







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Site Prep & Utilities Across Henderson
If you’re planning a detached unit in one of Henderson’s master-planned subdivisions, site prep is where the project is won or lost. Trenching, slab work, panel sizing, gas and water routing: this phase decides your final price and whether your build stays inside the HOA rules and the builder warranty. We work in Henderson constantly, from Green Valley to Anthem, so we know what the ground does here and how the architectural review boards think. Call (866) 403-8955 to set up your free estimate. Our technicians have up to 11 years of experience, and every project gets a written price before any work starts.
Why Ellery ADU Studio North Las Vegas Is Henderson’s Preferred ADU Site Prep & Utilities Company

Most ADU site prep goes wrong for one of two reasons: someone cuts before they scan, or someone builds before anyone reads the CC&Rs. We handle both the drawings and the construction under a single contract, so there’s no gap where a designer blames a builder and nobody owns the mistake. In Henderson that matters more than anywhere else in the valley, because so many lots sit inside HOAs with their own architectural committees on top of the city’s setback rules.
We’ve designed, permitted, and built 900+ ADUs since 2015, and we bring that file cabinet of precedent to each Henderson address. Our technicians are background-checked and carry their license number, and the studio specifies and coordinates prefab and modular systems from Abodu, Plant Prefab, and others when a homeowner wants a shorter build window. The Haven Standard governs all of it: written price up front, a documented photo record of every visit, and a 365-Day Done Right Promise. If we already have a written estimate from another outfit, our Free Second Opinion will tell you what it misses.
Our ADU Site Prep & Utilities Services in Henderson
Foundation & Grading
Henderson lots in the 89012 and 89074 ZIP codes are usually flat and graded toward drains that were never designed for a second dwelling. We re-grade to move water around the new footprint, then set formwork and reinforcement to the permitted drawings. A typical foundation and grading package in Henderson runs $9,000 – $18,000, depending on whether the pad needs fill or a stem-wall.
Electrical Panel Upgrade
Plenty of 1990s and 2000s Henderson homes still carry a 100-amp panel, and adding an ADU with a heat pump and an EV charger will swamp it. We calculate the real load against Henderson’s 100°F+ summers, then specify a 200-amp service where the numbers call for it. A panel upgrade in Henderson typically lands at $2,800 – $5,500 including the permit and utility coordination.
Plumbing Lateral
This is where post-tension slabs change the conversation. We scan before we trench, and we route laterals through the side yard rather than under the slab wherever the site allows, which keeps you out of engineered-approval territory. A new sewer lateral in Henderson generally runs $3,500 – $7,500, and a water line $1,800 – $3,800.
Gas Line Extension
Gas runs for a tankless water heater, a range, or an outdoor kitchen need a pressure test and a permit pulled with the city. We size the line to the appliance load, not to what’s left over after the main house. Typical Henderson gas extension pricing sits at $1,200 – $3,000. For the full scope behind these line items, see our ADU Site Prep & Utilities service page.
Trusted Brands We Service in Henderson
When a Henderson homeowner wants a modular or prefab approach, we specify and coordinate the system within the same single contract. We’re fluent in how Abodu, Plant Prefab, and Tuff Shed systems handle foundations and utility tie-ins, and how James Hardie cladding performs under Henderson’s sun. We don’t stock parts or carry inventory; what we do is get the right system specified and the site prepared to receive it on a schedule that holds. For a project in Anthem or Seven Hills, that coordination is the difference between a clean install and a yard full of idle boxes.
Common ADU Site Prep & Utilities Problems We See in Henderson Homes
- Cutting a post-tension slab without an engineer’s letter. Many Henderson subdivisions built between 1990 and 2010 use post-tension foundations, and slicing one for a lateral voids the structural warranty and risks a cable. A slab scan and a routing plan come first, always.
- Skipping HOA architectural review. Detached units that cross a view corridor or exceed the development’s height limit get stop-work orders. In Henderson’s HOA-governed subdivisions, the architectural review runs before city permitting, not after.
- Undersizing the panel for the cooling load. A panel sized for the main house alone trips when the AC, the ADU’s unit, and an EV charger all pull at once on a July afternoon. We build Henderson’s summer into the load calculation.
- Ignoring how the desert sun hits the new unit. A west-facing ADU wall with builder-grade insulation bakes in August. We plan shade and low-water cooling strategies during site prep so the utility work supports them.
The local pattern that catches most Henderson owners: a property in a subdivision built around 2000 has a backyard squeezed by shallow side setbacks, leaving a narrow buildable pocket. The existing 100-amp panel is already maxed. The work starts with an HOA/CC&R review, then a slab scan to dodge the post-tension cables, a service upgrade to 200 amps, and new plumbing and gas routed through the side yard instead of under the slab, all while keeping the builder warranty on the main house intact. That sequence is the whole job.
Pricing for ADU Site Prep & Utilities in Henderson, NV

Everyone in Henderson deserves a number, not a “call us.” Here are the ranges we see on residential ADU site work in this market:
- Foundation & grading: $9,000 – $18,000
- Electrical panel upgrade: $2,800 – $5,500
- Plumbing lateral: $3,500 – $7,500
- Water line: $1,800 – $3,800
- Gas line extension: $1,200 – $3,000
- Drought-tolerant landscaping & hardscape: $4,000 – $12,000
Post-tension work requiring an engineer’s letter, long runs through side yards, and HOA review documentation push the total toward the top of these ranges. Every Henderson project is quoted with a written price before any work begins (Haven Standard, Clause 1), with the scope locked at signing. No door-side upsells.
We Also Serve Cities Near Henderson
Homeowners in Boulder City, Whitney, Paradise, and Enterprise call us for the same site prep and utility work, and the rules shift as you cross each boundary. We handle the permitting differences between these communities and Henderson, so you’re not translating one city’s code into another. Wherever you sit on the southeast side, our ADU Site Prep & Utilities in Henderson coverage explains what we do close to home.
Serving Henderson, NV – Our Local Coverage Area
We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – ADU Site Prep & Utilities in Henderson

Yes. In most Henderson master-planned subdivisions, HOA architectural review comes before you finalize where the unit sits and before city permitting. The review board checks setbacks, view corridors, height, and materials, and a stop-work order mid-build is far more expensive than getting sign-off on the drawings first. Call (866) 403-8955 and we’ll tell you what your community’s CC&Rs typically require – the estimate is free.
A slab scan and a look at your original construction documents will tell you. Many Henderson homes built between 1990 and 2010 use post-tension foundations, and you can’t cut one for a lateral without an engineer’s approval. We scan before we trench and route plumbing through the side yard wherever the site allows, so the question gets answered before any cutting starts. Call (866) 403-8955 for a free estimate on the scan and routing plan.
Most often a jump from 100 amps to 200 amps. A detached ADU with its own heat pump, plus an EV charger, overloads a 100-amp service fast, and Henderson’s 100°F+ summers make the cooling load the deciding factor. We size the panel against that load, not against a mild-weather assumption. Call (866) 403-8955 and we’ll quote the upgrade with the permit and utility coordination included – free estimate, written price.
Usually yes, if the work is documented and doesn’t touch warranted assemblies without approval. A post-tension slab cut without an engineer’s letter is the fastest way to void a structural warranty, and unpermitted utility work gives a builder an easy out. We pull the permits, keep the documentation, and work around the warranted structure. Call (866) 403-8955 for a free estimate that spells out how the warranty stays intact.
Drought-tolerant planting, deep shade, and evaporative-friendly outdoor areas are the short answer. Henderson’s water scarcity and brutal sun make climate-responsive design non-negotiable here in a way it isn’t in wetter markets, so we plan shade structures and low-water species as part of site prep rather than as an afterthought. Expect $4,000 – $12,000 for landscaping and hardscape on a typical ADU lot. Call (866) 403-8955 for a written estimate.
If you’re weighing a detached unit on a Henderson lot, the site work is where the numbers get real. We’ll scan the slab, review the CC&Rs, size the panel against our summers, and put a written price in front of you before the first shovel moves. Call (866) 403-8955 for a free estimate on ADU site prep and utilities in Henderson.
Written by the team at Ellery ADU Studio.










