A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
North Las Vegas, NV

ADU Services in North Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The sitting area and efficiency kitchen of a junior ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in North Las Vegas, NV

North Las Vegas is not a city that rewards guesswork on an ADU. The lot’s relationship to flood control, drainage easements, and HOA overlays matters as much as the zoning code here, and the answers change block by block. We start every North Las Vegas project with a permit set built on your actual parcel data – not a floor plan dropped onto a plat map. If you already have a written estimate in hand, we’ll review it free. Call (866) 403-8955 and a live person answers, day or night.

Call (866) 403-8955

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Why North Las Vegas Homeowners Choose Ellery ADU Studio North Las Vegas

The bathroom inside a new ADU

We lead with documentation because that’s what this decision deserves. Every North Las Vegas client receives a written permit set, a photo record on every visit, and a written scope locked at signing under Clause 5 of The Haven Standard (No Surprises) – no door-side upsells, no scope creep. Pricing follows Clause 1: a written price before any work starts, and the phrase “call for a quote” doesn’t appear on our site because it doesn’t apply. A homeowner in Aliante and one off Civic Center get the same evidence trail. If the finished ADU doesn’t match the permitted drawings, the 365-Day Done Right Promise makes it right, in writing, stated before the project begins.

Our technicians have up to 11 years of experience, background-checked and uniformed, and crews are coordinated through independent local professionals who know the North Las Vegas building department’s review rhythm. We’ve designed, permitted, and built 900+ ADUs since 2015 – the year California’s ADU landscape shifted – and we treat the North Las Vegas permit set as the core product. Learn more about how we work on our home page.

ADU Services We Offer in North Las Vegas

Five service categories, one contract, one written price. Here’s what each covers.

ADU Design & Permitting

We produce the drawings, the full permit set, and manage submittal through the North Las Vegas building department. Site constraints like wash adjacency and drainage easements get resolved on paper before a foundation is scheduled. Learn more about our ADU Design & Permitting in North Las Vegas.

ADU Design & Permitting

Garage Conversion ADU

Older postwar ranches near the downtown core often have detached garages on generous lots – the most common North Las Vegas conversion we see. We check the existing slab and clearances, then specify the conversion in writing. Learn more about our Garage Conversion ADU in North Las Vegas.

Garage Conversion ADU

New Detached ADU

Detached units need the right pad location, drainage respect, and setback variance handled early – the extra distance the city requires between your new ADU and the property line. We coordinate systems from Abodu and Plant Prefab within the same contract. Learn more about our New Detached ADU in North Las Vegas.

New Detached ADU

Junior ADU & Interior Conversion

For North Las Vegas homes where the buildable envelope is tight, an interior conversion or JADU can unlock rental income without new site work. We size it to the existing footprint and permit it cleanly.

ADU Site Prep & Utilities

Grading, pads, utility runs, and the drainage work that monsoon season makes non-negotiable. We document what we found and what we did, with photos at every visit.

Neighborhoods We Serve in North Las Vegas

Response across these areas is generally within one business day for a site assessment.

  • Aliante and the northern production subdivisions
  • Civic Center and the downtown core
  • The Nellis / DECATUR area
  • Along the Las Vegas Blvd / 5th St corridors

Why North Las Vegas’s Climate & Housing Affect ADU

North Las Vegas splits into two very different ADU problems. In the older central grid near downtown, the postwar block-and-stucco ranches sit on lots generous enough for a real detached unit or a garage conversion. Out north and west, the 1990s-2010s subdivisions in Aliante and the Nellis/DECATUR area run small, tightly set lots with HOA overlays that make detached ADUs hard to site. Then comes the local wrinkle most contractors miss: a lot backing onto a regional flood-control wash or drainage easement behind the block wall – a genuine North Las Vegas pattern on the northern subdivisions – kills the pad location the homeowner had in mind. That forces a redesign of a detached unit into an attached build or a garage conversion. Add 115°F+ summers, and the design leans on deep roof overhangs, high-efficiency mini-split cooling, and shading. The city is more permissive on paper than Clark County or Henderson, but on newer Nellis/DECATUR-adjacent lots the buildable envelope is often eaten by drainage easements.

Pricing for ADU in North Las Vegas

A small deck outside a new ADU

These are honest ranges, not teasers. Every project is quoted with a written price before work begins, per Haven Clause 1.

  • Garage conversion ADU: typically $95,000 – $165,000 all-in, drawings through final inspection.
  • Junior ADU / interior conversion: typically $65,000 – $115,000.
  • New detached ADU: typically $180,000 – $310,000 depending on pad, utilities, and drainage work.
  • Design & permitting as a standalone line: typically $12,000 – $28,000, credited back when we build.

Site prep and utility runs vary with wash proximity and existing grading; those numbers land on your written quote, not a phone estimate. Call (866) 403-8955 to schedule your free estimate – the price is written before any work starts.

Service Area – Cities Near North Las Vegas

We also handle ADU projects in Las Vegas, Sunrise Manor, Winchester, and Whitney. Same contract model, same written price, same photograph record on every visit across the valley.

Serving North Las Vegas, NV – Our Local Coverage Area

We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in North Las Vegas

The private side entrance of a junior ADU

Ready to get started? Free estimates in North Las Vegas
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Las Vegas Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in North Las Vegas

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in North Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in North Las Vegas. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch