Junior ADU and interior conversion work in Las Vegas runs on a different clock than most homeowners expect. Before Clark County sees a permit, your HOA’s architectural review committee usually sees the drawings first, and that committee meeting can add weeks. We know this valley well: the post-1990 stucco tract homes in 89129, 89131, and 89149, the 20-foot side-yard strips beside the pool equipment, the rear-lot coverage caps that decide the footprint before a single interior wall moves. Our technicians have up to 11 years of experience, and our team treats the HOA submittal packet as the first real deliverable. Call (866) 403-8955 to schedule your free estimate.
Why Ellery ADU Studio North Las Vegas Is Las Vegas’s Preferred Junior ADU & Interior Conversion Company

We’ve designed and permitted 900+ ADUs since 2015, and the share of those in Las Vegas has grown as the valley’s master-planned communities have filled in. Every project carries a written price before any work starts, per Haven Standard Clause 1, and a documented photo record on every visit, so you see what we found and what we did rather than a summary of how it felt. A live person answers our calls 24/7, and a free second opinion is available on any written estimate you already have in hand.
The reason homeowners in Las Vegas keep calling us back is sequencing. We’ve learned the local review rhythm: which palettes and elevations the committees in these ZIPs tend to approve, how long a submittal packet actually sits in queue, and how to file it. We’re the ones who file it, track it, and respond to corrections. If you want an exact scope and price on a JADU or room conversion in Las Vegas, we put it in writing before anything begins.
Our Junior ADU & Interior Conversion Services in Las Vegas
Interior JADU, room-to-ADU conversion, and attached addition ADU work make up most of what we handle in Las Vegas. Each is a distinct scope with its own review math. Our Junior ADU & Interior Conversion team walks the property, checks the setbacks and coverage limits against your lot, and builds the submittal packet around what your community’s CC&Rs actually ask for.
Interior JADU
A JADU (junior ADU) is carved out of the existing house, typically a bedroom-and-bath cluster converted with its own entrance and a small kitchenette. In Las Vegas, the biggest constraints are the rear-lot coverage math and the HOA’s palette requirements for any exterior door or window you add. Most JADUs run 350 to 500 square feet, and the plumbing tie-in location often drives the room selection more than anything else.
Room-to-ADU Conversion
Room-to-ADU work in master-planned ZIPs like 89129 and 89131 usually means converting a bedroom suite or a bonus room into a self-contained unit. The 20-foot side-yard strip and rear-lot coverage caps dictate what you can add to the exterior before any interior work gets drawn. We lock those numbers before demolition starts, so the interior doesn’t sit half-open waiting on a correction cycle.
Attached Addition ADU
An attached addition ADU adds new conditioned space to the existing house: a bump-out studio, a primary-suite addition with its own entry, or a rear extension with a dedicated kitchenette. For Las Vegas lots, we check rear-lot coverage first, then the HOA’s setback and height requirements. Roof overhangs and shading are part of the design from day one, because a 110°F summer will find any weak spot in the envelope.
Basement and Above-Garage ADU
Basements are rare in Las Vegas’s post-1990 stucco tract stock, so most basement ADU requests here involve older properties or hillside lots near the valley edges. Above-garage ADU work is more common: the garage roof line is already there, and the question is whether the structure, HVAC, and the HOA’s height rules can carry a second story. We verify all three before pricing.
Trusted Brands We Service in Las Vegas
For prefab and modular components, we specify and coordinate systems from Mighty Buildings, Boxabl, and Plant Prefab within the same single contract, so the design, the permit set, and the install don’t get handed off between parties. We don’t claim parts stock and we don’t claim an in-house warehouse, because we don’t have one. What we have is brand fluency, real coordination experience, and a written scope that names every component before it’s ordered. That’s what lets us hold a schedule instead of chasing it once the unit ships.
Common Junior ADU & Interior Conversion Problems We See in Las Vegas Homes
- Submittal packet sent to HOA review before elevations, color chips and rear-lot coverage math are locked. The interior demolition sits half-open while the committee meets. In a post-2000 tract home, the CC&R packet can ask for elevation drawings that don’t exist yet.
- JADU HVAC tapped off the main house system. In a Las Vegas 110°F summer, a borrowed line from an undersized tract-home HVAC shows up as a hot bedroom by July. We spec dedicated high-SEER mini-splits and upgraded insulation instead.
- Room-to-ADU conversion drawn without checking the 20-foot side-yard and rear-lot coverage limits. This is the classic problem in 89129, 89131, and 89149 lots. A redesign after permit review has already started costs weeks and money.
- Exterior door and window placements that don’t match the community palette. The HOA approves a specific style and color; a mismatched door means a correction cycle, and the interior rough-in sits exposed while it’s re-reviewed.
Pricing for Junior ADU & Interior Conversion in Las Vegas, NV

What’s this cost in Las Vegas? A typical interior JADU runs $85,000 to $140,000 all-in, drawings through final inspection, depending on the plumbing tie-in location and whether new exterior door and window framing is required. A room-to-ADU conversion typically runs $70,000 to $125,000. An attached addition ADU runs $160,000 to $260,000 in the Las Vegas market, and above-garage conversions run $135,000 to $210,000 depending on whether the existing structure carries a second-story load.
The HOA review doesn’t change the construction price, but it does change the schedule: plan for four to eight weeks of review before Clark County issues the permit. Every quote is written, line-item, and locked before any work begins (Haven Standard Clause 1). Under Clause 5 (No Surprises), the scope is fixed at signing; no door-side upsells, no scope creep. Call (866) 403-8955 for a free written estimate.
We Also Serve Cities Near Las Vegas
We handle junior ADU and interior conversion work throughout Las Vegas and the surrounding communities. If you’re in Winchester, North Las Vegas, Sunrise Manor, or Paradise, our team coordinates the same written-price, HOA-aware process. The valley’s tract-home stock and HOA rules repeat across those cities, so the sequence and the submittal approach carry over.
Serving Las Vegas, NV – Our Local Coverage Area
We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Junior ADU & Interior Conversion in Las Vegas

Yes, the HOA can’t prohibit a junior ADU outright under AB 135 (2019), but it can still require an architectural submittal and enforce reasonable standards on set-backs, palette, and elevation. AB 135 forces the HOA to allow the unit; it doesn’t waive the submittal process. We prepare and file the packet, respond to corrections, and track the review timeline for you. Call (866) 403-8955 to talk through your community’s review scope.
Plan on four to eight weeks of HOA review before Clark County permitting begins, more if the committee only meets monthly or requests a correction cycle. A clean submittal with locked elevations, color chips, and rear-lot coverage math runs on the shorter end. We build the review window into the project schedule so interior work doesn’t sit exposed waiting on the committee. Call (866) 403-8955 for a schedule walk-through on your property.
Garage conversions are possible but less common in Las Vegas than in older cities; most of the valley’s tract homes sit on lots where a ground-up detached studio or an interior JADU is the better fit. Basements are rare in post-1990 stucco stock, so basement ADU requests tend to involve older or hillside properties. We look at the slab, the existing structure, and the lot coverage before recommending which path makes sense. Call (866) 403-8955 to schedule a walk-through.
A dedicated high-SEER mini-split, upgraded insulation, and shading, not a borrowed line from the main house system. Summer highs in Las Vegas regularly exceed 110°F and the valley gets under 5 inches of rain a year, so the JADU envelope has to handle both heat and intense UV. A tract-home HVAC tapped for the whole house will hit capacity in July if the JADU tries to share it. Ask about the HVAC spec when you call (866) 403-8955 for your estimate.
At minimum: elevation drawings, exterior color and finish chips that match the community palette, a site plan showing the unit inside the rear-lot coverage limit and the side-yard setbacks, and a written scope describing what’s being built or converted. Some communities ask for a drainage plan or a landscape buffer. We prepare and file the packet as part of the project, so you’re not sending drawings back and forth on your own. Call (866) 403-8955 to start the submittal conversation.
Ready to price a junior ADU or interior conversion in Las Vegas? Call (866) 403-8955 for a free estimate. Every quote is written, line-item, and locked before any work begins, and our team handles the HOA submittal packet as part of the design-build scope. Free second opinion available on any written estimate you already have.