A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
Henderson, NV

ADU Services in Henderson - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
The private side entrance of a junior ADU
A kitchenette inside a converted garage
A new bathroom inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in Henderson, NV

Henderson homeowners thinking about an accessory dwelling unit are usually weighing three things at once: what the city will allow on their lot, what the HOA will allow on top of that, and what the whole thing will actually cost. We handle all three under one contract, at one written price, with the permit set built out before anyone swings a hammer. Our technicians bring up to 11 years of experience, and a live person answers our line around the clock at (866) 403-8955. This page is the hub for every ADU service we offer in Henderson, from first sketch to final inspection.

Call (866) 403-8955

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Why Henderson Homeowners Choose Ellery ADU Studio North Las Vegas

A new modern ADU with wood cladding

Ellery ADU Studio has worked as a design-build practice since 2015, and that single-contract structure is the reason people in Henderson call us. When the designer and the builder are the same party, there’s no finger-pointing when a setback dimension gets challenged at plan check or a window lands in the wrong place. You get a written price before work starts, per Haven Standard Clause 1, and a documented photo record on every visit so you can see what was found and what was done.

Henderson projects have their own rhythm. In Green Valley and Anthem, we’re typically coordinating HOA architectural review alongside the city submittal, because CC&Rs often run stricter than code on height and side-yard clearance. In MacDonald Ranch and Seven Hills, shallow lots make detached placement the first real design problem to solve. Our technicians are background-checked and their license number appears on every page – verified, not just claimed. If you already have a written estimate in hand from another firm, take our Free Second Opinion before you sign anything. Calls are answered by a person, not a voicemail queue.

ADU Services We Offer in Henderson

ADU Design & Permitting

The permit set is our core product, not a formality tacked onto construction. We draw, engineer, and submit to the City of Henderson, then answer plan-check comments ourselves so nothing stalls in a reviewer’s queue. Learn more about our ADU Design & Permitting in Henderson.

ADU Design & Permitting

Garage Conversion ADU

Converting an existing garage is often the fastest route to a rentable unit, provided the slab, ceiling height, and egress all check out. We measure what’s there, tell you plainly whether it works, and lock the scope at signing. Learn more about our Garage Conversion ADU in Henderson.

Garage Conversion ADU

New Detached ADU

Detached units are where Henderson’s setback puzzles get real – we solve footprint, HOA review, and utility routing together rather than sequentially. Some builds suit panelized systems, and we specify and coordinate brands like Mighty Buildings, Plant Prefab, or Tuff Shed within the same contract. Learn more about our New Detached ADU in Henderson.

New Detached ADU

Junior ADU & Interior Conversion

A JADU fits inside the existing footprint of your home, which sidesteps many lot-coverage questions that stop detached projects cold. We handle the interior reconfiguration, the kitchenette, and the separate entrance in one scope.

ADU Site Prep & Utilities

Grading, drainage, electrical service upgrades, and the trenching to connect water and sewer – all documented before the first day of construction. Site work is quoted as a line item, not discovered later.

Neighborhoods We Serve in Henderson

We work across Henderson’s master-planned communities and older pockets alike. Most estimates in these areas are scheduled within a few business days.

  • Green Valley (89052)
  • Anthem and Anthem Highlands
  • MacDonald Ranch
  • Seven Hills
  • Downtown Henderson near Water Street (89015)

Why Henderson’s Climate & Housing Affect ADU

Henderson’s desert conditions change how an ADU has to be designed, and it’s the first thing we address in any drawing set. Summers regularly push past 100°F, so a detached unit needs heavier insulation, deeply shaded outdoor space, and a cooling strategy that doesn’t drive the electric bill sideways. Where evaporative cooling makes sense for our dry air, we evaluate it – something that wouldn’t be relevant in a wetter or milder market. Landscaping plans lean toward drought-tolerant species, which also helps with HOA water restrictions. Then there’s the housing stock itself: most Henderson subdivisions were built between 1990 and 2010 with stucco-and-tile construction and modest backyards, and the lots are frequently shallower than the homes’ square footage suggests. That means an ADU in Henderson often starts as a setback and shading exercise before it becomes a floor plan. We treat those constraints as design inputs from day one, not surprises at plan check.

Pricing for ADU in Henderson

The bedroom inside a new ADU

Every project is quoted with a written price before any work begins, and every quote below is paired with that guarantee, per Haven Clause 1. Typical ranges in the Henderson market:

  • Garage conversion ADU: roughly $95,000 to $175,000 all-in, drawings through final inspection.
  • Junior ADU / interior conversion: roughly $65,000 to $120,000.
  • New detached ADU: roughly $180,000 to $320,000 depending on size, prefab versus site-built, and utility runs.
  • Design & permitting alone: project-specific, quoted as a line item.

Ranges shift with footprint, site slope, and whether an electrical service upgrade is required. Under Haven Clause 5 (No Surprises), your scope is locked at signing – no door-side upsells, no scope creep. Call (866) 403-8955 for a written estimate.

Service Area – Cities Near Henderson

We also take on ADU work in nearby home communities including Boulder City, Whitney, Paradise, and Enterprise. Each city runs its own permitting process and its own set of design review requirements, and we handle that paperwork the same way we handle Henderson’s.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in Henderson

A bedroom and desk inside a converted garage

Schedule Your Free ADU Estimate in Henderson

Whether you’re in Anthem weighing a detached unit or in an older Water Street property considering a garage conversion, the first step is the same: a written price and a documented scope before anything begins. Call (866) 403-8955 to schedule your free estimate in Henderson. If you already have an estimate from another firm, bring it – our Free Second Opinion costs nothing and tells you exactly where the numbers land.

Written by the team at Ellery ADU Studio.

Ready to get started? Free estimates in Henderson
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Henderson

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Henderson

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Henderson. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch