ADU Specials in North Las Vegas, NV
We’d rather show you a real offer than a fake countdown. Call (866) 403-8955 and the first thing you’ll get is a written price, not a pitch. Our North Las Vegas specials exist for one reason: to remove the guesswork that keeps homeowners from starting an ADU project they’ve been thinking about for years. Every offer below ties to work we already document, warrant, and quote in writing.
Current Offers

Free ADU Feasibility Consultation & Site Walk
We walk your North Las Vegas property, check the setbacks and lot coverage against city code, and tell you in plain terms what actually fits. This is the visit where most homeowners learn their garage conversion is a simpler path than the detached unit they came in asking about. Qualifies for any residential lot inside North Las Vegas city limits. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.
Free Second Opinion on Any Written ADU Estimate
Already have a bid in hand from another contractor? Send it over and we’ll review it line by line, flag anything missing from the scope, and tell you where the allowances look thin. We’ve seen plenty of North Las Vegas estimates that quote the build but forget the utility trench or the permit fees. No obligation to hire us. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.
Written Price Before Work Starts – On Every ADU Project
Under Haven Standard Clause 1, every project gets a written price before any work begins, and that applies to garage conversions, detached units, and interior conversions alike. Our in-house designer and our build team sit under one contract, so no one can point at the other when a number moves. Fixed pricing with no change orders on a locked scope. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.
Prefab & Modular System Sourcing At No Added Fee
We coordinate prefab and modular systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie, and we don’t add a middleman markup for specifying them within your contract. If a factory-built unit makes more sense for your North Las Vegas lot than site-built, we’ll tell you so. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.
365-Day Done Right Promise – Standard on Every ADU
If the finished ADU isn’t built to the permitted drawings, we make it right, in writing, before the project even starts. That’s the 365-Day Done Right Promise, and it comes standard rather than as an upgrade. Applies to every design-build category we offer: design and permitting, garage conversion, new detached ADU, and junior ADU or interior conversion. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.
Documented Photo Record on Every Visit
Clients get evidence of what was found and what was done, not a summary of how it felt. You receive photos at each stage, from slab inspection through framing to final, so you can see the work whether you’re standing on site or across the country. Comes standard on every North Las Vegas project. Valid through March 31, 2027. Mention this offer when you call (866) 403-8955.
How to Redeem
- Call and mention the offer. Dial (866) 403-8955, name the special you want, and a live person takes it from there. No voicemail queue.
- Book the visit. We schedule your site walk or estimate review at a time that works, and you’ll know who’s arriving and when.
- Present it at service. Reference the offer when our team arrives, and it comes off your written price before work starts.
Why Our Offers Work Differently
Most ADU “specials” you’ll see around North Las Vegas are discount codes stacked on top of a number that was never firm to begin with. We don’t play that game. Since 2015 we’ve designed, permitted, and built 900+ ADUs, every one with a written price before work started and a documented photo record when work was complete. Our technicians bring up to experience on each project, and our crews are background-checked and uniformed, with our license number on every page. An offer from us removes friction from a real price; it doesn’t hide one.
What These Offers Don’t Cover
To keep things honest: our specials don’t include permit fees, utility connection costs, or site-prep work that a specific North Las Vegas lot turns up during the site walk. Those get itemized in your written quote so you see them coming. We also don’t discount a scope we haven’t inspected yet. That’s why the free feasibility visit comes first.
Frequently Asked Questions

No. Just mention the offer by name when you call (866) 403-8955 or when our team arrives for your visit. We’ll note it on your written price. Call for an exact quote – estimates are free.
Often, yes. The feasibility consultation, second-opinion review, and photo record stack naturally because they’re separate stages of the same project. A live person will confirm which offers apply to your North Las Vegas property when you call (866) 403-8955.
Not on a locked scope. Under Haven Standard Clause 5, the scope is set at signing; no door-side upsells, no scope creep. If site conditions turn up something the written quote didn’t anticipate, we bring you a written change before any work happens. Call (866) 403-8955 for a free estimate.
All current offers are valid through March 31, 2027. After that date, call (866) 403-8955 and we’ll tell you what’s running.
Written by the team at Ellery ADU Studio North Las Vegas.


