







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Services in Henderson, NV
Henderson homeowners thinking about an accessory dwelling unit are usually weighing three things at once: what the city will allow on their lot, what the HOA will allow on top of that, and what the whole thing will actually cost. We handle all three under one contract, at one written price, with the permit set built out before anyone swings a hammer. Our technicians bring up to 11 years of experience, and a live person answers our line around the clock at (866) 403-8955. This page is the hub for every ADU service we offer in Henderson, from first sketch to final inspection.
Why Henderson Homeowners Choose Ellery ADU Studio North Las Vegas

Ellery ADU Studio has worked as a design-build practice since 2015, and that single-contract structure is the reason people in Henderson call us. When the designer and the builder are the same party, there’s no finger-pointing when a setback dimension gets challenged at plan check or a window lands in the wrong place. You get a written price before work starts, per Haven Standard Clause 1, and a documented photo record on every visit so you can see what was found and what was done.
Henderson projects have their own rhythm. In Green Valley and Anthem, we’re typically coordinating HOA architectural review alongside the city submittal, because CC&Rs often run stricter than code on height and side-yard clearance. In MacDonald Ranch and Seven Hills, shallow lots make detached placement the first real design problem to solve. Our technicians are background-checked and their license number appears on every page – verified, not just claimed. If you already have a written estimate in hand from another firm, take our Free Second Opinion before you sign anything. Calls are answered by a person, not a voicemail queue.
ADU Services We Offer in Henderson
ADU Design & Permitting
The permit set is our core product, not a formality tacked onto construction. We draw, engineer, and submit to the City of Henderson, then answer plan-check comments ourselves so nothing stalls in a reviewer’s queue. Learn more about our ADU Design & Permitting in Henderson.

Garage Conversion ADU
Converting an existing garage is often the fastest route to a rentable unit, provided the slab, ceiling height, and egress all check out. We measure what’s there, tell you plainly whether it works, and lock the scope at signing. Learn more about our Garage Conversion ADU in Henderson.

New Detached ADU
Detached units are where Henderson’s setback puzzles get real – we solve footprint, HOA review, and utility routing together rather than sequentially. Some builds suit panelized systems, and we specify and coordinate brands like Mighty Buildings, Plant Prefab, or Tuff Shed within the same contract. Learn more about our New Detached ADU in Henderson.

Junior ADU & Interior Conversion
A JADU fits inside the existing footprint of your home, which sidesteps many lot-coverage questions that stop detached projects cold. We handle the interior reconfiguration, the kitchenette, and the separate entrance in one scope.
ADU Site Prep & Utilities
Grading, drainage, electrical service upgrades, and the trenching to connect water and sewer – all documented before the first day of construction. Site work is quoted as a line item, not discovered later.
Neighborhoods We Serve in Henderson
We work across Henderson’s master-planned communities and older pockets alike. Most estimates in these areas are scheduled within a few business days.
- Green Valley (89052)
- Anthem and Anthem Highlands
- MacDonald Ranch
- Seven Hills
- Downtown Henderson near Water Street (89015)
Why Henderson’s Climate & Housing Affect ADU
Henderson’s desert conditions change how an ADU has to be designed, and it’s the first thing we address in any drawing set. Summers regularly push past 100°F, so a detached unit needs heavier insulation, deeply shaded outdoor space, and a cooling strategy that doesn’t drive the electric bill sideways. Where evaporative cooling makes sense for our dry air, we evaluate it – something that wouldn’t be relevant in a wetter or milder market. Landscaping plans lean toward drought-tolerant species, which also helps with HOA water restrictions. Then there’s the housing stock itself: most Henderson subdivisions were built between 1990 and 2010 with stucco-and-tile construction and modest backyards, and the lots are frequently shallower than the homes’ square footage suggests. That means an ADU in Henderson often starts as a setback and shading exercise before it becomes a floor plan. We treat those constraints as design inputs from day one, not surprises at plan check.
Pricing for ADU in Henderson

Every project is quoted with a written price before any work begins, and every quote below is paired with that guarantee, per Haven Clause 1. Typical ranges in the Henderson market:
- Garage conversion ADU: roughly $95,000 to $175,000 all-in, drawings through final inspection.
- Junior ADU / interior conversion: roughly $65,000 to $120,000.
- New detached ADU: roughly $180,000 to $320,000 depending on size, prefab versus site-built, and utility runs.
- Design & permitting alone: project-specific, quoted as a line item.
Ranges shift with footprint, site slope, and whether an electrical service upgrade is required. Under Haven Clause 5 (No Surprises), your scope is locked at signing – no door-side upsells, no scope creep. Call (866) 403-8955 for a written estimate.
Service Area – Cities Near Henderson
We also take on ADU work in nearby home communities including Boulder City, Whitney, Paradise, and Enterprise. Each city runs its own permitting process and its own set of design review requirements, and we handle that paperwork the same way we handle Henderson’s.
Serving Henderson, NV – Our Local Coverage Area
We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About ADU in Henderson

Yes, in virtually all of Henderson’s master-planned communities, HOA architectural review runs first or in parallel, and CC&Rs frequently exceed city code on height, setback, and side-yard clearance. We pull the CC&Rs at the start and design to the stricter standard, so you aren’t redesigning after a committee rejection. Call (866) 403-8955 with your subdivision name and we’ll confirm what applies.
A garage conversion typically runs $95,000 to $175,000 all-in, drawings through final inspection. The spread comes down to slab condition, ceiling height, and whether the garage shares a wall with conditioned space. You’ll receive a written price before work starts; call (866) 403-8955 for an exact figure on your garage.
No – the scope is locked at signing under Haven Clause 5 (No Surprises), and the written price you sign is the price you pay. Change orders only occur if you request a scope change in writing. Call (866) 403-8955 to walk through the terms before you commit.
Yes, with heavy insulation, proper shading, and a cooling strategy matched to our dry desert air. We design for 100°F-plus conditions as a baseline, not an afterthought, and we evaluate evaporative cooling where it fits. Call (866) 403-8955 to discuss what your lot and orientation allow.
Yes – permitting is part of the design-build contract, not something you farm out separately. We submit the set, answer plan-check comments, and coordinate inspections through final sign-off. Call (866) 403-8955 to schedule your free estimate.
Schedule Your Free ADU Estimate in Henderson
Whether you’re in Anthem weighing a detached unit or in an older Water Street property considering a garage conversion, the first step is the same: a written price and a documented scope before anything begins. Call (866) 403-8955 to schedule your free estimate in Henderson. If you already have an estimate from another firm, bring it – our Free Second Opinion costs nothing and tells you exactly where the numbers land.
Written by the team at Ellery ADU Studio.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local ADU pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Henderson Customers Say
"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."
- Mireille T."Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."
- Stefan B."The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."
- Helena V.






