A Ellery company - serving North Las Vegas, NV
A new backyard ADU at golden hour seen from the main house patio
Ellery · North Las Vegas, NV

ADU in North Las Vegas - Design, Permits and Build Under One Contract

Backyard ADUs, garage conversions and additions for homes in North Las Vegas and the towns around it. A free site visit and one written price.

Work is performed by our local vetted partner.

4.7/5 rating · A local team serving North Las Vegas and nearby

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas

Start where you are

Just looking

Browse finished ADUs and conversions and see what each kind of build involves.

Browse builds

Making a plan

See how an ADU is designed, permitted and priced, and the promise behind the work.

How we work

Ready for a price

Book a free site visit and get a written, line-item price.

Book a site visit

Our most-requested builds in North Las Vegas

An ADU for every lot

Pick a build or a step to see what it covers, how it starts and one thing worth knowing before you begin.

Ways to add a unit Before the build
A new two-story ADU over a garage

Detached ADUs

What it covers: A new home of its own in the backyard: foundation, framing, utilities, kitchen, bath and finishes, built to the plans the city approved.

How it starts: With a look at the lot: setbacks, access for equipment and where the utility lines can run.

Good to know: Where the sewer line can reach often decides where the ADU goes, so it is checked before the design.

An attached garage converted into living space

Garage conversions

What it covers: A garage turned into a legal living unit: insulation, windows, a raised and finished floor, a kitchenette and a bathroom.

How it starts: By checking the slab, the ceiling height and the parking rules before anything is designed.

Good to know: Converting an existing garage is often the quickest path to an ADU, because the walls and roof are already there.

The sitting area and efficiency kitchen of a junior ADU

Junior ADUs

What it covers: A suite carved from space inside the house, with its own entrance and a compact kitchen.

How it starts: With a floor plan of the rooms that could become the suite, and where its entrance would go.

Good to know: A junior ADU stays inside the existing walls, so it skips the cost of a new foundation.

ADU plans, samples and a small model on a desk

Design & permits

What it covers: A site survey, floor plans, structural and energy calculations, and the permit set the city reviews.

How it starts: With what the household needs: a rental, a home for a parent, an office or a studio.

Good to know: Plan review can take more than one round; drawings that answer the city checklist up front save weeks.

A utility trench with new sewer pipe and conduit

Site prep & utilities

What it covers: Clearing, grading, trenching and new water, sewer and electrical lines run out to the new unit.

How it starts: By locating every existing line in the yard before the first trench is dug.

Good to know: An ADU often needs a larger electrical panel, so it is priced in from the start.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Small homes that live large

Vaulted ceilings, compact kitchens, private decks and smart storage: the details that make a small home feel bigger.

Read our ADU guides
The living room inside a new ADUA compact kitchen inside a new ADUA bedroom and desk inside a converted garageA small deck outside a new ADUThe bathroom inside a new ADUAn efficiency kitchen in a junior ADU

What Our Customers Say

Homeowners around North Las Vegas, in their own words.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
Mireille T. May 2026
★★★★☆

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
Stefan B. April 2025
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.
Helena V. December 2024
★★★★☆

"Handled the whole planning process. We went to one hearing and that was it."

Rowena C.
Rowena C. June 2025
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. July 2026
★★★★★

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

Benedict H. October 2025
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. July 2026

Frequently Asked Questions

Straight answers about how we work.

Guides and straight answers

Planning help from people who do this work every day.

Local Service Coverage
Part of Ellery

We Are the North Las Vegas Team for Ellery.

Ellery was founded in 2015, the year California's ADU law changed and the permitting queue became the actual product. It is a design-build studio rather than a contractor: the drawings, the permit set and the build are one contract with one price, because the ADU projects that go wrong are almost always the ones where the designer and the builder can each blame the other.

Same training, same parts, same pricing practice, and the same Done Right Promise - delivered by people who live here.

Visit Ellery →
The family

Part of the Haven Family.

Haven is a family of home-service brands held to one written standard, and Ellery is the ADU company in it. One promise stands behind every trade, in every town.

Discover Haven →

Request a Free Estimate in North Las Vegas

Tell us what you need - Ellery ADU Studio North Las Vegas responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch