A Ellery company - serving North Las Vegas, NV
A new modern detached ADU in a backyard
New Detached ADU · Whitney, NV

New Detached ADU in Whitney - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
An efficiency kitchen in a junior ADU
An attached garage converted into living space
The private side entrance of a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Whitney

If you’re weighing a detached ADU on a Whitney lot, the first real question is where it can physically go. Whitney sits in unincorporated Clark County, and in the older tracts off Boulder Highway the septic system usually decides that before the zoning envelope does. We’re a design-build studio, which means the drawings, the permit set, and the construction arrive under one contract at one written price. Our technicians have up to 11 years of experience, and they know the 89122 blocks from Boulder Highway out toward Sam Boyd Stadium. Call (866) 403-8955 and a live person picks up, day or night.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Whitney’s Preferred New Detached ADU Company

The bedroom inside a new ADU

Whitney homeowners research before they call. They’ve read the contractor complaints, they’ve seen a neighbor’s project stall at inspection, and they want the price on the page. That’s the practice we’ve built: under Haven Standard Clause 1, every project carries a written price before any work begins. No “call for a quote,” no number that moves once the slab is poured.

Since 2015 we’ve designed, permitted, and built 900+ ADUs, and every one came with a documented photo record when the work was done. For a Whitney build that matters, because the photos of your septic locate, your slab anchors, and your roof flashing are the same evidence an insurer will ask for years later. Under Clause 5, the scope locks at signing: no door-side upsells, no scope creep after framing starts.

Response to Whitney is straightforward. We’re not dispatching a salesperson to your door the same afternoon, and we won’t pretend otherwise. What we do offer is a live person on the phone at (866) 403-8955 at any hour, and a Free Second Opinion on any written estimate you already have in hand from another builder. If that estimate is missing a wind rating or a septic contingency, we’ll tell you plainly.

Our New Detached ADU Services in Whitney

Custom Built ADU

A custom detached unit in Whitney is where the septic question gets answered first. Before we stake a footprint, we locate the tank and drain field, then decide whether to decommission, reroute, or design the ADU around the leach field. That sequencing is what keeps the county’s site plan review from bouncing back mid-excavation.

Custom Built ADU

1-Bed & 2-Bed ADU

Most Whitney families adding a casita for a parent or adult child land on a one- or two-bedroom layout, usually 600 to 1,000 square feet. On these 1970s – 1990s slab-and-stucco lots, the generous backyards give you room, but the setback variance from the property line still has to be drawn and defended in the permit set. We handle that in the drawings, not after the fact.

1-Bed & 2-Bed ADU

Studio ADU

A studio is often the cleanest fit when the leach field eats half the usable yard. We size the shell to the space that’s actually buildable, then spec the insulation and HVAC for a detached volume that has to hold temperature through 105°F-plus summers without leaning on the main house.

Studio ADU

Prefab ADU Installation

Prefab and modular systems make sense on some Whitney lots and not others, and the difference is site work and anchoring, not the box. We specify and coordinate systems from Plant Prefab and Boxabl within the same single contract, and we handle the slab, tie-ins, and county inspections that a factory-delivered unit still requires. Explore our New Detached ADU team for the full scope.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Whitney

We specify and coordinate prefab and modular systems from Plant Prefab, Boxabl, Tuff Shed, and James Hardie, matching the system to your lot rather than the other way around. A Boxabl unit and a James Hardie-clad custom shell solve different problems on a Whitney property, and the septic locate usually decides which one you’re actually building. We don’t keep parts in stock and we don’t claim to; what we control is the specification, the anchoring, the flashing detail, and the inspection sequence, all written into the contract before work starts.

Common New Detached ADU Problems We See in Whitney Homes

  • Septic found mid-excavation. The footprint gets staked, the excavator opens the ground, and a tank or drain field nobody mapped turns up. That forces a redesign and a fresh county site-plan review, which is why the locate has to happen before the stake, not after.
  • Flashing built for mild weather. Roof and wall penetrations sealed for a gentle climate let monsoon-driven rain into the shell and stucco assembly. In Whitney, wind-driven rain finds every under-detailed seam, and the fix afterward costs more than doing it right in the permit set.
  • HVAC sized for a condo, not a desert detached unit. A thin insulation package and an undersized unit leave the ADU unlivable in July and August. Comfort at final walkthrough fails, and so does the owner’s reason for building it.
  • Drainage that moves water toward the house. Grading that doesn’t push sheet flow away from both the ADU and the main house turns a monsoon afternoon into a wet slab edge. Site drainage belongs in the drawings, not in a follow-up call.

On a typical Whitney lot, the placement runs into a septic tank and drain field that predate the current backyard layout. The build starts with a septic locate and a decision to decommission, reroute, or design around the leach field before excavation. From there the shell has to meet desert wind and monsoon drainage requirements: anchored to the slab, flashed and sealed at roof and wall penetrations, graded so sheet flow leaves both buildings. A qualified local pro sequences septic work, county permitting, and framing inspection so the slab and tie-ins pass the first time rather than after a re-inspection.

Pricing for New Detached ADU in Whitney, NV

Whitney pricing tracks the county process and the septic work, not just square footage. A studio detached ADU typically runs $180,000 to $260,000 all-in, drawings through final inspection. A one- or two-bedroom custom detached unit usually lands between $260,000 and $420,000 depending on size, finish level, and how much septic rerouting the lot demands. Prefab and modular installation commonly falls in the $150,000 to $280,000 range once site work, slab, anchoring, and county inspections are included. A septic locate and any reroute typically adds $6,000 to $18,000, and a setback variance can add engineering time. Every one of those numbers arrives as a written price before any work begins, per Haven Standard Clause 1. Call (866) 403-8955 for a Free Second Opinion on a quote you already hold.

We Also Serve Cities Near Whitney

Whitney work sits inside unincorporated Clark County, and the permitting path here differs from neighboring cities. We also work in Sunrise Manor, Winchester, Paradise, and Las Vegas, each with its own jurisdiction and inspection sequence. If you’re comparing options across the east valley, start with our New Detached ADU in Whitney overview and we’ll walk you through how county rules differ from city rules before you commit to a lot plan.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – New Detached ADU in Whitney

A new modern ADU with wood cladding

Why Whitney Chooses Ellery ADU Studio North Las Vegas

We set the standard for new detached ADU in Whitney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Whitney

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

Trusted by homeowners across Whitney and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

More ADU services in Whitney

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Whitney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Whitney.

(866) 403-8955

Request a Free Estimate in Whitney

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch