A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
Boulder City, NV

ADU Services in Boulder City - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
A bedroom and desk inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in Boulder City, NV

If you’ve started looking into an accessory dwelling unit in Boulder City, you’ve probably already hit the wall that stops most people here: this town doesn’t hand out ADU permits the way Henderson or Las Vegas now has to. Boulder City was planned as a federal no-growth workers’ town for Hoover Dam, and its historic charter has kept accessory units tightly regulated ever since. That makes the first real question less about design and more about which approval path you qualify for.

Call (866) 403-8955

We’re Ellery ADU Studio, a design-build studio. Since 2015 we’ve designed, permitted, and built ADUs as a single contract at a single written price, with 900+ projects completed and a permit set as the core product. A live person answers our line 24/7 at (866) 403-8955. Every Boulder City project starts with a written price before any work begins, drawings through final inspection, and the honest answer about whether your lot is a straightforward garage conversion or a hearing-bound variance.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

The Real Problem in Boulder City: Permitting Comes First

The bathroom inside a new ADU

Most ADU content assumes the hard part is picking a floor plan. In Boulder City, the hard part is the entitlement. Nevada law has pushed cities across the valley to allow accessory units, but Boulder City’s status as a federally chartered historic town with a strong no-growth ethos means the rules here still lean restrictive. In practice, that can mean occupancy limits tied to family members, a conditional-use or variance path, and – if your property sits inside the Historic District – design-review requirements on top of everything else. A neighbor in Henderson can pull a rental casita permit over the counter; here the same project can land on a public hearing agenda.

We treat that as a design problem, not a paperwork annoyance. The permit set is the product. Under Clause 1 of The Haven Standard, you get a written price before any work starts, and that price accounts for the approval path your specific parcel needs – not a valley-average number that quietly grows once the city asks for a variance. Under Clause 5 (No Surprises), the scope is locked at signing.

Key Takeaways

  • Boulder City’s ADU rules are among the most restrictive in the Las Vegas Valley; plan for a variance or conditional-use path, not an over-the-counter permit.
  • Historic District properties near Nevada Way add design-review requirements.
  • Garage conversion ADUs typically run $95,000 – $160,000 all-in; detached units run $180,000 – $320,000, drawings through final inspection.
  • Wind and heat off the Eldorado Valley change how an ADU must be built here.

Why Boulder City Homeowners Choose Ellery ADU Studio North Las Vegas

Design-build means one contract covering the drawings, the permit set, and the construction. Neither the designer nor the builder can point at the other when something is wrong, because there is no other. That single-contract structure is why homeowners in the Historic District, the Alphabet Streets, and the older blocks off Nevada Way call us before they call a valley contractor who has never read Boulder City’s charter.

Our technicians have up to 11 years of experience. They’re background-checked, and the license number appears on every page – verified, not just claimed. We’re licensed and insured, and every visit produces a documented photo record: what we found, what we did, in images rather than a summary. Under the 365-Day Done Right Promise, if the finished ADU isn’t built to the permitted drawings, we make it right, in writing, before the project starts. And if you already have a written estimate in hand from another builder, we’ll give you a free second opinion on it – no obligation.

We also work with a written price as standard, not as an upsell. You’ll see dollar ranges on this page. The numbers you get back are locked to your scope. There’s no door-side upsell and no scope creep once work begins.

ADU Services We Offer in Boulder City

ADU Design & Permitting

The permit set is the product, and in Boulder City it’s also the hardest part. We build the drawings around the approval path your parcel actually needs – standard, conditional-use, or variance – so you’re not paying for a design the city can’t approve.

Learn more about our ADU Design & Permitting in Boulder City.

ADU Design & Permitting

Garage Conversion ADU

Many Boulder City ranch homes on the outskirts have undersized or absent garages, so a conversion often means new slab, new framing, and a careful look at the utility run. We size the price to what’s actually there, not a valley-average assumption.

Learn more about our Garage Conversion ADU in Boulder City.

Garage Conversion ADU

New Detached ADU

A new detached unit is the cleanest path when your lot has the room and the septic or utility setup can carry it. Wind-rated construction and heavy insulation matter more here than in the valley floor – we build for the conditions, not the brochure.

Learn more about our New Detached ADU in Boulder City.

New Detached ADU

Junior ADU & Interior Conversion

For properties where an addition or interior conversion makes more sense than a separate structure, we handle the drawings and build as one scope. This is often the practical route on smaller historic-district parcels.

ADU Site Prep & Utilities

Aging septic and utility setups are common on Boulder City’s older blocks, and they can constrain what a detached ADU can legally connect to. Site prep is priced as its own line item so you can see exactly what the ground requires before you commit.

Every one of these services runs under one contract at one written price, coordinated for prefab and modular systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie. To see the full range we build, visit our home page.

Neighborhoods We Serve in Boulder City

We work across both Boulder City ZIP codes, 89006 and 89005, with the same response whether you’re in the original historic district or out toward the edges. The most common requests come from:

  • The Historic District around Nevada Way
  • The Alphabet Streets
  • Older masonry cottages near the old downtown
  • 1960s – 80s ranch homes on the outskirts

Response time is typically within a day for an initial site visit, and we’ll tell you honestly when your lot needs a hearing.

Why Boulder City’s Climate & Housing Affect ADU

The bedroom inside a new ADU

Boulder City sits in the Mojave Desert at the edge of the Muddy Mountains, and the conditions here are not valley-floor conditions. Summer heat is brutal, and the persistent winds off the Eldorado Valley push on anything you build. That means an ADU here needs heavier insulation, shaded or north-facing entries, and wind-rated construction that a coastal or downtown-Vegas builder can get away with skipping. We design for those loads from the first drawing, because retrofitting them costs more than building them in.

The housing stock splits along the same lines. In the original historic district you’ll find 1930s – 40s bungalows and masonry cottages near Nevada Way and the old downtown, often on tight parcels that bring design-review requirements into play. On the outskirts, 1960s – 80s ranch-style stucco homes sit on larger lots, but many have undersized or non-existent garages and aging septic or utility setups that limit what a detached ADU can legally connect to. Both ends of that spectrum shape the price, and both are reasons to know your parcel before you sketch a floor plan.

Pricing for ADU in Boulder City

Ranges, as promised. Garage conversion ADUs typically run $95,000 – $160,000 all-in, drawings through final inspection. New detached ADUs typically run $180,000 – $320,000 depending on size and site conditions. Junior ADU and interior conversions generally fall between $70,000 and $140,000. Site prep and utility work is quoted as its own line item, and aging septic on older Boulder City lots is the most common reason that number moves.

Every project is quoted with a written price before any work begins – Haven Standard, Clause 1. The scope is locked at signing, so the final number is the number you agreed to. Call (866) 403-8955 for a free estimate; you’ll get ranges specific to your parcel, not a valley average.

Service Area – Cities Near Boulder City

Boulder City is our focus here, but the same design-build approach serves homeowners nearby. If you’re just outside the city limits, we work in Henderson, Whitney, Paradise, and Enterprise. The rules differ from Boulder City’s, and we’ll tell you which path applies to your address.

Serving Boulder City, NV – Our Local Coverage Area

We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in Boulder City

Get Your Free Estimate

An efficiency kitchen in a junior ADU

If you own in Boulder City – a historic bungalow near Nevada Way, a ranch home on the outskirts, or anything in between – the honest first step is knowing what your parcel allows and what it will cost. Call (866) 403-8955 for a free estimate. You’ll get a written price before any work begins, a documented photo record on every visit, and a 365-Day Done Right Promise in writing. A live person answers, day or night.

Written by the team at Ellery ADU Studio.

Ready to get started? Free estimates in Boulder City
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Boulder City Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Boulder City

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Boulder City

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Boulder City. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch