







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Design & Permitting Across Paradise
If you own a home in Paradise and you’re weighing an accessory dwelling unit, the first thing to know is that your plans won’t be approved by a Paradise building department. Paradise is an unincorporated Clark County community, so ADU permits here run through Clark County and Nevada state rules, not a municipal code. We work in that exact framework every week. Our ADU Design & Permitting team handles site assessment, drawings, permit filing, and HOA compliance as one package, at one written price before any work starts. Call (866) 403-8955 to schedule a free estimate.
Why Ellery ADU Studio North Las Vegas Is Paradise’s Preferred ADU Design & Permitting Company

Most of the ADU work we see in Paradise starts with a homeowner who has already been told the wrong thing by someone. A designer files toward a city hall that doesn’t exist. A plan clears county zoning and then dies at the HOA gate. We build the permit set as the core product, not an afterthought, and we scope the county review and the HOA check together so neither one ambushes the other late.
We’ve designed, permitted, and built 900+ ADUs since 2015, and every one carried a written price before work started and a documented photo record when it was done. Technicians and crews are background-checked, and the license number appears on every page – verified, not just claimed. Under Clause 1 of The Haven Standard, you get a written price before any work begins; the words “call for a quote” aren’t how we operate. If you already have a written estimate in hand from another firm, we’ll give you a free second opinion on it.
Response time to Paradise is worth naming plainly. If you live off Eastern Avenue near the Convention Center or out by the Russell Road corridor in 89105, we treat those as standard scheduling, not a far-flung edge of the map.
Our ADU Design & Permitting Services in Paradise
Site Assessment
Before any drawing gets drafted, we walk the lot. On older Paradise parcels that means checking where the block wall actually sits, where utilities enter the property, and whether a septic or well system is still in play. Shallow, unmarked irrigation and gas lines are common here, so we order a survey and utility locate before a slab can be staked. This step is where most stalled Paradise projects get un-stuck.

ADU Design & Blueprints
Paradise sits in the Mojave Desert, which shapes the drawing itself. Heavy insulation, east or west-glazed openings, and efficient cooling aren’t extras here, they’re what makes a detached unit livable and Title 24 compliant. We draw for monsoon-season flash flooding and caliche-heavy soil from the start, so the foundation and grading lines are already there before the county reviewer asks.

Permit Application
Your plan set goes to Clark County, not a Paradise municipal office, and we build the submittal around that. AB 273, the 2021 state law, limits how far local restrictions can reach, and we use it correctly in the filing. We pull permits and see them through to inspection; the drawings, the permit set, and the build are a single contract.

HOA & Zoning Compliance
This is the step that sinks Paradise projects that looked fine on paper. Many lots here sit in planned communities, and an HOA or deed restriction can still shrink or block a detached unit the county would otherwise approve. We run the HOA check alongside the county review so you aren’t surprised after the county stamps the plan.
Trusted Brands We Service in Paradise
We specify and coordinate prefab and modular systems from Plant Prefab and Abodu, and we work the envelope and cladding details around James Hardie products where the design calls for it. Bringing a factory-built or panelized system into a Paradise lot still has to answer to the same county review, the same caliche soil, and the same HOA check, so we scope the brand selection inside the same single contract rather than handing you off. We don’t stock parts; we coordinate the system and the site together, which keeps the turnaround honest.
Common ADU Design & Permitting Problems We See in Paradise Homes
- Filed with a city that doesn’t exist. Designers submit to a phantom Paradise building department, so the plan set is never actually reviewed. Months pass before anyone notices. We file with Clark County from the start.
- Killed by the HOA after county approval. A plan clears county zoning, then a deed restriction in a Paradise planned community stops it cold. AB 273 doesn’t override private covenants, which is why we check both.
- Slabs drawn blind to the soil. Detached-unit grading gets drawn without accounting for caliche, shallow utilities, or monsoon drainage, forcing a costly redesign after the survey and locate come back.
- Footprints set from an assessor’s map. Detached ADUs colliding with block walls, setbacks, or septic and well clearances because the plan was scaled off a map instead of a real survey. On older Paradise lots with irregular backyards, that shift of a few feet is the whole project.
Here’s how a typical job usually runs on an older Paradise lot with a block wall and a tight backyard. The design stalls at site assessment first: shallow utilities and unmarked lines mean a survey and locate get ordered before a slab is staked, and the footprint often shifts a few feet to clear the wall and setbacks. Once the layout is fixed, the plans answer for Mojave conditions, then the package goes to Clark County with an HOA compliance check running alongside it.
Pricing for ADU Design & Permitting in Paradise, NV
Design and permitting for a detached ADU in Paradise typically runs $8,000 – $18,000, drawings through permit issuance. A site assessment with survey and utility locate usually lands at $600 – $1,500, and an HOA compliance review adds $400 – $1,200 depending on the community’s documents. Title 24 energy compliance for a detached unit runs $500 – $1,200. What moves those numbers: lot irregularity, whether an existing septic or well needs clearances resolved, caliche soil requiring engineered grading, and how deep the HOA review goes. Every project is quoted at a written price before work begins, per Haven Standard Clause 1, and the scope is locked at signing under Clause 5 – no door-side upsells. Call (866) 403-8955 for a free estimate, or a free second opinion on a written estimate you already have.
We Also Serve Cities Near Paradise
We work the communities around Paradise too: Winchester, Whitney, Spring Valley, and Enterprise. Each carries its own jurisdiction quirks, and we scope them the same way we scope ADU Design & Permitting in Paradise – county review and HOA check built into one written price.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – ADU Design & Permitting in Paradise

No. Paradise is an unincorporated Clark County community, so your ADU plan set is reviewed and approved by Clark County, not a Paradise city hall. Because the address often carries a Las Vegas mailing name, some designers file in the wrong place entirely. We build the submittal for Clark County from the start, using Nevada’s AB 273 framework correctly. Call (866) 403-8955 for a free estimate.
Yes, it can. AB 273 limits how far local government restrictions can reach, but it does not override private HOA covenants or deed restrictions. In Paradise’s many planned communities, a rule can still shrink or block a detached unit the county would otherwise approve. We run an HOA compliance check alongside the county review so you learn this before you’ve paid for a full plan set.
Because older Paradise lots carry shallow utilities and unmarked irrigation or gas lines that a map won’t show. Without a real survey and locate, a detached footprint set from an assessor’s map can collide with block walls, setbacks, or septic and well clearances. We order both before any slab is staked, and the footprint often shifts a few feet to clear them. Call (866) 403-8955 to schedule a free estimate.
Caliche-heavy soil affects excavation and foundation design, and monsoon-season flash flooding drives the grading and drainage plan. Draw those out properly and the unit stays dry and stable; skip them and you’re redesigning after the survey comes back. Paradise also sits in the Mojave Desert, so heavy insulation and shaded or east/west glazing are part of the same package, not add-ons.
No. A Las Vegas mailing name on a Paradise address doesn’t change jurisdiction; the permit still goes to Clark County because the parcel is in unincorporated county territory. That said, many of the same homes sit inside HOAs and deed restrictions, so the county review and the HOA check have to travel together. We handle both in one written price. Call (866) 403-8955 for a free estimate.
Written by the team at Ellery ADU Studio.










