A Ellery company - serving North Las Vegas, NV
A backyard ADU foundation formed and ready to pour
ADU Site Prep & Utilities · North Las Vegas, NV

ADU Site Prep & Utilities in North Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
A new two-story ADU over a garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Trusted ADU Site Prep & Utilities for North Las Vegas Homeowners

Most ADU projects don’t stall at the design stage. They stall in the dirt. A North Las Vegas lot that looks flat from the sidewalk can hide caliche, an undersized electrical service, and a sewer lateral that runs the wrong direction under the driveway. Ellery ADU Studio handles site prep and utilities as part of one design-build contract, which means the crew that grades your lot is the same team that drew the foundation plan. Our technicians bring up to 11 years of experience, and we’ve designed, permitted, and built 900+ ADUs since 2015, each with a written price before work started. Call (866) 403-8955 and a live person answers, day or night.

Call (866) 403-8955

What Our ADU Site Prep & Utilities Service Includes

A fresh concrete slab for a backyard ADU

Site prep in the Las Vegas Valley is a different job than it is in most of the country. The soil is alkaline, the summer ground temperature is unforgiving, and the utility trench depth the city wants isn’t negotiable. Here’s what each piece of the work actually involves in North Las Vegas.

Foundation & Grading

Grading establishes the finished floor elevation and moves water away from both the ADU and the existing house before a single form goes down. You need it on every new detached ADU and on most garage conversions where the slab has settled unevenly. We run the lot survey, check soil conditions for caliche and expansive clay, then build the foundation to the engineered plan with the inspector on site at the rebar stage, not after.

Electrical Panel Upgrade

An ADU typically needs 60 to 100 amps of its own and a subpanel fed from the main service, and many North Las Vegas homes built before 1990 have a 100-amp main that won’t carry the added load. You need an upgrade when the load calculation doesn’t clear, or when the existing panel is a brand with a known failure record. We run the load calculation first, pull the electrical permit, and coordinate the utility disconnect with the power company so your family isn’t dark for an extra day.

Plumbing Lateral

The lateral is the buried pipe that carries waste from the ADU to the city sewer main, and its path and slope decide whether the project needs a new tap or can tie into the existing line. You need a new lateral when the existing one is undersized, has root intrusion, or the ADU sits too far from the connection to meet fall requirements. We camera the existing line, map the run, and pull the right-of-way permit for any work in the street.

Gas Line Extension

A gas extension feeds a tankless water heater, a cooktop, or a dryer in the ADU, and it has to be sized and pressure-tested to code before it’s buried. You need one whenever the ADU uses gas appliances rather than all-electric, which is still common in North Las Vegas. We size the line for the connected load, pressure-test it, and get the inspection signed off before the trench is backfilled, per Haven Standard Clause 1, the written price you sign before work begins.

Landscaping & Hardscape

This is the finish work that makes the ADU liveable: pavers for the entry path, drainage away from the foundation, and plant selection that survives a North Las Vegas July. You need it on any ADU that will be rented or used as a separate address. We install a drainage plan that ties into the lot grading, specify low-water plants, and match hardscape to the existing house so the ADU reads as part of the property, not bolted onto it.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Brands We Service for ADU Site Prep & Utilities

Prefab and modular ADUs each come with their own foundation and utility requirements, and we’ve coordinated enough of them to know where the site work differs. Mighty Buildings panels want a level pad with tight tolerances and a foundation plumbed and wired to their spec sheet before the panels arrive; a half-inch of grade error shows up at the roofline. Boxabl units are lighter and set faster but still need a properly compacted pad and stubbed utilities dropped in the right spot, because moving a stub after the unit is set is expensive.

Plant Prefab ships a panelized kit with an engineered foundation plan that has to be built to the fraction of an inch, and we’ve handled the grading and lateral work that plan assumes. We know where the site coordination tends to slip on each system, and we build the utility layout to the manufacturer’s drawings rather than adapting it on the fly. Whether you’re building with one of these systems or framing conventionally, we can help with the site prep and utilities that have to be right before the unit lands.

Signs You Need ADU Site Prep & Utilities Right Now

  • Your lot pools water after a storm. Water that sits against the existing foundation for hours is a grading problem, and it will sit against the new ADU foundation too. It needs to be corrected before you build, not after.
  • Your panel is older than the house’s last addition. A 60-amp or early 100-amp panel with no open breaker spaces won’t carry an ADU. Get a load calculation before you commit to an all-electric design.
  • Slow drains in the back of the house. A sluggish drain can point to a root intrusion or a lateral running the wrong slope, and an ADU tied into a failing line will make it worse. Camera the line early.
  • You’re planning a gas water heater or range in the ADU. The existing line may not be sized for the added load. A gas extension has to be designed before the trench is dug, not after.
  • Your property line is closer than you assumed. Setback variance, the extra distance the city requires between your new ADU and the property line, gets settled at the site survey. It affects grading, the foundation footprint, and the utility route.

Our ADU Site Prep & Utilities Process – Step by Step

  1. 1
    Site survey and utility locate. We pull the parcel data, walk the lot, and mark existing utilities so nothing gets hit. This is where we find the surprises like caliche or a buried line nobody documented.
  2. 2
    Soil and load evaluation. We check the soil for expansive clay and caliche, run the electrical load calculation, and camera the sewer lateral. What we find goes into the written scope with a photo record of the site as it was.
  3. 3
    Written scope and price. Every line item is priced before work starts: grading, foundation, panel, lateral, gas line, hardscape. No door-side add-ons later, per Haven Standard Clause 1, and the scope is locked at signing.
  4. 4
    Permits and inspection coordination. We pull the building, electrical, plumbing, and right-of-way permits and schedule the inspections at each stage. Nothing gets buried or covered before it’s signed off.
  5. 5
    Construction, backfill, and photo record. We build to the permitted drawings, backfill only after inspection, and hand you a documented photo record of every stage. If it’s not built to the permitted drawings, the 365-Day Done Right Promise covers making it right.

How Much Does ADU Site Prep & Utilities Cost in North Las Vegas?

A utility trench with new sewer pipe and conduit

Site prep and utilities for a detached ADU in North Las Vegas typically run $28,000 to $65,000 depending on lot conditions and how far the utilities have to travel. A full electrical panel upgrade runs $2,500 to $5,500, a new plumbing lateral in the $3,000 to $8,000 range, and a gas line extension $1,200 to $3,500. Foundation and grading for a detached ADU is the largest line, typically $15,000 to $35,000 depending on square footage and soil. Landscaping and hardscape adds $4,000 to $12,000.

What moves the price most is what you can’t see from the street: expansive soil, caliche that has to be broken out, a lateral that has to run farther than expected, or a right-of-way permit. To avoid overpaying, get a site survey and soil evaluation before anyone quotes you a foundation number. Our free estimate includes a written line-item scope, a written price, and a documented photo record of what we found. If you’re holding another contractor’s estimate, we’ll give you a free second opinion on it.

ADU Site Prep & Utilities Near North Las Vegas – Our Service Area

We handle ADU site prep and utilities in North Las Vegas and across the valley, including Sunrise Manor, Whitney, Winchester, Paradise, Spring Valley, Summerlin, Henderson, Enterprise, Boulder City, and Moapa Town. Most site visits in the North Las Vegas and Sunrise Manor area are scheduled within a few days, and outlying areas like Moapa Town may need a bit more notice. Wherever you are in the valley, call and we’ll get you on the schedule.

Serving North Las Vegas, NV – Our Local Coverage Area

We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – ADU Site Prep & Utilities in North Las Vegas

The bedroom inside a new ADU

Schedule Your ADU Site Prep & Utilities Service in North Las Vegas Today

If you’re weighing an ADU, the smartest first step is finding out what your lot will actually require. Call (866) 403-8955 for a free estimate with a written line-item price, a photo record of what we find, and a clear plan for the utilities. A live person answers any time, and there’s no obligation.

Written by the team at Ellery ADU Studio.

Why North Las Vegas Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU site prep & utilities in North Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Las Vegas

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Las Vegas Customers Say

Trusted by homeowners across North Las Vegas and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A new bathroom inside a converted garageAn attached garage converted into living spaceThe private side entrance of a junior ADUA compact kitchen inside a new ADUA kitchenette inside a converted garageA new modern ADU with wood cladding

Explore more ADU services

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in North Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Las Vegas.

(866) 403-8955

Request a Free Estimate in North Las Vegas

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch