A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
Paradise, NV

ADU Services in Paradise - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
The private side entrance of a junior ADU
A kitchenette inside a converted garage
A new bathroom inside a converted garage
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in Paradise, NV

Paradise is an unincorporated Clark County community, not a city, so an ADU here runs on county and Nevada state rules rather than a municipal code. That changes the paperwork before it changes the drawings. If you’re weighing a garage conversion, a detached unit in the backyard, or a junior ADU carved out of existing space, we handle the design, the permit set, and the construction under one contract at one written price. Our technicians have up to 11 years of experience, and a live person answers (866) 403-8955 around the clock. Not a voicemail queue.

Call (866) 403-8955

Start with our home page if you want the full picture of how the studio works.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Why Paradise Homeowners Choose Ellery ADU Studio North Las Vegas

A compact kitchen inside a new ADU

Most Paradise homeowners we talk to have already read the three-star reviews somewhere and want to know exactly what they’re buying. Fair. So we put the price on the page and the scope in writing before a shovel touches dirt.

Nevada’s 2021 law, AB 273, limits how far local governments can restrict accessory dwelling units. In an unincorporated community like Paradise, that means your project is governed by Clark County and state rules, and often by an HOA overlay on top, since so much of Paradise sits inside planned communities. A Paradise mailing address frequently carries a Las Vegas name, which sends plenty of homeowners to the wrong counter entirely. We work in that county jurisdiction regularly, from the blocks around the Las Vegas Convention Center to the residential pockets off Tropicana Avenue and the older tract streets near Paradise Road.

Every project follows The Haven Standard. Clause 1 means a written price before any work starts. Every visit produces a documented photo record, so you receive evidence of what was found and what was done. And the 365-Day Done Right Promise backs the finished unit in writing: if it isn’t built to the permitted drawings, we make it right. If you already have a written estimate from another outfit, a free second opinion is yours to ask for.

ADU Services We Offer in Paradise

Five categories, one contract, one written price. Nothing gets handed off to a second company that can point at the first when something is off.

ADU Design & Permitting

The permit set is the product here, not an afterthought. We produce the drawings, run the setback and lot-coverage checks against Clark County requirements, and carry the submittal through to approval. You get the full documentation package, not a summary of how it went.

Learn more about ADU Design & Permitting in Paradise.

ADU Design & Permitting

Garage Conversion ADU

Garage conversions are usually the fastest route to rentable square footage on a Paradise lot, and they’re the least fussy on the planning side because the footprint already exists. We check the existing slab and the garage-to-house separation first, since those details drive the numbers. An existing 4-inch slab sits within range for a conversion; if it’s thinner, that shows up as a line item before you sign, not after.

Learn more about Garage Conversion ADU in Paradise.

Garage Conversion ADU

New Detached ADU

A detached unit gives you the most design freedom and the longest runway, especially on Paradise’s older parcels where backyards are small and block walls already eat into the setback. We survey and locate utilities before anything is staked. Prefab and modular systems from Mighty Buildings and Plant Prefab can shorten the weather-exposed stretch of the build, and we specify and coordinate them inside the same contract.

Learn more about New Detached ADU in Paradise.

New Detached ADU

Junior ADU & Interior Conversion

A junior ADU converts space you already own, a portion of the main house or an attached room, into a separate living unit. It’s the lowest-cost entry point and the one most sensitive to egress, cooking, and separation requirements. We map those against the existing floor plan and tell you plainly what has to move.

ADU Site Prep & Utilities

Caliche-heavy soil, grading, drainage, and the utility runs are where detached projects in Paradise get surprised if nobody looked first. Site prep covers the survey, the utility locate, the slab or pier work, and the tie-ins, quoted as part of the same written scope.

Neighborhoods We Serve in Paradise

We work throughout the Paradise area, including the residential streets near the Convention Center, the lots off Paradise Road, the pockets around Tropicana Avenue, and the tract homes near the Strip corridor. Response across ZIP code 89105 is typically within one business day of your call.

  • Convention Center area
  • Paradise Road corridor
  • Tropicana Avenue neighborhoods
  • Residential pockets near the Strip corridor

Why Paradise’s Climate & Housing Affect ADU

Paradise sits in the Mojave Desert, which is hard on a poorly built unit. Summer heat and relentless sun mean the ADU needs heavier insulation, shaded or east/west-oriented glazing, and cooling that can actually keep up in July, or it won’t be livable and it won’t pass code. Very low rainfall doesn’t mean no drainage problem: monsoon-season flash flooding turns a grading mistake into a foundation problem fast, and caliche-heavy soils complicate excavation and slab work on detached units.

The housing stock adds its own constraints. Paradise is a mix of mid-century single-family tract homes, older apartment and condo clusters, and resort-adjacent lots, much of it built from the 1960s through the 1990s. Plenty of those parcels carry small, irregular backyards and existing block-wall fencing, which narrows the detached footprint and pushes the setback question to the front of the conversation. And because so much of Paradise sits inside HOAs, a county approval doesn’t end the matter. Deed restrictions and association rules can still bite, so we check them before the drawings are final, not after you’ve paid for a permit submittal.

Pricing for ADU in Paradise

A new two-story ADU over a garage

Written price before any work begins, every time. These ranges are for planning, and a real quote follows a site visit.

Project type Typical all-in range
Junior ADU / interior conversion $95,000 – $150,000
Garage conversion ADU $130,000 – $195,000
New detached ADU $220,000 – $340,000
Site prep & utilities (standalone scope) $18,000 – $60,000
Design & permitting, when quoted separately $8,000 – $18,000

Drawings through final inspection, under one contract. The number you sign is the number you pay under Clause 5, No Surprises: the scope is locked at signing, with no door-side upsells and no scope creep.

Service Area – Cities Near Paradise

Paradise sits between several communities we work in routinely. We handle projects in neighboring Winchester, in Whitney and Spring Valley, and in Enterprise, all under the same one-contract model. If you’re near the Paradise boundary, the only thing that changes is which jurisdiction stamps the plan set.

Serving Paradise, NV – Our Local Coverage Area

We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in Paradise

A bedroom and desk inside a converted garage

Ready to get started? Free estimates in Paradise
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Paradise Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Paradise

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Paradise

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Paradise. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch