A Ellery company - serving North Las Vegas, NV
A new modern detached ADU in a backyard
New Detached ADU · North Las Vegas, NV

New Detached ADU in North Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A new bathroom inside a converted garage
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Trusted New Detached ADU for North Las Vegas Homeowners

A new detached ADU in North Las Vegas is a second, fully separate home on your lot – its own foundation, its own address, its own utilities – and it typically runs $185,000 – $340,000 all-in from drawings through final inspection. The permitting is the hard part, and in North Las Vegas the rules are unforgiving: the city counts lot coverage, setback, and parking against you before it counts anything else. Our technicians have up to 11 years of experience with exactly this kind of work, and we quote in writing before anyone touches your lot (Haven Standard, Clause 1). Call (866) 403-8955 and a live person answers, day or night.

Call (866) 403-8955

What Our New Detached ADU Service Includes

Every detached ADU we take on is a single contract: drawings, permit set, and construction under one written price. You don’t get a designer who blames the builder, or a builder who blames the plans. Here’s what sits under that category.

Custom Built ADU

A custom built ADU is drawn to your lot, your setback math, and your household – not adapted from a stock plan. You need it when the lot has an awkward shape, an existing easement, or a grading issue that prefab can’t absorb. We handle the design and permitting ourselves and lock the construction scope at signing, so the number on the contract is the number you pay unless you change it in writing.

Custom Built ADU

Prefab ADU Installation

Prefab ADUs arrive as a manufactured shell and get craned or trucked onto a prepared foundation, which can cut months off a build. It’s the right call when your lot is flat, accessible, and the city’s setback arithmetic leaves you a clean rectangle to work with. We specify and coordinate the modular brands named below within the same contract – foundation, utility tie-ins, and final inspection included, not farmed out.

Prefab ADU Installation

Modular ADU

Modular construction means box sections built off-site and assembled on your lot, and it makes sense when you want the speed of prefab with more interior flexibility than a single-shell unit allows. North Las Vegas lots near the older subdivisions often have tight rear access, and modular pieces can be sized to what the alley or side yard will actually take. We coordinate the delivery logistics and the crane schedule as part of the build, not as an extra.

Modular ADU

Studio ADU

A studio ADU is the smallest detached footprint that still counts as a full second dwelling – one open room, a kitchen, a full bath. It’s usually the right choice when the lot is tight or the intended use is rental income rather than family housing. Because studio plans sit closest to the lot-coverage line, we run the setback and coverage math before we draw anything.

1-Bed & 2-Bed ADU

A one-bed detached ADU gives you a genuine bedroom wall, which matters for privacy and for rental appeal; a two-bed is the configuration most families land on for aging parents or adult children. Two-bed units drive the lot-coverage and parking calculations hardest, and North Las Vegas reviews those numbers closely. We model both scenarios against your specific parcel before you commit to a size.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Brands We Service for New Detached ADU

We work with Mighty Buildings systems, where the panelized shell arrives largely finished and the trade coordination shifts to the foundation and utility connections – the part that actually determines whether the install goes smoothly. We also specify Boxabl units for tight lots where delivery access is the binding constraint, and coordinate the crane and set schedule around what the street and side yard will allow.

Plant Prefab is another system we coordinate regularly, and it rewards a team that reads the shop drawings closely: the panel breaks have to match the foundation plan exactly, and small dimensional mismatches get expensive fast. Whether your project calls for Mighty Buildings, Boxabl, Plant Prefab, or any other make, we can help.

Signs You Need New Detached ADU Right Now

  • You’ve outgrown the main house. An adult child back home, a parent who needs to be close but not in the same kitchen, or a home office that’s taken over a bedroom. A detached unit solves it without moving.
  • Your lot has unused rear or side yard. North Las Vegas parcels in the older tracts often have a rear yard deep enough for a 600 – 1,000 sq ft footprint once setbacks are applied. That space earns nothing today.
  • You’re carrying a mortgage you’d like help with. A permitted detached ADU is rentable space, and lenders increasingly count it. An unpermitted one does the opposite.
  • You’ve got a written estimate from someone else. Bring it to us. We provide a free second opinion on any written estimate you already hold, and we’ll tell you what’s missing from the scope.
  • Your existing structure is aging out. If you’re weighing a garage conversion against a new build, the age of the slab and the roof line usually decides it. We’ll measure and tell you which one the numbers favor.

If more than one of these sounds familiar, you’re past the point where more research helps. Call (866) 403-8955 to schedule your free estimate.

Our New Detached ADU Process – Step by Step

  1. 1
    Site and feasibility review. We measure the lot, pull the parcel data, and run the setback, lot-coverage, and parking math against North Las Vegas requirements. You get a written summary of what the parcel will actually allow before any drawing begins.
  2. 2
    Design and permit set. Our design work produces a full permit set – site plan, floor plan, elevations, structural, and energy documentation. This is the core product, not an afterthought, and it’s what the city reviews.
  3. 3
    Written price, locked. Before any work starts you receive a line-item written price covering construction, utilities, and inspection coordination (Haven Standard, Clause 1). The scope is locked at signing.
  4. 4
    Permitting and inspection. We pull the permits and manage the inspection sequence through final sign-off. You don’t chase the city; we do.
  5. 5
    Build, documentation, and handover. Construction proceeds to the permitted drawings, and you receive a documented photo record of each visit – evidence of what was found and what was done. Under the 365-Day Done Right Promise, if the finished ADU isn’t built to the permitted drawings, we make it right in writing.

How Much Does New Detached ADU Cost in North Las Vegas?

A small deck outside a new ADU

A typical studio detached ADU in North Las Vegas runs $185,000 – $240,000 all-in, drawings through final inspection. A 1-bed unit lands around $220,000 – $285,000, and a 2-bed detached ADU generally runs $265,000 – $340,000. Prefab and modular installs often price lower on the shell and higher on site work; custom builds flip that ratio.

What moves the number: foundation type (North Las Vegas caliche and expansive soils can require over-excavation), utility trench length from the main house to the new unit, sewer versus septic, and whether the lot needs grading or a retaining wall. Lot coverage limits can also force a smaller footprint than you planned.

How to avoid overpaying: get a line-item written price, not a lump sum. Ask what’s excluded. Compare the utility scope specifically, because that’s where quotes quietly diverge. And never sign a contract where the price can move after work starts.

Every free estimate from us comes with a written line-item price before any work begins, and a free second opinion if you’re already holding a competing number. Call (866) 403-8955 for an exact quote – estimates are free.

New Detached ADU Near North Las Vegas – Our Service Area

We work across the North Las Vegas area and the surrounding valley, including Sunrise Manor, Whitney, Winchester, Las Vegas, and Paradise, with projects reaching Spring Valley, Summerlin, Henderson, Enterprise, Boulder City, and Moapa Town. Scheduling is straightforward because we plan the work rather than reacting to it. If you’re comparing a new detached ADU in Sunrise Manor or a new detached ADU in Las Vegas, we’ll run the same feasibility math on that parcel. Start with our home page to see the full range of work.

Serving North Las Vegas, NV – Our Local Coverage Area

We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – New Detached ADU in North Las Vegas

The living room inside a new ADU

Schedule Your New Detached ADU Service in North Las Vegas Today

Call (866) 403-8955 to schedule your free estimate for a new detached ADU in North Las Vegas. You’ll get a written line-item price before any work begins, a permit set as the core of the contract, and the 365-Day Done Right Promise behind it. No obligation, no pressure. A live person answers 24/7. You can also review our New Detached ADU in North Las Vegas page, or link through to ADU design and permitting, garage conversion, and site prep and utilities if you’re still deciding which route fits your lot.

Written by the team at Ellery ADU Studio North Las Vegas.

Why North Las Vegas Chooses Ellery ADU Studio North Las Vegas

We set the standard for new detached ADU in North Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Las Vegas

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Las Vegas Customers Say

Trusted by homeowners across North Las Vegas and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in North Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Las Vegas.

(866) 403-8955

Request a Free Estimate in North Las Vegas

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch