near North Las Vegas – Our Service Area
We work across North Las Vegas and the surrounding valley – Winchester, Whitney, Paradise, Spring Valley, Summerlin, Henderson, Enterprise, Boulder City, and out toward Moapa Town – connecting homeowners with independent local professionals who perform the work. Response time depends on the property and the permit path, and we’ll tell you the realistic timeline in writing rather than a number designed to get you off the phone. If you’re comparing options across the valley, the Junior ADU & Interior Conversion in Las Vegas page covers how the city’s zoning differs from North Las Vegas on the same lot type.
Serving North Las Vegas, NV – Our Local Coverage Area
We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Junior ADU & Interior Conversion in North Las Vegas

A junior ADU is a smaller, attached living unit – usually 500 square feet or less – that shares some utilities with the main house and has its own entrance, kitchenette, and bathroom. In North Las Vegas, the JADU path is often faster and less expensive to permit than a detached unit because it doesn’t add a new footprint to the lot. The catch is that it still needs a full permit set, legal egress, and a code-compliant bathroom, so an unpermitted converted bedroom is not a JADU until the paperwork says it is. Call (866) 403-8955 and we’ll tell you which conversion type your property can actually support.
A room-to-ADU or interior JADU typically takes 4 to 7 months from signed contract to final inspection, with the permit review as the biggest variable. An above-garage or attached addition ADU runs 7 to 12 months because of the structural work and the additional inspections. We give you the schedule in writing with the price, so you know what you’re planning around before you commit. Call (866) 403-8955 for a realistic timeline on your property.
Room-to-ADU conversions run $45,000 – $85,000 all-in; interior JADUs run $60,000 – $110,000; above-garage ADUs run $120,000 – $190,000; attached addition ADUs run $150,000 – $230,000. The spread comes down to panel capacity, plumbing relocation, structural reinforcement, and whether the city requires a setback variance. Every price we quote is written before any work starts, and the scope is locked at signing. Call (866) 403-8955 for an exact quote – estimates are free.
Yes – we specify and coordinate Mighty Buildings and Plant Prefab systems inside the same design-build contract, along with Boxabl and Tuff Shed options where they fit the project. That means the site interface, the utility hookups, and the permit drawings are all handled by one team rather than split between a factory rep and a local builder. If you’re weighing a prefab route against a stick-built conversion, we’ll price both. Call (866) 403-8955 to talk through which system fits your lot.
A junior ADU conversion is planned construction, not an emergency call – nobody builds a legal dwelling unit in a day, and we won’t pretend otherwise. What we do offer is a live person who answers the phone around the clock, so your questions get answered when you’re actually thinking about them. For planned work, a realistic timeline beats a same-day promise every time. Call (866) 403-8955 any hour and a live person will pick up.
Every project is covered by the 365-Day Done Right Promise: if the finished unit isn’t built to the permitted drawings, we make it right, and that promise is in writing before the project starts. You also receive the documented photo record from every visit, so you have evidence of what was found and what was done. If something’s off, we fix it – that’s the whole warranty. Call (866) 403-8955 to review the terms before you sign anything.
Clear access to the candidate space and gather any prior permits, drawings, or inspection reports you already have, because they shorten the drawing phase. Make a list of what you want the unit to do – rental, family, long-term resale – since that changes the code path and the price. We handle the site survey, the panel and plumbing checks, and the pre-application meeting with the city. Call (866) 403-8955 to schedule your free estimate and get the photo record started.
Schedule Your Junior ADU & Interior Conversion in North Las Vegas Today
If you have a garage, den, or bonus room that could become a legal unit, the next step is a site visit and a written price. Call (866) 403-8955 for a free, no-obligation estimate on your junior ADU or interior conversion in North Las Vegas – a live person answers around the clock, and if you already have a written estimate in hand, ask for the free second opinion. You’ll get a line-item scope, a permit path, and a price that holds. Estimates are free, and the price is written before any work begins.
Written by the team at Ellery ADU Studio.





