A Ellery company - serving North Las Vegas, NV
A backyard ADU foundation formed and ready to pour
ADU Site Prep & Utilities · Whitney, NV

ADU Site Prep & Utilities in Whitney - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
A compact kitchen inside a new ADU
A kitchenette inside a converted garage
A new modern ADU with wood cladding
A new bathroom inside a converted garage
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Site Prep & Utilities Across Whitney

If you’re planning a casita or garage conversion on your Whitney lot, the ground under it decides everything. Site prep and utilities are where Whitney projects live or die: an aging septic tank nobody mapped, monsoon drainage that has to work before the first rain, a foundation that has to hold through 105°F summers. We work with independent local professionals who know this ZIP code, this soil, and this county’s inspection process, and we answer the phone at (866) 403-8955 whenever you call. You get a written price before any work begins and a documented photo record when the work is done. That’s ADU Site Prep & Utilities as we run it, on one contract.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Whitney’s Preferred ADU Site Prep & Utilities Company

A fresh concrete slab for a backyard ADU

Whitney homeowners aren’t shopping for a handshake. They’ve bought at a high price and they want the paperwork to match the promise, so we lead with the permit set and the written scope, not with a pitch.

The word “preferred” gets thrown around loosely. Here’s what it means on our side: a written price before work starts on every project (Haven Standard, Clause 1), a documented photo record on every visit, and the 365-Day Done Right Promise, which says in writing that if the finished ADU isn’t built to the permitted drawings, we make it right. Our technicians have up to 11 years of experience, and the license number appears on everything we hand you, verified, not just claimed.

When you’ve got a written estimate in hand from someone else and something about the septic or drainage line looks thin, a Free Second Opinion is available. A live person answers calls 24/7, no voicemail queue, no callback that never comes. For Whitney specifically, our familiarity is with unincorporated Clark County’s ADU review path, not just the city of Las Vegas path, and those are different animals. Same-day scheduling isn’t how a job like this works, and we won’t sell it that way. We’ll give you a start date and a written scope, and then we’ll hold to both.

Our ADU Site Prep & Utilities Services in Whitney

Four items carry most of the load on a Whitney lot. Each gets its own line item in the written quote, drawings through final inspection, so you can see what a compliant job actually costs next to a cheap one.

Foundation & Grading

A typical ADU foundation and grading package in Whitney runs $14,000 – $32,000 depending on soil conditions, slope, and how much grading the drainage plan requires. Because Whitney sits in unincorporated Clark County, that work has to satisfy the county’s new state-mandated ADU ordinance while also managing monsoon drainage. Grading is set for positive fall away from the structure, since flash flooding in the eastern valley has a way of finding the low side of a fresh slab.

Electrical Panel Upgrade

Panel upgrades for a Whitney ADU typically run $3,500 – $9,000, and the number hinges on your existing service rating and how much load the new unit adds. Plenty of 1970s – 1990s tract homes here still run on a panel sized for the original house. Adding an ADU’s HVAC, water heating, and kitchen circuits usually means a panel change and a service allowance, all permitted and inspected as part of the same contract.

Plumbing Lateral

Plumbing laterals, including tie-ins and any reroute around an aging septic line, generally land between $4,000 – $12,000 in Whitney. The variable is almost always the septic: older pockets off Boulder Highway often still run on tanks that have to be located, then decommissioned or rerouted before the new lateral goes in. Coordinate that in the wrong order and you pay for the slab twice.

Gas Line Extension

Gas line extensions for an ADU run $2,200 – $6,500 in Whitney, depending on run length from the meter and whether the trench is shared with other utilities. Desert heat pushes a lot of Whitney homeowners toward gas for water heating and cooking, and the routing has to stay clear of the septic field and drainage swales. Every run gets pressure-tested and inspected.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Whitney

We specify and coordinate prefab and modular systems from brands including Plant Prefab, Abodu, and Tuff Shed, along with James Hardie cladding on the shell. On prefab projects the site work and the panel work have to line up to the same drawings and the same inspection sequence, or the module sits on a truck while somebody re-pours a footing. Because the drawings, the permit set, and the construction are one contract at one written price, that sequencing lives in one place. We don’t stock parts and we don’t run trucks; we coordinate the local professionals who do the work, and the documentation comes back to you.

Common ADU Site Prep & Utilities Problems We See in Whitney Homes

  • A slab poured over an unmapped septic tank. In the older tract pockets, the tank was never documented, so a foundation gets poured and the inspection fails on the septic decommission. Rework at that stage runs into five figures and a re-permit.
  • Grading that ignores monsoon flow. Whitney’s detached units sit on lots graded for the original house, before the state-mandated ADU rules added drainage review. Water pools against the new foundation in the first August storm, and the fix is excavation, not caulking.
  • Wind and storm-load compliance left off the shell and roof. This is the quiet one. An ADU built without documented load compliance can void an insurance claim or raise your premium after a monsoon event, and the paperwork has to exist before the work, not after.
  • Utility sizing built for a house, not a second dwelling. Original panels and laterals on a 1980s Whitney home were never sized for a second kitchen and an HVAC system running through 105°F summers. The upgrade is cheaper planned than discovered.

Pricing for ADU Site Prep & Utilities in Whitney, NV

Site prep and utilities for a Whitney ADU typically total $24,000 – $60,000 across foundation, grading, electrical panel, plumbing lateral, and gas line, with landscaping and hardscape quoted separately. What moves the number: septic decommissioning or reroute, how much grading the drainage plan requires, service panel rating, and trench length. What doesn’t move the number is the written quote itself, because under Haven Standard Clause 1 the scope is locked at signing, drawings through final inspection. No change orders mid-project because a line got missed during estimating. We don’t give a range over the phone and call it done; you get a written price before any work starts, and if you already have a written estimate from someone else, the Free Second Opinion on it is free in the literal sense.

We Also Serve Cities Near Whitney

Projects in Whitney sit next to work in Sunrise Manor, Winchester, Paradise, and Las Vegas, and we coordinate site prep across those lines under the same single-contract model. What changes is the jurisdiction: unincorporated Clark County reviews differently than the city does, and septic and drainage rules shift with it. If your project straddles a boundary, that gets settled in the permit set, not after the pour.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Site Prep & Utilities in Whitney

A utility trench with new sewer pipe and conduit

Get Your Whitney ADU Site Prep & Utilities Estimate

Every project gets a written price before any work begins, drawings through final inspection, under one contract. Call (866) 403-8955 to schedule your free estimate, or to hand us a written estimate you already have for a Free Second Opinion. A live person answers 24/7. You’ll get a documented photo record on every visit and the 365-Day Done Right Promise in writing, and no change orders because a septic line got discovered late.

Written by the team at Ellery ADU Studio.

Why Whitney Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU site prep & utilities in Whitney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Whitney

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

Trusted by homeowners across Whitney and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
The sitting area and efficiency kitchen of a junior ADUThe living room inside a new ADUA bedroom and desk inside a converted garageA new two-story ADU over a garageAn attached garage converted into living spaceThe private side entrance of a junior ADU

More ADU services in Whitney

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Whitney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Whitney.

(866) 403-8955

Request a Free Estimate in Whitney

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch