A Ellery company - serving North Las Vegas, NV
A designer reviewing ADU plans and a model with homeowners
ADU Design & Permitting · Boulder City, NV

ADU Design & Permitting in Boulder City - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The living room inside a new ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
A new two-story ADU over a garage
An attached garage converted into living space
The private side entrance of a junior ADU
A compact kitchen inside a new ADU
A kitchenette inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Design & Permitting Across Boulder City

Boulder City isn’t Henderson. An ADU here can mean a variance, a conditional-use hearing, and in the historic core, a design-review board looking at your elevations. We draw permit sets for that reality every week. Our team runs the site assessment first, then builds drawings around ADU Design & Permitting rules specific to this town: Historic District submittals, family-member occupancy language, and conditional-use packages that valley-floor plans skip entirely. Call (866) 403-8955 to schedule a free estimate.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Boulder City’s Preferred ADU Design & Permitting Company

A project lead going over permit drawings with a homeowner

Boulder City homeowners research before they call, and that suits us. We quote a written price before any work begins, per Haven Standard Clause 1, so you’re never pricing a phantom project. Every project comes with a documented photo record on each visit: what we found on the slab, the setbacks we measured, the utility run we mapped. You get evidence, not a summary.

Our technicians have up to 11 years of experience, and each one shows a license number on the page and on the paperwork. On the design side, we know this town’s review path cold: the design-review board for the historic district, the conditional-use route through the city, and the family-member occupancy clause that trips up plans drawn elsewhere. A typical Boulder City ADU looks nothing like a Henderson casita on paper.

We’ve designed, permitted, and built 900+ ADUs since 2015, every one with a written price before work started. If a finished ADU isn’t built to the permitted drawings, our 365-Day Done Right Promise makes it right, in writing. A live person answers calls 24/7, and a free second opinion is available on any written estimate you already have.

Our ADU Design & Permitting Services in Boulder City

Site Assessment

We start on the ground, not in a template. On a 1960s-80s stucco ranch off the outskirts, the garage is often undersized at 18 feet and the septic or utility layout constrains where a detached unit can sit. A typical site assessment in Boulder City runs $450 – $900, and it flags the setbacks, wind exposure, and utility constraints before anyone draws a line.

Site Assessment

ADU Design & Blueprints

Design here often means drawing the unit twice: once to satisfy the Historic District’s design-review board and again to pass the conditional-use or variance hearing. We build both sets together so the eaves, roof pitch, and materials stay consistent. Design and blueprints typically run $4,500 – $9,500 depending on square footage and review complexity.

ADU Design & Blueprints

Permit Application

Permit fees in Boulder City tend to land between $2,800 and $6,500 for a detached unit, before review or hearing costs. We assemble the submittal, track the review comments, and prepare the hearing packet for the conditional-use path. If your plan stalls at design review, that’s on us to fix, not you.

Permit Application

HOA & Zoning Compliance

Boulder City still gates ADUs behind family-member occupancy rules and setbacks the valley doesn’t enforce. We read the zoning code against your lot lines, then write the compliance memo that goes into the permit package. That memo is the difference between a hearing that moves and one that stalls.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Boulder City

We specify and coordinate prefab and modular systems from Abodu, Plant Prefab, and Tuff Shed within the same single contract, so the shell and the permit set don’t belong to two different companies pointing at each other. We carry no parts locally, and we don’t claim to. What we do is fast turnaround on the drawings and clear coordination with the manufacturer, so a modular shell and a site-built foundation meet on the same schedule. James Hardie cladding shows up often on the stucco-heavy blocks here, because it handles the Mojave sun better than older materials.

Common ADU Design & Permitting Problems We See in Boulder City Homes

  • Henderson-style plans that stall. A drawing built for an over-the-counter permit fails here because Boulder City requires a conditional-use or variance path, and in the historic core, design review that can head to a public hearing.
  • Missing wind-rated anchoring. Fastener schedules and wind-rated connections get left off permit sets, so the gusts off the Eldorado Valley and the 100°F-plus summer load go unaddressed at design time. We put them in the set.
  • Undersized garages and aging septic. The 1960s-80s stucco ranches on the outskirts often have garages too small for a conversion and septic or utility setups that constrain a detached unit, caught only if the site assessment happens first.
  • Historic District design review surprises. The 1930s-40s masonry cottages near Nevada Way carry design-review requirements that reshape elevations, roof lines, and materials, and a plan without them gets redrawn mid-project.

Pricing for ADU Design & Permitting in Boulder City, NV

Design and permitting for a Boulder City ADU typically runs $8,000 – $18,000 all-in, drawings through permit issuance. That range covers the site assessment, the design and blueprint set, the permit application, and the zoning-compliance work. Detached units with a conditional-use hearing and Historic District design review sit at the top; a garage conversion on a straightforward lot sits lower. What moves the number is review complexity, square footage, and whether the site assessment turns up a utility constraint. Every project gets a written price before work begins, per Haven Standard Clause 1. Free estimate, no pressure, no urgency. Call (866) 403-8955 and we’ll walk your lot with you.

We Also Serve Cities Near Boulder City

Homeowners just outside Boulder City call us too. We work in Henderson, Whitney, Paradise, and Enterprise, and the permit path in each differs from what we handle in Boulder City. If you’re weighing an ADU across a city line, we’ll tell you plainly which rules apply where. Call (866) 403-8955 to compare.

Serving Boulder City, NV – Our Local Coverage Area

We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Design & Permitting in Boulder City

ADU plans, samples and a small model on a desk

Why Boulder City Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU design & permitting in Boulder City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Boulder City

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Boulder City Customers Say

Trusted by homeowners across Boulder City and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
The bathroom inside a new ADUA former garage converted into a guest houseThe sitting area and efficiency kitchen of a junior ADUA new modern ADU with wood claddingA new bathroom inside a converted garageThe bedroom inside a new ADU

More ADU services in Boulder City

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Boulder City?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Boulder City.

(866) 403-8955

Request a Free Estimate in Boulder City

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch