A Ellery company - serving North Las Vegas, NV
A new modern detached ADU in a backyard
New Detached ADU · Paradise, NV

New Detached ADU in Paradise - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
A bedroom and desk inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Paradise

If you’re planning a new detached ADU in Paradise, the first thing to understand is that there’s no Paradise city hall to approve it. Your project runs on Clark County ADU criteria, the state’s AB 273 rules, and whatever your HOA’s deed restrictions say. We know that layered path well, and we write the permit set for it before anything gets staked. Call (866) 403-8955 and we’ll talk through your lot in 89105, your setbacks, and what a detached unit can realistically be on your parcel.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Paradise’s Preferred New Detached ADU Company

A small deck outside a new ADU

Paradise isn’t a city, so the ADU work here gets decided by county jurisdiction, HOA overlays, and the age of the housing stock, and that’s exactly where we focus. Our technicians have up to 11 years of experience, and every project comes with a written price before work starts and a documented photo record on every visit.

Homeowners across Paradise, from the mid-century tracts near the Convention Center corridor to the resort-adjacent lots off Flamingo, come to us because the permit set is the product, not an afterthought. If you already have a written estimate in hand from someone else, we’ll give you a free second opinion on it. Under our 365-Day Done Right Promise, if the finished ADU isn’t built to the permitted drawings, we make it right in writing, before the project even begins.

Our New Detached ADU Services in Paradise

We bring custom and prefab detached units under one contract at one written price, which matters here because Paradise projects often involve both a site-built foundation and a manufactured panel system. Here’s how each service looks in Paradise specifically.

Custom Built ADU in Paradise

A custom detached unit in Paradise starts with the county’s ADU criteria plus your HOA overlay, then works backward to a footprint your lot can actually hold. Many mid-century tract parcels here are hemmed by existing block wall and squeezed by setbacks, so the design has to clear plan-check comments on height, glazing, and cooling before a slab is ever graded. Custom framing lets us shape the unit to those constraints rather than forcing a stock plan onto the lot.

Custom Built ADU in Paradise

Prefab ADU Installation in Paradise

Prefab installation in Paradise means sequencing the panel delivery to land after county approval, not before, so the site isn’t sitting half-finished waiting on a committee. We coordinate systems from brands like Plant Prefab and Mighty Buildings within the same contract, which keeps the foundation crew and the panel crew on one schedule. On caliche-heavy soil, the foundation and drainage work in Paradise gets settled first, then the panels drop in.

Prefab ADU Installation in Paradise

Modular ADU in Paradise

Modular units work well on Paradise lots where the backyard looks bigger on paper than it is, because a factory-built module arrives finished and reduces on-site time. We handle the survey and utility locate before anything is staked, since shallow 1960s-era lines and block walls dictate where a module can sit. The county still reviews the plan set, and we file it and carry it through.

Modular ADU in Paradise

Studio ADU in Paradise

A studio detached ADU is often the right fit for Paradise’s smaller, irregular backyards, where a 1-bed or 2-bed footprint simply won’t clear setbacks. Studio units still need desert-spec insulation, shaded or east/west-oriented glazing, and efficient cooling to pass energy and livability checks under Mojave heat. We size the studio to the lot and the HOA’s height limits, then build the schedule around county review.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Paradise

We specify and coordinate prefab and modular systems from Plant Prefab, Mighty Buildings, Boxabl, and Tuff Shed, among others, and we handle each within the same single contract that covers drawings, permits, and construction. We don’t claim to stock parts or units locally; what we do is match the right system to your Paradise lot, your HOA overlay, and the county’s approval criteria. If a panel or module system fits your site, the design-build process stays coordinated, and your review calendar and delivery schedule are planned together rather than colliding.

Common New Detached ADU Problems We See in Paradise Homes

  • Plans filed against imaginary city rules. Some packets get submitted as if a City of Paradise code exists, when the real authority is Clark County ADU criteria plus your HOA overlay, and that earns a correction letter before review even starts. We file against the right jurisdiction from day one.
  • Footprint staked before survey and utility locate. On Paradise parcels with existing block walls and shallow 1960s-era lines, the survey and locate have to come first, because those dictate setbacks and where a slab can go. Skipping that step risks hitting a wall or a line.
  • Desert-spec design skipped. Thin insulation and unshaded west glazing fail energy and livability checks under Mojave heat, and grading that ignores monsoon drainage and caliche creates foundation trouble. We design for the desert, not a mild climate.
  • Materials, colors, or heights outside what gets approved. A detached unit that steps outside what the county and HOA typically approve forces a redesign, which resets the whole review calendar. We choose materials and heights that clear the committee.

Pricing for New Detached ADU in Paradise, NV

A typical custom detached ADU in Paradise runs roughly $180,000 – $280,000 all-in, drawings through final inspection, while a prefab or modular unit lands closer to $130,000 – $200,000 depending on the system and site work. Studio detached units in Paradise generally run $110,000 – $170,000. Those ranges move with your lot’s survey and utility-locate needs, caliche grading and drainage, and the cooling and shading required for the desert. Every project gets a written price before any work starts, per the Haven Standard, and the scope is locked at signing with no door-side upsells. Call (866) 403-8955 to schedule a free estimate on your Paradise lot.

We Also Serve Cities Near Paradise

We work with homeowners across the metro, so if you’re just outside Paradise in Winchester, Whitney, Spring Valley, or Enterprise, the same design-build process applies. See our New Detached ADU in Paradise page for the local approval path, and browse our New Detached ADU service hub to understand the full scope. Call (866) 403-8955 with your address and we’ll confirm coverage.

Serving Paradise, NV – Our Local Coverage Area

We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – New Detached ADU in Paradise

The bathroom inside a new ADU

Why Paradise Chooses Ellery ADU Studio North Las Vegas

We set the standard for new detached ADU in Paradise.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Paradise

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Paradise Customers Say

Trusted by homeowners across Paradise and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

More ADU services in Paradise

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Paradise?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Paradise.

(866) 403-8955

Request a Free Estimate in Paradise

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch