A Ellery company - serving North Las Vegas, NV
A designer reviewing ADU plans and a model with homeowners
ADU Design & Permitting · Las Vegas, NV

ADU Design & Permitting in Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
A new two-story ADU over a garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Design & Permitting Across Las Vegas

Most ADU projects in Las Vegas don’t stall at the city building department. They stall at the HOA architectural review committee. Nevada’s AB 135, passed in 2019, forces HOAs to allow accessory dwelling units, but it doesn’t stop a design-review committee from spending weeks on roof pitch, paint color, and side-yard setbacks before a single permit application goes in. That reversed sequence is the whole game here, and it’s why local expertise matters more than a drawing set that looks good on paper. Call (866) 403-8955 and we’ll walk your lot, read your CC&Rs, and tell you what actually clears review.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Las Vegas’s Preferred ADU Design & Permitting Company

ADU plans, samples and a small model on a desk

We’ve designed and permitted ADUs across the valley since 2015, back when California’s ADU rules were rewriting how the West builds backyard housing, and 900+ units later we know exactly where Las Vegas projects break. Our reputation here is built on a specific habit: we tell homeowners what the committee will accept before they spend money finding out the hard way. The plan set, the HOA packet, and the permit submittal all come from the same team, so nobody points at the other party when a correction notice lands.

Our technicians have up to 11 years of experience, and every one of them has walked a stucco-and-tile tract lot in 89128 or 89149 and measured a pool-equipment strip against a survey. We answer calls live, 24/7, with a real person on the line, and we offer a free second opinion on any written estimate you already have. Under Haven Standard Clause 1, you get a written price before any work begins, and under the 365-Day Done Right Promise, if the finished ADU isn’t built to the permitted drawings, we make it right in writing. For more on how the studio works end to end, see our ADU Design & Permitting hub.

Our ADU Design & Permitting Services in Las Vegas

Site Assessment

On a typical post-2000 master-planned lot, the ADU footprint gets squeezed into a roughly 20-foot side-yard strip boxed in by pool equipment and rear-lot coverage limits. We measure the survey against the actual setbacks before a line gets drawn, so the footprint is resolved early rather than redesigned later. A site assessment in Las Vegas usually runs $450 – $900, and it includes a documented photo record of what we found.

Site Assessment

ADU Design & Blueprints

Design in Las Vegas has to answer to two audiences at once – the HOA palette-and-mass review and the city’s energy and monsoon drainage checks – so we draw for both from the start. Expect stucco and tile matched to the parent house, a roof pitch that mirrors it, deep overhangs, and high-SEER mini-splits sized for 110°F summers. Design and blueprint work typically lands at $4,500 – $9,500 depending on unit size and whether it’s detached or an attached studio.

ADU Design & Blueprints

Permit Application

We pull the permits and manage the submittals, and we do the sequencing correctly: HOA packet filed first, city packet right behind it, so both clocks run in parallel instead of in series. Permitting fees and processing in Las Vegas run $2,000 – $6,500 on a standard detached ADU, and you get the written scope and the final inspection record when it’s done.

Permit Application

HOA & Zoning Compliance

This is where most Las Vegas ADU projects live or die. We read your CC&Rs, prepare the full architectural-review submittal packet – elevations, color chips, material samples, setback and lot-coverage calculations – and file it on your behalf. HOA compliance work typically runs $1,200 – $3,500, and we schedule construction around the approval calendar so the job isn’t sitting half-built waiting on a committee.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Las Vegas

We specify and coordinate prefab and modular systems within the same contract, and we’re fluent in the brands that actually clear Las Vegas review: Plant Prefab’s panelized systems, Boxabl’s fold-out units where a tight lot rules out stick-built, and James Hardie siding where a HOA palette calls for a specific profile. We don’t warehouse or stock anything locally – every component is ordered to your approved design and coordinated against your build schedule. Turnaround comes from knowing what the committee wants before we order.

Common ADU Design & Permitting Problems We See in Las Vegas Homes

  • City permit drawings submitted before HOA architectural review is resolved. Approval stalls the schedule and the job sits idle waiting on a design committee. The fix is sequencing HOA first, permit second.
  • Colors, roof pitch, or materials that clash with the parent house. This draws a correction notice from the review committee that restarts the clock. Matching stucco and tile from day one avoids the restart.
  • Ignoring side-yard setback and rear-lot coverage math in ZIPs like 89129, 89131, and 89149. The pool-equipment strip won’t fit the planned footprint, forcing a redesign after the survey lands.
  • Designing for a flat, sun-baked lot with thin insulation and a low-slope roof. That fails both the HOA’s mass review and the city’s energy and monsoon-drainage checks at the same time – a double correction that costs weeks.

Pricing for ADU Design & Permitting in Las Vegas, NV

Every project gets a written price before any work begins – Haven Standard Clause 1, no exceptions. For a typical detached studio or 1-bedroom ADU in Las Vegas, design and permitting all-in runs $8,000 – $18,000, broken into site assessment, design and blueprints, HOA compliance, and permit application as listed above. What moves the number: lot tightness, whether the HOA review is straightforward or drawn out, and whether the design is ground-up detached or attached. We give you a line-item written quote, and the estimate is free. No door-side upsells, no scope creep after signing.

We Also Serve Cities Near Las Vegas

Our work in Las Vegas extends to homeowners in Winchester, North Las Vegas, Sunrise Manor, and Paradise – the same valley, the same master-planned HOA playbook, the same AB 135 sequencing. If your lot sits just outside the city limits in an unincorporated pocket, the review path can shift, so it’s worth the call to confirm which process applies. Call (866) 403-8955 to schedule your free estimate.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Design & Permitting in Las Vegas

A project lead going over permit drawings with a homeowner

Why Las Vegas Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU design & permitting in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
An attached garage converted into living spaceThe private side entrance of a junior ADUA compact kitchen inside a new ADUA kitchenette inside a converted garageA new modern ADU with wood claddingThe bedroom inside a new ADU

More ADU services in Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(866) 403-8955

Request a Free Estimate in Las Vegas

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch