A Ellery company - serving North Las Vegas, NV
A building crew carrying lumber to a backyard ADU site

Meet the Team - Ellery ADU Studio North Las Vegas

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas

Meet the North Las Vegas Team Behind Ellery ADU Studio North Las Vegas

The people you’ll work with on a North Las Vegas ADU aren’t a call center three states away. They’re the ones reading your lot survey, walking your alley-side setback, and standing in your backyard the morning the slab gets poured. Our technicians have up to 20 years of experience across design, permitting, and construction, and they work under one contract, one written price, and the Haven Standard. Here’s who you’ll actually meet.

Call (866) 403-8955

Our People

The bathroom inside a new ADU

Marcus R., Lead Technician

Marcus runs the field side of our North Las Vegas ADU projects, which means he’s the one who confirms the existing garage slab is 4 inches and within range for a conversion before anyone commits to a foundation line item. He came up through residential framing and spent years on detached garages and casitas in the older tracts off Carey Avenue, where a 1950s lot can throw you a surprise in the crawlspace. He holds you through the final inspection and walks you through the documented photo record at closeout, so you see what was found and what was done rather than a summary of how it felt. Ask him about his offset smoker. He’ll talk longer than you want.

Dana P., Senior Installer

Dana leads installations for our prefab and modular work, and she’s the reason Boxabl, Plant Prefab, and Mighty Buildings deliveries land clean in North Las Vegas instead of sitting on a flatbed blocking your driveway. She coordinates crane picks, utility tie-ins, and the small grading corrections that decide whether a module sets flush the first time. Her specialty is tight-lot placement, the narrow side-yard jobs where a setback variance – the extra distance the city requires between your new ADU and the property line – makes the difference between a build and a redesign. She keeps a folder of every permit set she’s ever staged. It’s thicker than it should be.

Rosa M., Service Coordinator

Rosa is your first call and your steady point of contact from the free estimate to the 365-Day Done Right Promise. She handles the design-and-permitting calendar, tracks each submittal through North Las Vegas and Clark County review, and makes sure the written price you signed is the written price you’re invoiced – no door-side upsells, no scope creep, because the scope is locked at signing. If you already have a written estimate from another studio, she’ll set up your free second opinion and put our findings next to theirs line by line. A live person answers when you call, and Rosa is usually the voice on the other end.

Elijah T., Apprentice

Elijah is building toward his own lead role under Marcus, and he’s on site for the parts of the job that teach you the trade fastest: formwork, framing prep, and the daily photo documentation that goes into every client’s file. He learned site safety before he learned to swing a hammer, which is how we prefer it. He’s the crew member who double-checks utility locates before a single stake goes in the ground, because hitting a gas line in a North Las Vegas front yard is a bad afternoon nobody wants. On weekends he coaches youth soccer and argues about formations with anyone who’ll listen.

One Standard, Every Job

Every crew member above works the same way, whether the job is a garage conversion off Losee Road or a detached ADU near Aliante. A written price before work starts. A documented photo record on every visit. A 365-Day Done Right Promise: if the finished ADU isn’t built to the permitted drawings, we make it right, in writing, before the project begins. Our technicians are background-checked, licensed and insured, and the license number appears on every page. Nobody hands off your project and hopes it works. The same people who quote it see it through final inspection.

How do I reach the North Las Vegas team?

Call (866) 403-8955 and a live person answers, day or night, no voicemail queue and no callback that doesn’t materialize. We’ll schedule your free estimate, bring a written price to the table, and if you’re holding another studio’s estimate, we’ll give you a free second opinion on it. Estimates are free, and there’s no pressure to sign on the first visit.

Will I work with the same people from start to finish?

Yes. Rosa coordinates your project from the first call, Marcus or Dana leads the field work, and Elijah documents each stage. You’re not routed to a different department when something changes – you call the same number and reach the same crew.

Do you pull the permits, or do I?

A small deck outside a new ADU

We do, as part of the design-and-permitting scope under your single contract. That covers drawings, submittals, and inspections, so neither the designer nor the builder can point at the other when something’s off. Call (866) 403-8955 for an exact quote – estimates are free.

Written by the team at Ellery ADU Studio North Las Vegas.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need ADU help in North Las Vegas? Licensed & insured · free written estimates
Call (866) 403-8955
Local Service Coverage

Request a Free Estimate in North Las Vegas

Tell us what you need - Ellery ADU Studio North Las Vegas responds fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch