







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable New Detached ADU Across Paradise
If you’re planning a new detached ADU in Paradise, the first thing to understand is that there’s no Paradise city hall to approve it. Your project runs on Clark County ADU criteria, the state’s AB 273 rules, and whatever your HOA’s deed restrictions say. We know that layered path well, and we write the permit set for it before anything gets staked. Call (866) 403-8955 and we’ll talk through your lot in 89105, your setbacks, and what a detached unit can realistically be on your parcel.
Why Ellery ADU Studio North Las Vegas Is Paradise’s Preferred New Detached ADU Company

Paradise isn’t a city, so the ADU work here gets decided by county jurisdiction, HOA overlays, and the age of the housing stock, and that’s exactly where we focus. Our technicians have up to 11 years of experience, and every project comes with a written price before work starts and a documented photo record on every visit.
Homeowners across Paradise, from the mid-century tracts near the Convention Center corridor to the resort-adjacent lots off Flamingo, come to us because the permit set is the product, not an afterthought. If you already have a written estimate in hand from someone else, we’ll give you a free second opinion on it. Under our 365-Day Done Right Promise, if the finished ADU isn’t built to the permitted drawings, we make it right in writing, before the project even begins.
Our New Detached ADU Services in Paradise
We bring custom and prefab detached units under one contract at one written price, which matters here because Paradise projects often involve both a site-built foundation and a manufactured panel system. Here’s how each service looks in Paradise specifically.
Custom Built ADU in Paradise
A custom detached unit in Paradise starts with the county’s ADU criteria plus your HOA overlay, then works backward to a footprint your lot can actually hold. Many mid-century tract parcels here are hemmed by existing block wall and squeezed by setbacks, so the design has to clear plan-check comments on height, glazing, and cooling before a slab is ever graded. Custom framing lets us shape the unit to those constraints rather than forcing a stock plan onto the lot.

Prefab ADU Installation in Paradise
Prefab installation in Paradise means sequencing the panel delivery to land after county approval, not before, so the site isn’t sitting half-finished waiting on a committee. We coordinate systems from brands like Plant Prefab and Mighty Buildings within the same contract, which keeps the foundation crew and the panel crew on one schedule. On caliche-heavy soil, the foundation and drainage work in Paradise gets settled first, then the panels drop in.

Modular ADU in Paradise
Modular units work well on Paradise lots where the backyard looks bigger on paper than it is, because a factory-built module arrives finished and reduces on-site time. We handle the survey and utility locate before anything is staked, since shallow 1960s-era lines and block walls dictate where a module can sit. The county still reviews the plan set, and we file it and carry it through.

Studio ADU in Paradise
A studio detached ADU is often the right fit for Paradise’s smaller, irregular backyards, where a 1-bed or 2-bed footprint simply won’t clear setbacks. Studio units still need desert-spec insulation, shaded or east/west-oriented glazing, and efficient cooling to pass energy and livability checks under Mojave heat. We size the studio to the lot and the HOA’s height limits, then build the schedule around county review.
Trusted Brands We Service in Paradise
We specify and coordinate prefab and modular systems from Plant Prefab, Mighty Buildings, Boxabl, and Tuff Shed, among others, and we handle each within the same single contract that covers drawings, permits, and construction. We don’t claim to stock parts or units locally; what we do is match the right system to your Paradise lot, your HOA overlay, and the county’s approval criteria. If a panel or module system fits your site, the design-build process stays coordinated, and your review calendar and delivery schedule are planned together rather than colliding.
Common New Detached ADU Problems We See in Paradise Homes
- Plans filed against imaginary city rules. Some packets get submitted as if a City of Paradise code exists, when the real authority is Clark County ADU criteria plus your HOA overlay, and that earns a correction letter before review even starts. We file against the right jurisdiction from day one.
- Footprint staked before survey and utility locate. On Paradise parcels with existing block walls and shallow 1960s-era lines, the survey and locate have to come first, because those dictate setbacks and where a slab can go. Skipping that step risks hitting a wall or a line.
- Desert-spec design skipped. Thin insulation and unshaded west glazing fail energy and livability checks under Mojave heat, and grading that ignores monsoon drainage and caliche creates foundation trouble. We design for the desert, not a mild climate.
- Materials, colors, or heights outside what gets approved. A detached unit that steps outside what the county and HOA typically approve forces a redesign, which resets the whole review calendar. We choose materials and heights that clear the committee.
Pricing for New Detached ADU in Paradise, NV
A typical custom detached ADU in Paradise runs roughly $180,000 – $280,000 all-in, drawings through final inspection, while a prefab or modular unit lands closer to $130,000 – $200,000 depending on the system and site work. Studio detached units in Paradise generally run $110,000 – $170,000. Those ranges move with your lot’s survey and utility-locate needs, caliche grading and drainage, and the cooling and shading required for the desert. Every project gets a written price before any work starts, per the Haven Standard, and the scope is locked at signing with no door-side upsells. Call (866) 403-8955 to schedule a free estimate on your Paradise lot.
We Also Serve Cities Near Paradise
We work with homeowners across the metro, so if you’re just outside Paradise in Winchester, Whitney, Spring Valley, or Enterprise, the same design-build process applies. See our New Detached ADU in Paradise page for the local approval path, and browse our New Detached ADU service hub to understand the full scope. Call (866) 403-8955 with your address and we’ll confirm coverage.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – New Detached ADU in Paradise

Clark County reviews and approves it, because Paradise is an unincorporated Clark County community with no city hall of its own, and AB 273 limits how far local rules can restrict your unit. Your HOA overlay sits on top of the county criteria, so the plan set has to clear both. We file the packet and carry it through review for you. Call (866) 403-8955 to start with a free estimate.
The packet that clears review is one filed against real Clark County ADU criteria and your HOA overlay, with setbacks, height, glazing, and desert-spec cooling all addressed. Missing any of those earns a correction letter. We build the submittal around the county’s actual criteria, not imaginary local rules. Call (866) 403-8955 for a free second opinion on any packet you already have.
County plan review typically adds several weeks to the calendar, and correction letters push it further, so we schedule the whole project around that clock. Long-lead prefab panels and custom framing are sequenced to arrive after approval, so your site isn’t sitting half-finished waiting on a committee. Call (866) 403-8955 and we’ll map the review timeline for your lot.
An HOA can still enforce deed restrictions that affect your unit, even with AB 273 limiting local government restrictions, and many Paradise planned communities carry real overlays. That’s why we pull the HOA’s rules alongside the county criteria before design starts. Call (866) 403-8955 so we can review your community’s restrictions.
Designs that pass in Paradise use heavy insulation, shaded or east/west-oriented glazing, and efficient cooling built for Mojave heat, with grading and drainage that handle monsoon runoff and caliche soil. Materials, colors, and heights that fit the county and HOA expectations clear fastest. We design to those standards from the start. Call (866) 403-8955 to schedule your free estimate.
Ready to plan a detached ADU on your Paradise lot? Call (866) 403-8955 for a free estimate. You’ll get a written price before any work starts, a documented photo record on every visit, and our 365-Day Done Right Promise in writing. We answer calls 24/7 with a live person.
Written by the team at Ellery ADU Studio.




