Title 24 Energy Compliance in North Las Vegas, NV
Title 24 energy compliance is the state-mandated modeling and documentation that proves your new or converted ADU meets Nevada’s energy code for insulation, glazing, lighting, and HVAC efficiency. In North Las Vegas, every permitted ADU – detached, attached, garage conversion, or junior unit – needs a compliance report signed off before the city will approve your plans. Without it, your permit stalls at plan check no matter how good the drawings look.
Ellery ADU Studio North Las Vegas handles Title 24 as part of the permit set, not as an afterthought bolted on at the end. We run the energy model alongside the architectural drawings so the numbers and the building match when the plan checker opens the file. If you’re earlier in the process, start with our home page overview, or go straight to ADU Design & Permitting for the full picture of what a permit set includes. Call (866) 403-8955 and a live person will answer – no voicemail queue.

Key Takeaways
- Title 24 energy compliance is required before North Las Vegas issues an ADU building permit; it’s part of the plan set, not a separate approval.
- Compliance reports for a typical ADU in North Las Vegas run $600 – $1,400, often less when folded into a full design and permitting package.
- The Mojave climate drives the modeling – cooling loads, glazing, and roof insulation carry more weight here than in cooler parts of the state.
- Under the Haven Standard, you get a written price before any work starts and a documented photo record when it’s done.
When You Need Title 24 Energy Compliance
North Las Vegas sits in a climate zone that puts real demands on an ADU’s envelope. The Clark County energy calculations lean hard on cooling performance, and the plan checker will look at the numbers, not the cover sheet. Here’s when Title 24 lands on your desk:
- You’re pulling a permit for a new detached ADU. Detached units get a separate energy model because the thermal envelope is new construction from the slab up. Prefab systems from Mighty Buildings or Plant Prefab come with their own factory specs, but the site-specific model still has to be run against North Las Vegas conditions.
- You’re converting a garage. Garage conversions are the most common ADU type in North Las Vegas’s older single-family neighborhoods, and an uninsulated garage wall is the first thing the energy model flags. The report tells you exactly which walls and which ceiling assemblies need upgrading to pass.
- You’re adding a junior ADU or interior conversion. Even a JADU carved out of existing square footage needs compliance when it adds a kitchen or changes the HVAC load. Windows facing west in a North Las Vegas summer are a real line item, and Title 24 is where that gets quantified.
- The plan checker kicked your submittal back. A rejected energy report – wrong climate zone, missing fenestration schedule, expired modeling software – is one of the more common reasons an ADU gets held at plan review. We re-run the model and resubmit with the corrected documentation.
- You changed the design mid-stream. Swapped windows, added a skylight, upgraded to a heat pump – any of these move the numbers, and moving the numbers means the compliance report has to be updated before final inspection.
- You got a written estimate elsewhere and want a second opinion. Free, on any written estimate you already have in hand. We read the energy scope and tell you whether the numbers are realistic for a North Las Vegas ADU.

Our Title 24 Energy Compliance Process
We run compliance as part of the permit set, which means the modeling and the drawings stay in step. Here’s the sequence:
- We inventory the building envelope. Wall assemblies, roof and ceiling insulation, window U-factors and solar heat gain coefficients, slab and foundation. On a garage conversion, that often means a site visit to confirm what’s actually there – North Las Vegas garages built in the 1990s and 2000s vary more than the permit records suggest.
- We run the energy model in approved compliance software. The model takes your specific design and produces the required documentation: the performance or prescriptive report, the fenestration schedule, and the mandatory measures checklist the city wants to see.
- We reconcile the model against the drawings. If the model says a window needs a lower solar heat gain coefficient than the drawing calls for, we flag it before submittal, not after the plan checker finds it. This is the step that saves a rejection cycle.
- We package the compliance report into the permit set. The report, the supporting calculations, and the drawings go in together. Everything the North Las Vegas building department needs to review the energy scope in one folder.
- We respond to plan-check comments. If the reviewer has questions or corrections, we handle the revision and resubmit. You don’t chase the modeling consultant – there isn’t one, because it’s all under one contract.
- We hand you the documented record. The signed compliance report, the equipment specs, and a photo record of any envelope work done on site. Under the Haven Standard, every visit produces evidence of what was found and what was done.
That last point matters at final inspection. A compliance report describes what the ADU is supposed to be. A documented photo record shows it was built that way, which is also where our 365-Day Done Right Promise has teeth: if the finished ADU isn’t built to the permitted drawings, we make it right, in writing, before the project starts.
Title 24 Energy Compliance Pricing in North Las Vegas
Compliance reports for an ADU in North Las Vegas typically cost between $600 and $1,400, depending on unit type and how much of the envelope has to be solved. Folded into a full design and permitting package, the line item is usually lower because the model runs alongside the drawings rather than as a separate engagement. Every project gets a written price before any work begins – Haven Standard, Clause 1.
| Scope | Typical range |
|---|---|
| Standalone Title 24 report, simple garage conversion | $600 – $850 |
| Standalone report, new detached ADU | $850 – $1,400 |
| Compliance folded into a full design + permitting package | Reduced line item, quoted in the package |
| Re-run after a design change (window swap, HVAC upgrade) | $250 – $500 |
| Second opinion on an energy scope you already have | Free |
What moves the number: the unit type, whether the envelope is existing or new, how many design iterations the model goes through, and whether the submittal needs to clear plan-check comments. A garage conversion with a straightforward envelope sits at the low end. A detached ADU with a lot of west-facing glazing in a North Las Vegas summer pushes toward the high end, because the model has to work harder to hit the performance target without over-specifying the windows.
We don’t quote a number before we’ve read the design. What we do is put the range in front of you on this page, then give you a written price that holds. Free second opinion on any written estimate you already have – call (866) 403-8955. Our technicians have up to 11 years of experience, and a live person answers the phone 24/7.
FAQs – Title 24 Energy Compliance
What is Title 24 energy compliance, in plain terms?
Title 24 is Nevada’s energy code, and a compliance report is the document that proves your ADU meets it. The report models your building’s insulation, windows, lighting, and HVAC against the code’s requirements and produces a signed package the city reviews with your permit. Without it, the plan set is incomplete.
Is a Title 24 report required for a garage conversion ADU in North Las Vegas?
Yes. A garage conversion changes the use of the space and the thermal envelope, so it needs a compliance report even though no new square footage is being added. The report identifies which walls, ceilings, and windows need upgrading to meet the code, and that list becomes part of the scope. Call (866) 403-8955 for an exact quote on your conversion – estimates are free.
How much does Title 24 compliance cost in North Las Vegas?
Between $600 and $1,400 for a standalone ADU report, usually less when it’s part of a design and permitting package. Garage conversions sit at the low end; detached units with significant glazing sit at the high end. Every project gets a written price before work begins, and a second opinion on any written estimate is free – call (866) 403-8955.
Can you fix a Title 24 report the city rejected?
Yes. Rejections usually trace to a wrong climate zone, a missing fenestration schedule, or an outdated modeling tool, and we re-run the model against your actual design and resubmit. If the ADU is already framed, we’ll also confirm on site that the installed envelope matches the report so the final inspection doesn’t catch a mismatch later. Call (866) 403-8955 and we’ll review the rejection notice with you.
Title 24 compliance is one line in a permit set, but it’s the line that decides whether your North Las Vegas ADU moves through plan check or sits in the queue. We model it against your real design, reconcile it with the drawings before submittal, and hand you a documented record when it’s done. Whether you’re converting a garage, building detached, or adding a junior unit, we quote the whole scope at one written price under the Haven Standard, and prefab systems from Mighty Buildings, Boxabl, and Plant Prefab get coordinated within that same contract. Call (866) 403-8955 for a free estimate – a live person answers.
Written by the team at Ellery ADU Studio North Las Vegas, serving North Las Vegas.