A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
Las Vegas, NV

ADU Services in Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The sitting area and efficiency kitchen of a junior ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in Las Vegas, NV

If you own a post-2000 tract home in Las Vegas and you’re trying to figure out whether a backyard unit can actually get built, the answer is usually yes, but the path runs through your HOA before it runs through the city. We’re Ellery ADU Studio North Las Vegas, and we work on ADUs across the valley under a single design-build contract: the drawings, the permit set, and the construction at one written price agreed before any work starts. Call (866) 403-8955 and a live person answers, day or night.

Call (866) 403-8955

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Why Las Vegas Homeowners Choose Ellery ADU Studio North Las Vegas

The bathroom inside a new ADU

Most ADU projects go sideways in the gap between the person who drew the plans and the person who built from them. Our design-build model closes that gap by contract, not by goodwill. Every Las Vegas project we take on carries a written price before work begins (Haven Standard, Clause 1), a documented photo record of what was found and what was done on every visit, and the 365-Day Done Right Promise: if the finished ADU isn’t built to the permitted drawings, we make it right, in writing.

Our technicians have up to 11 years of experience, and they’re background-checked and uniformed. We’ve designed, permitted, and built 900+ ADUs since 2015, every one with a written price before work started. Homeowners in Summerlin and Centennial Hills tend to come to us after a first bid left half the scope undefined; we’ll give a free second opinion on any written estimate you already have in hand. If you’re weighing a garage conversion against a ground-up build, start with our Garage Conversion ADU in Las Vegas page to see which one fits your lot.

ADU Services We Offer in Las Vegas

ADU Design & Permitting

The permit set is the product here, not an afterthought. We handle the drawings, the HOA architectural review submittal, and the city permit in one sequence so nothing sits idle. Learn more about our ADU Design & Permitting in Las Vegas.

ADU Design & Permitting

Garage Conversion ADU

Less common in Las Vegas than in older cities, because most of the valley’s housing stock is post-1990 tract construction with attached garages that carry the main electrical panel and laundry. When a conversion does pencil out, it’s the fastest route to a rentable unit. Learn more about our Garage Conversion ADU in Las Vegas.

Garage Conversion ADU

New Detached ADU

This is what most Las Vegas projects turn out to be: a ground-up studio or one-bedroom in the backyard space behind the pool, designed for a pre-poured postage-stamp lot. We specify and coordinate prefab and modular systems from brands like Boxabl and Plant Prefab when they suit the site. Learn more about our New Detached ADU in Las Vegas.

New Detached ADU

Junior ADU & Interior Conversion

A JADU carved out of existing interior square footage can add housing without touching the rear yard or the lot coverage limits, which matters on the smaller lots in 89108. We scope the egress, the kitchenette, and the separate entrance in the same permit set. Learn more about our home services overview for how this fits the rest of the lineup.

ADU Site Prep & Utilities

Flat lots, hard caliche soil, and long utility runs to the rear corner of the property. We price the trenching, the panel upgrade, and the slab separately so you can see exactly what the ground is costing you before you commit.

Neighborhoods We Serve in Las Vegas

We work across the valley’s newer subdivisions and its smaller older core. Typical response time for a site visit in the Las Vegas service area is two to three business days.

  • Summerlin and The Ridges (89128, 89149)
  • Centennial Hills and Providence (89149)
  • Aliante and the northern 89130, 89131 corridor
  • Spring Valley and the western 89108, 89128 side
  • Southern Highlands and the south valley

Why Las Vegas’s Climate & Housing Affect ADU

Las Vegas is a valley of hyper-new, fast-built subdivisions, and that shapes ADU work here more than any building code. Nearly every lot sits inside a master-planned community governed by strict HOA CC&Rs, and since AB 135 passed in 2019, those HOAs are required to allow ADUs. That law turned HOA architectural review into the real first hurdle for most Las Vegas projects, not city permitting, and it can add weeks before the permit clock even starts. Meanwhile the city’s older core is tiny relative to the sprawl, so the work is overwhelmingly new-construction detached units on post-2000 tract lots rather than conversions of existing structures.

Then the desert. Summer highs routinely top 110°F and the valley gets under 5 inches of rain a year, so an ADU here needs aggressive insulation, deep roof overhangs, and a high-SEER mini-split sized for real peak load, not a catalog average. Flat and low-slope roofs are common and have to be detailed for intense UV and monsoon downbursts. In ZIPs like 89149 and 89130, the side-yard setback and rear-lot coverage limits often force the ADU footprint into a 20-foot-wide strip beside the pool equipment. We design for that reality, and we say what we found: if your existing slab or panel won’t carry the load, you’ll see it in the line item, not in a surprise later.

Pricing for ADU in Las Vegas

A small deck outside a new ADU

Every project is quoted with a written price before any work begins, so the ranges below are starting points, not estimates we’ll renegotiate once the permit set is drawn.

  • Garage conversion ADU: typically $95,000 – $160,000 all-in, drawings through final inspection.
  • New detached studio or 1-bedroom ADU: typically $180,000 – $320,000, depending on utility distance and roof design.
  • ADU design and permitting only: typically $9,000 – $22,000, HOA submittal included.
  • Site prep and utilities: typically $18,000 – $45,000 for trenching, panel work, and slab on a typical valley lot.

Under Clause 5 (No Surprises), the scope is locked at signing. No door-side upsells, no scope creep. Call (866) 403-8955 for your written price; the second opinion on an estimate you already hold is free.

Service Area – Cities Near Las Vegas

We take on ADU projects throughout the Las Vegas valley, including Winchester, North Las Vegas, Sunrise Manor, and Paradise. Each municipality runs its own permit counter and its own review timeline, and we know the difference before we file. If your lot sits near a city line, tell us the cross streets and we’ll confirm which jurisdiction you’re in.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in Las Vegas

A kitchenette inside a converted garage

Ready to get started? Free estimates in Las Vegas
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Las Vegas

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Las Vegas. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch