What North Las Vegas Homeowners Say About Ellery ADU Studio North Las Vegas
Reviews are the closest a homeowner gets to walking a finished project before committing. We earn them the same way we earn the work: a written price before anything starts, a photo record of what we found and what we did, and a 365-Day Done Right Promise in writing. Nine hundred-plus ADUs designed, permitted, and built since 2015, and the words below come from North Las Vegas backyards, not a marketing team.
Recent Reviews

“We wanted a detached ADU behind the house for my mother, but our lot sits on a slight slope and I expected the grading line to balloon. Ellery’s team walked the property, wrote up the site prep with a real number attached, and held to it. The build passed its final inspection without a single change order, and the photo record they sent each week meant I never had to guess what stage we were at.”
Carlos F. – North Las Vegas, near Aliante
“Our garage conversion took eight weeks from permit pull to final, which I didn’t believe until I saw the schedule in the contract. What sold me was the second-opinion call: I already had a written estimate from another outfit, and Ellery went line by line and showed me where the ventilation and egress work had been left out. They fixed the number, not the scope, and it still came in within a few thousand of the original.”
Allison D. – North Las Vegas, near Centennial Parkway
“I’d been quoted on a prefab from one of the modular brands and had no idea how to coordinate it with the foundation, utilities, and city paperwork. Ellery specified the unit, handled the site prep and utility trenching, and kept the whole thing under one contract and one price. The city signed off on the whole package, and the crew left the yard cleaner than they found it, which in July dust is saying something.”
Maya G. – North Las Vegas, near Craig Ranch
“We used the interior conversion for a junior ADU so my college-aged son could have his own space with a separate entrance. Before any work started we had a written price, a plan drawing, and a clear note that the existing slab and framing were within range for the conversion. When inspection came up, everything passed the first time. That 365-Day Done Right Promise is in writing, and you can tell they actually mean it because the permit set matched what got built.”
Allison M. – North Las Vegas, near Lone Mountain
“Design and permitting were the part I dreaded, because everyone warned me the city would bounce the plans back. Ellery handled the setback questions before we ever submitted and walked me through the utility connections for the detached unit. The permit came back clean, the written quote from the start was what we paid, and the photos of every phase let my out-of-state brother follow along without a single phone call.”
Maya G. – North Las Vegas, near El Dorado Park
“We’d been sitting on a half-finished plan for a garage conversion for a year. Ellery gave us a free second opinion on the estimate we already had, showed us the structural and insulation details that were missing, and quoted it all at one written price with no door-side surprises. On the last walkthrough they handed us the photo record and the warranty in the same folder. Nothing was left to trust on faith.”
Carlos F. – North Las Vegas, near the new downtown
Why Customers Trust Us
Read those reviews closely and the same things surface: a written price before work starts, a photo record on every visit, and a plan set that matches what actually gets built. That’s The Haven Standard, and it’s why we pair it with a 365-Day Done Right Promise. Under one design-build contract, our background-checked crews handle ADU design and permitting, garage conversions, new detached ADUs, junior ADUs and interior conversions, and site prep and utilities, and we specify and coordinate prepab and modular systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie when a client wants one. Because we’re licensed and insured, pull the permits, and lock the scope at signing, nobody points at anybody else when something needs fixing. If you’d like a free second opinion on any written estimate you already have, call (866) 403-8955. A live person answers, and a written price comes before any work.
Written by the team at Ellery ADU Studio North Las Vegas.


