A Ellery company - serving North Las Vegas, NV
A backyard ADU foundation formed and ready to pour
ADU Site Prep & Utilities · North Las Vegas, NV

ADU Site Prep & Utilities in North Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The private side entrance of a junior ADU
A compact kitchen inside a new ADU
A kitchenette inside a converted garage
A new modern ADU with wood cladding
A new bathroom inside a converted garage
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Site Prep & Utilities Across North Las Vegas

North Las Vegas ADU site prep is decided by drainage before it’s decided by zoning. On a lot that backs onto a regional flood-control wash, the pad location has to be checked against the drainage easement behind the block wall before anyone pours concrete or digs a trench. We’re Ellery ADU Studio, a design-build practice that has handled ADU work since 2015, and we know this valley’s lot-by-lot pattern well enough to flag a wash problem before it costs you a redesign. Our technicians have up to 11 years of experience. Every project gets a written price before work starts. Call (866) 403-8955 to schedule a free estimate.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is North Las Vegas’s Preferred ADU Site Prep & Utilities Company

A fresh concrete slab for a backyard ADU

North Las Vegas homeowners research before they call, and the questions we hear most are about drainage, documentation and whether the finished ADU will insure cleanly. Those are the right questions. Our ADU Site Prep & Utilities work answers them in writing: an engineered grading plan, compaction testing, and wind and flood documentation you can hand to an insurer or a permit clerk without a fight.

We’ve designed, permitted and built 900+ ADUs since 2015, every one with a written price before work started and a documented photo record at completion. That record matters in North Las Vegas, where the central-grid postwar homes near downtown and the newer Aliante and Nellis-area subdivisions fail site prep for completely different reasons. A live person answers calls 24/7, no voicemail queue. And if you already have a written estimate in hand from another outfit, we’ll give you a free second opinion on it, clause by clause.

Under Clause 1 of The Haven Standard, you get a written price before any work begins. Under Clause 5 (No Surprises), the scope is locked at signing: no door-side upsells, no mid-job change orders. That’s how a five-figure site-prep line stays a five-figure site-prep line.

Our ADU Site Prep & Utilities Services in North Las Vegas

Foundation & Grading in North Las Vegas

In the older central core, along the Las Vegas Blvd and 5th St corridors, we’re usually grading around block-and-stucco ranch homes with detached garages on generous lots, and the existing slab is often 4 inches, within range for a conversion. On the newer north and west edges, near the Nellis and DECATUR-adjacent subdivisions, the work is different: the rear of the lot often falls toward a regional flood-control wash, so grading has to hold a positive slope away from the structure and route monsoon sheet flow around the pad. A North Las Vegas grading pad typically runs $8,000-$18,000 depending on the cut-and-fill and whether engineered drainage is required.

Electrical Panel Upgrade in North Las Vegas

Most North Las Vegas ADU projects need a panel upgrade, and it should be planned before the pad is poured, not after. A 200-amp service upgrade here typically runs $2,800-$6,500, and the trench for the feeder has to match the final pad elevation. That’s where cheap quotes slip: they stub the electrical to a pad location that later has to move off a drainage easement, and the whole trench gets re-excavated.

Plumbing Lateral in North Las Vegas

A separate plumbing lateral in North Las Vegas typically runs $3,500-$9,000, higher when the run crosses an existing driveway or has to tie into a sewer main under a street. The lateral gets trenched and inspected in the same pass as the grading, so the slope and depth are set against the pad, not against the lot’s original grade. On 1960s and 70s homes in the central grid, we often find the existing lateral is cast iron at the end of its service life, and that shows up in the written scope before work starts.

Gas Line Extension in North Las Vegas

A gas line extension for a North Las Vegas ADU runs $1,500-$4,800, and pressure-testing and inspection are part of the line item. On exposed desert lots, the extension also has to be buried at the right depth and protected against the summer heat cycling the ground. We flag every gas consideration in the written scope: this is dangerous work, and only a licensed gas fitter should touch the line.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in North Las Vegas

On prefab and modular builds, we coordinate the site-prep side of systems from Plant Prefab, Abodu, Tuff Shed and James Hardie within the same single contract. We don’t stock parts or claim local inventory; we specify the system, coordinate the delivery and set, and make sure the pad, the electrical service and the plumbing lateral are all built to the manufacturer’s set requirements. When the pad elevation has to shift off a drainage easement, the set date shifts with it, and we handle that coordination so you’re not the one on the phone. That’s the same single-contract model covering your drawings and your construction, so nobody can point at the other when something is off.

Common ADU Site Prep & Utilities Problems We See in North Las Vegas Homes

  • A pad set on the lot’s rear low corner that drains to a regional wash. The first monsoon sends sheet flow against the stem wall and undermines grading that was never certified for the floodplain. That’s the North Las Vegas pattern on the northern subdivisions, and it costs far more to fix after concrete than to plan around.
  • Electrical and plumbing laterals trenched and backfilled before the pad elevation and drainage inspection. When the buildable envelope has to move off a drainage easement, everything re-stubs, and the re-excavation lands in your lap unless it was scoped from the start.
  • A low-cost quote that omits engineered grading, compaction testing and wind-load documentation for the exposed desert site. The ADU goes in, but closing the permit and insuring it becomes a fight. On a lot in the path of summer wash flows, that documentation is the difference between an insurable asset and a headache.
  • HOA overlays on the 1990s-2010s Nellis and DECATUR-area subdivisions. Small, tightly-set lots with HOA rules often rule out a detached unit entirely, and the site-prep plan has to pivot to attached or garage-conversion before anyone trenches.

Pricing for ADU Site Prep & Utilities in North Las Vegas, NV

Honest numbers, so you can weigh the decision before you call. In North Las Vegas, foundation and grading typically runs $8,000-$18,000, electrical panel upgrade $2,800-$6,500, plumbing lateral $3,500-$9,000, and gas line extension $1,500-$4,800. Landscaping and hardscape after the build adds another $4,000-$12,000 depending on the pad, shade and covered parking you want. What moves the number: cut-and-fill volume, whether engineered drainage is required, the distance to the sewer main, and how close the rear of the lot sits to a regional wash or recorded easement. Every project gets a written price before any work begins, per Haven Clause 1. The estimate is free. Call (866) 403-8955.

We Also Serve Cities Near North Las Vegas

If you’re just outside the city, we also handle site prep for ADU Site Prep & Utilities in North Las Vegas and the surrounding areas, including Las Vegas, Sunrise Manor, Winchester and Whitney. The drainage and floodplain questions differ by jurisdiction, and we’ll tell you which one applies to your lot.

Serving North Las Vegas, NV – Our Local Coverage Area

We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Site Prep & Utilities in North Las Vegas

A utility trench with new sewer pipe and conduit

Why North Las Vegas Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU site prep & utilities in North Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Las Vegas

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Las Vegas Customers Say

Trusted by homeowners across North Las Vegas and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
An efficiency kitchen in a junior ADUA new two-story ADU over a garageAn attached garage converted into living spaceThe sitting area and efficiency kitchen of a junior ADUThe living room inside a new ADUA bedroom and desk inside a converted garage

More ADU services in North Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in North Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Las Vegas.

(866) 403-8955

Request a Free Estimate in North Las Vegas

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch