A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
Whitney, NV

ADU Services in Whitney - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
A kitchenette inside a converted garage
A new bathroom inside a converted garage
A former garage converted into a guest house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in Whitney, NV

If you own a 1970s or 1980s single-story tract home in Whitney and you’ve started sketching a casita for aging parents or a garage conversion for rental income, you’ve probably already hit the first real obstacle: nobody can agree on where the septic line runs. That’s the shape of ADU work in Whitney, and it’s where most projects stall before drawings even start. We’re Ellery ADU Studio North Las Vegas, and we quote ADU work in Whitney at a written price before any work begins. Call (866) 403-8955 and a live person answers, day or night.

Call (866) 403-8955

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Why Whitney Homeowners Choose Ellery ADU Studio North Las Vegas

The bedroom inside a new ADU

Whitney sits in unincorporated Clark County, ZIP 89122, and the ADU rules here are county rules layered over state law, not city rules. That distinction trips up contractors who spend most of their time inside Las Vegas city limits. We work in the unincorporated pockets off Boulder Highway and around the Sunrise Manor edge often enough that we know what the county plan reviewers ask for, and we know which of these older lots have the septic and RV pad quirks that change a foundation line item.

Under the Haven Standard, every Whitney project gets three things in writing: a price before work starts (Clause 1), a documented photo record on every visit, and a 365-Day Done Right Promise. If the finished ADU isn’t built to the permitted drawings, we make it right. Our technicians have up to 11 years of experience, and they’re background-checked with license numbers shown, not claimed. We also offer a free second opinion on any written estimate you already have in hand, because a lot of Whitney homeowners are holding one right now and aren’t sure what’s missing from it.

ADU Services We Offer in Whitney

Five services, one contract, one written price. Neither the designer nor the builder can point at the other when something is off, because they’re the same studio.

ADU Design & Permitting

We treat the permit set as the product, not paperwork that trails the sale. For Whitney properties that means site plans that account for septic location, setback variance (the extra distance the county requires between your ADU and the property line), and the drainage the monsoon season demands. ADU Design & Permitting in Whitney.

ADU Design & Permitting

Garage Conversion ADU

Most Whitney garages are attached, single-story, and already sitting on a slab that’s often within range for a conversion. We verify that slab thickness and the utility tie-ins before quoting, then lock the scope at signing under Clause 5 (No Surprises). Garage Conversion ADU in Whitney.

Garage Conversion ADU

New Detached ADU

A detached unit gives you the most square footage, and on Whitney’s generous lots it’s usually feasible if the septic field allows. We coordinate prefab systems from Plant Prefab and James Hardie assemblies within the same contract when a modular approach shortens the build. New Detached ADU in Whitney.

New Detached ADU

Junior ADU & Interior Conversion

A JADU lets you convert existing interior square footage, which sidesteps the septic and drainage questions a detached build triggers. It’s the lighter path for multigenerational living in Whitney, and it still requires a permitted set and final inspection.

ADU Site Prep & Utilities

This is where Whitney projects live or die: locating and decommissioning or rerouting the aging septic lines that sit under many backyards off Boulder Highway, then pouring a slab that meets county drainage requirements. It’s a line item, not a surprise.

Neighborhoods We Serve in Whitney

We work across Whitney’s residential pockets, and typical response time for an estimate visit is within a few business days. A few of the areas we’re in most:

  • The older tracts off Boulder Highway, where RV pads and septic tanks are common
  • The Sunrise Manor edge, where county rules apply and lots are wider
  • The single-story neighborhoods near Whitney Ranch, mostly 1980s and 1990s stucco homes
  • Streets close to the Whitney Recreation Center, where garage conversions come up often

Why Whitney’s Climate & Housing Affect ADU

Summer highs here routinely run above 105°F, and that changes what a habitable ADU needs. Insulation, shaded windows on the west and south faces, and oversized HVAC aren’t upgrades in Whitney, they’re baseline. A detached unit without them will be unusable from June through September, and we size the mechanical system for it in the drawings. Monsoon-season flash flooding is the other factor. Detached ADUs need drainage designed to move water away from the slab during a hard August storm, and on lots where the grade already pools, that means regrading or a swale before we pour. Then there’s the housing stock: 1970s through 1990s slab-on-grade tract homes with stucco exteriors on generous lots, many still on septic. That combination means the geology of your specific backyard, not a template, decides the layout.

Pricing for ADU in Whitney

The bathroom inside a new ADU

Every project gets a written price before any work starts (Clause 1), and that price covers drawings, permit set, and construction as a single contract. The ranges below are typical all-in for Whitney, drawings through final inspection, and the site-specific line items are what move them.

ADU Type Typical All-In Range
Junior ADU (interior conversion) Drawn and quoted per home
Garage conversion ADU Drawn and quoted per home
New detached ADU Drawn and quoted per home
Site prep & septic reroute Separate line item in the written quote

We list the price on paper for your property rather than quoting a number that ignores your slab, your septic, and your setback. Call (866) 403-8955 for your written estimate; the second opinion on an existing estimate is free.

Service Area – Cities Near Whitney

Whitney sits between Las Vegas and the eastern unincorporated county, and we work the surrounding communities the same way. That includes homeowners in Sunrise Manor, Winchester, Paradise, and Las Vegas. Same written price, same documented photo record, same 365-Day Done Right Promise wherever the lot is.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in Whitney

A bedroom and desk inside a converted garage

Ready to get started? Free estimates in Whitney
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Whitney

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Whitney

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Whitney. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch