







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateFast, Reliable ADU Design & Permitting Across Boulder City
Boulder City isn’t Henderson. An ADU here can mean a variance, a conditional-use hearing, and in the historic core, a design-review board looking at your elevations. We draw permit sets for that reality every week. Our team runs the site assessment first, then builds drawings around ADU Design & Permitting rules specific to this town: Historic District submittals, family-member occupancy language, and conditional-use packages that valley-floor plans skip entirely. Call (866) 403-8955 to schedule a free estimate.
Why Ellery ADU Studio North Las Vegas Is Boulder City’s Preferred ADU Design & Permitting Company

Boulder City homeowners research before they call, and that suits us. We quote a written price before any work begins, per Haven Standard Clause 1, so you’re never pricing a phantom project. Every project comes with a documented photo record on each visit: what we found on the slab, the setbacks we measured, the utility run we mapped. You get evidence, not a summary.
Our technicians have up to 11 years of experience, and each one shows a license number on the page and on the paperwork. On the design side, we know this town’s review path cold: the design-review board for the historic district, the conditional-use route through the city, and the family-member occupancy clause that trips up plans drawn elsewhere. A typical Boulder City ADU looks nothing like a Henderson casita on paper.
We’ve designed, permitted, and built 900+ ADUs since 2015, every one with a written price before work started. If a finished ADU isn’t built to the permitted drawings, our 365-Day Done Right Promise makes it right, in writing. A live person answers calls 24/7, and a free second opinion is available on any written estimate you already have.
Our ADU Design & Permitting Services in Boulder City
Site Assessment
We start on the ground, not in a template. On a 1960s-80s stucco ranch off the outskirts, the garage is often undersized at 18 feet and the septic or utility layout constrains where a detached unit can sit. A typical site assessment in Boulder City runs $450 – $900, and it flags the setbacks, wind exposure, and utility constraints before anyone draws a line.

ADU Design & Blueprints
Design here often means drawing the unit twice: once to satisfy the Historic District’s design-review board and again to pass the conditional-use or variance hearing. We build both sets together so the eaves, roof pitch, and materials stay consistent. Design and blueprints typically run $4,500 – $9,500 depending on square footage and review complexity.

Permit Application
Permit fees in Boulder City tend to land between $2,800 and $6,500 for a detached unit, before review or hearing costs. We assemble the submittal, track the review comments, and prepare the hearing packet for the conditional-use path. If your plan stalls at design review, that’s on us to fix, not you.

HOA & Zoning Compliance
Boulder City still gates ADUs behind family-member occupancy rules and setbacks the valley doesn’t enforce. We read the zoning code against your lot lines, then write the compliance memo that goes into the permit package. That memo is the difference between a hearing that moves and one that stalls.
Trusted Brands We Service in Boulder City
We specify and coordinate prefab and modular systems from Abodu, Plant Prefab, and Tuff Shed within the same single contract, so the shell and the permit set don’t belong to two different companies pointing at each other. We carry no parts locally, and we don’t claim to. What we do is fast turnaround on the drawings and clear coordination with the manufacturer, so a modular shell and a site-built foundation meet on the same schedule. James Hardie cladding shows up often on the stucco-heavy blocks here, because it handles the Mojave sun better than older materials.
Common ADU Design & Permitting Problems We See in Boulder City Homes
- Henderson-style plans that stall. A drawing built for an over-the-counter permit fails here because Boulder City requires a conditional-use or variance path, and in the historic core, design review that can head to a public hearing.
- Missing wind-rated anchoring. Fastener schedules and wind-rated connections get left off permit sets, so the gusts off the Eldorado Valley and the 100°F-plus summer load go unaddressed at design time. We put them in the set.
- Undersized garages and aging septic. The 1960s-80s stucco ranches on the outskirts often have garages too small for a conversion and septic or utility setups that constrain a detached unit, caught only if the site assessment happens first.
- Historic District design review surprises. The 1930s-40s masonry cottages near Nevada Way carry design-review requirements that reshape elevations, roof lines, and materials, and a plan without them gets redrawn mid-project.
Pricing for ADU Design & Permitting in Boulder City, NV
Design and permitting for a Boulder City ADU typically runs $8,000 – $18,000 all-in, drawings through permit issuance. That range covers the site assessment, the design and blueprint set, the permit application, and the zoning-compliance work. Detached units with a conditional-use hearing and Historic District design review sit at the top; a garage conversion on a straightforward lot sits lower. What moves the number is review complexity, square footage, and whether the site assessment turns up a utility constraint. Every project gets a written price before work begins, per Haven Standard Clause 1. Free estimate, no pressure, no urgency. Call (866) 403-8955 and we’ll walk your lot with you.
We Also Serve Cities Near Boulder City
Homeowners just outside Boulder City call us too. We work in Henderson, Whitney, Paradise, and Enterprise, and the permit path in each differs from what we handle in Boulder City. If you’re weighing an ADU across a city line, we’ll tell you plainly which rules apply where. Call (866) 403-8955 to compare.
Serving Boulder City, NV – Our Local Coverage Area
We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – ADU Design & Permitting in Boulder City

Boulder City was built as a federally planned, no-growth workers’ town for Hoover Dam, and its charter and historic core have kept ADUs tightly regulated, often limited to family members or special permits. That means an ADU here usually starts with a conditional-use or variance path that Henderson and Las Vegas homeowners skip entirely. We build the hearing package into the permit set from day one. Call (866) 403-8955 for an exact quote on your lot.
Yes. In the historic core near Nevada Way and the old downtown, the design-review board looks at elevations, roof pitch, materials, and how the unit sits against the 1930s-40s masonry cottages. That reshapes the drawings, and it’s why we often draw the plan twice: once for design review, once for the hearing. A plan without those two versions stalls. Call (866) 403-8955 to schedule a free estimate.
The persistent winds off the Eldorado Valley are the real materials driver here, not coastal salt air. Wind-rated fastening, anchoring schedules, and heat-mitigating insulation and shading have to be written into the permit set, and valley-floor plans often omit them. We specify heavy insulation, shaded or north-facing entries, and wind-rated connections because the Mojave summer and the gusts demand it. Call (866) 403-8955 for a written quote.
It can. Those stucco ranches on the outskirts often have garages too small for a conversion and septic or utility setups that constrain a detached unit, and if the site assessment misses them, you’re redesigning after the family-member occupancy rule and setbacks are already locked in. We run the assessment first, then draw. A typical site assessment in Boulder City runs $450 – $900. Call (866) 403-8955 for a free estimate.
Ask for three things a Henderson plan won’t have: the Historic District design-review submittal, the conditional-use or variance hearing package, and the wind-rated anchoring and fastener schedule. A permit package without those three is drawn for a different city. Our written price covers all of it before work starts, per Haven Standard Clause 1. Call (866) 403-8955 – estimates are free.
Ready to price your Boulder City ADU the honest way? Call Ellery ADU Studio North Las Vegas at (866) 403-8955 for a free estimate. You’ll get a written price before any work begins, a documented photo record of every visit, and drawings built for this town’s review path, not a valley template.
Written by the team at Ellery ADU Studio.










