A Ellery company - serving North Las Vegas, NV
A junior ADU suite with its own kitchen and door
Junior ADU & Interior Conversion · Las Vegas, NV

Junior ADU & Interior Conversion in Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The private side entrance of a junior ADU
The sitting area and efficiency kitchen of a junior ADU
A new bathroom inside a converted garage
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
The living room inside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Junior ADU & Interior Conversion Across Las Vegas

Junior ADU and interior conversion work in Las Vegas runs on a different clock than most homeowners expect. Before Clark County sees a permit, your HOA’s architectural review committee usually sees the drawings first, and that committee meeting can add weeks. We know this valley well: the post-1990 stucco tract homes in 89129, 89131, and 89149, the 20-foot side-yard strips beside the pool equipment, the rear-lot coverage caps that decide the footprint before a single interior wall moves. Our technicians have up to 11 years of experience, and our team treats the HOA submittal packet as the first real deliverable. Call (866) 403-8955 to schedule your free estimate.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Las Vegas’s Preferred Junior ADU & Interior Conversion Company

An efficiency kitchen in a junior ADU

We’ve designed and permitted 900+ ADUs since 2015, and the share of those in Las Vegas has grown as the valley’s master-planned communities have filled in. Every project carries a written price before any work starts, per Haven Standard Clause 1, and a documented photo record on every visit, so you see what we found and what we did rather than a summary of how it felt. A live person answers our calls 24/7, and a free second opinion is available on any written estimate you already have in hand.

The reason homeowners in Las Vegas keep calling us back is sequencing. We’ve learned the local review rhythm: which palettes and elevations the committees in these ZIPs tend to approve, how long a submittal packet actually sits in queue, and how to file it. We’re the ones who file it, track it, and respond to corrections. If you want an exact scope and price on a JADU or room conversion in Las Vegas, we put it in writing before anything begins.

Our Junior ADU & Interior Conversion Services in Las Vegas

Interior JADU, room-to-ADU conversion, and attached addition ADU work make up most of what we handle in Las Vegas. Each is a distinct scope with its own review math. Our Junior ADU & Interior Conversion team walks the property, checks the setbacks and coverage limits against your lot, and builds the submittal packet around what your community’s CC&Rs actually ask for.

Interior JADU

A JADU (junior ADU) is carved out of the existing house, typically a bedroom-and-bath cluster converted with its own entrance and a small kitchenette. In Las Vegas, the biggest constraints are the rear-lot coverage math and the HOA’s palette requirements for any exterior door or window you add. Most JADUs run 350 to 500 square feet, and the plumbing tie-in location often drives the room selection more than anything else.

Room-to-ADU Conversion

Room-to-ADU work in master-planned ZIPs like 89129 and 89131 usually means converting a bedroom suite or a bonus room into a self-contained unit. The 20-foot side-yard strip and rear-lot coverage caps dictate what you can add to the exterior before any interior work gets drawn. We lock those numbers before demolition starts, so the interior doesn’t sit half-open waiting on a correction cycle.

Attached Addition ADU

An attached addition ADU adds new conditioned space to the existing house: a bump-out studio, a primary-suite addition with its own entry, or a rear extension with a dedicated kitchenette. For Las Vegas lots, we check rear-lot coverage first, then the HOA’s setback and height requirements. Roof overhangs and shading are part of the design from day one, because a 110°F summer will find any weak spot in the envelope.

Basement and Above-Garage ADU

Basements are rare in Las Vegas’s post-1990 stucco tract stock, so most basement ADU requests here involve older properties or hillside lots near the valley edges. Above-garage ADU work is more common: the garage roof line is already there, and the question is whether the structure, HVAC, and the HOA’s height rules can carry a second story. We verify all three before pricing.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Las Vegas

For prefab and modular components, we specify and coordinate systems from Mighty Buildings, Boxabl, and Plant Prefab within the same single contract, so the design, the permit set, and the install don’t get handed off between parties. We don’t claim parts stock and we don’t claim an in-house warehouse, because we don’t have one. What we have is brand fluency, real coordination experience, and a written scope that names every component before it’s ordered. That’s what lets us hold a schedule instead of chasing it once the unit ships.

Common Junior ADU & Interior Conversion Problems We See in Las Vegas Homes

  • Submittal packet sent to HOA review before elevations, color chips and rear-lot coverage math are locked. The interior demolition sits half-open while the committee meets. In a post-2000 tract home, the CC&R packet can ask for elevation drawings that don’t exist yet.
  • JADU HVAC tapped off the main house system. In a Las Vegas 110°F summer, a borrowed line from an undersized tract-home HVAC shows up as a hot bedroom by July. We spec dedicated high-SEER mini-splits and upgraded insulation instead.
  • Room-to-ADU conversion drawn without checking the 20-foot side-yard and rear-lot coverage limits. This is the classic problem in 89129, 89131, and 89149 lots. A redesign after permit review has already started costs weeks and money.
  • Exterior door and window placements that don’t match the community palette. The HOA approves a specific style and color; a mismatched door means a correction cycle, and the interior rough-in sits exposed while it’s re-reviewed.

Pricing for Junior ADU & Interior Conversion in Las Vegas, NV

A compact kitchen inside a new ADU

What’s this cost in Las Vegas? A typical interior JADU runs $85,000 to $140,000 all-in, drawings through final inspection, depending on the plumbing tie-in location and whether new exterior door and window framing is required. A room-to-ADU conversion typically runs $70,000 to $125,000. An attached addition ADU runs $160,000 to $260,000 in the Las Vegas market, and above-garage conversions run $135,000 to $210,000 depending on whether the existing structure carries a second-story load.

The HOA review doesn’t change the construction price, but it does change the schedule: plan for four to eight weeks of review before Clark County issues the permit. Every quote is written, line-item, and locked before any work begins (Haven Standard Clause 1). Under Clause 5 (No Surprises), the scope is fixed at signing; no door-side upsells, no scope creep. Call (866) 403-8955 for a free written estimate.

We Also Serve Cities Near Las Vegas

We handle junior ADU and interior conversion work throughout Las Vegas and the surrounding communities. If you’re in Winchester, North Las Vegas, Sunrise Manor, or Paradise, our team coordinates the same written-price, HOA-aware process. The valley’s tract-home stock and HOA rules repeat across those cities, so the sequence and the submittal approach carry over.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Junior ADU & Interior Conversion in Las Vegas

A kitchenette inside a converted garage

Why Las Vegas Chooses Ellery ADU Studio North Las Vegas

We set the standard for junior ADU & interior conversion in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your junior ADU & interior conversion project started is simple.

1

Call or Request a Free Estimate

Tell us about your junior ADU & interior conversion project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local junior ADU & interior conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

More ADU services in Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Junior ADU & Interior Conversion in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(866) 403-8955

Request a Free Estimate in Las Vegas

Tell us about your junior ADU & interior conversion needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch