







A free site visit, a check of what your lot allows and a written, line-item price.
Get your free estimateADU Services in Summerlin, NV
Summerlin homeowners who call us usually have the same first question: what will this actually cost, and what will the Community Association say about it? We answer both in writing before anything gets drawn. Ellery ADU Studio North Las Vegas runs one contract for drawings, permitting, and construction across Summerlin, with a written price attached before work begins. A live person picks up the phone at (866) 403-8955, day or night. Our technicians have up to 11 years of experience, and they know the difference between a Clark County approval and a Summerlin design review sign-off.
What a Summerlin ADU Actually Has to Clear

Most cities give you one gatekeeper. Summerlin gives you three. Before an accessory dwelling unit goes up in 89135, it has to satisfy Clark County permits, the master plan’s CC&Rs, and the Community Association’s Design Review Board – and that last one is where projects die. The design review board controls setbacks, building height, exterior materials, roof pitch, and how much of the structure is visible from the street. A casita that passes county plan check can still come back rejected because its stucco tone doesn’t match the main house or its roofline peeks over a neighbor’s wall.
In the newer villages, this gets sharper. Rear-yard ADUs often get pushed upslope toward Red Rock-visible ridgelines, and there the height and visibility limits from HOA design review – not the county – are what end the project. We build the design review submission into the permit set from day one, so the drawings you approve are the drawings that clear all three layers. That’s the core product here, not a formality at the end.
Why Summerlin Homeowners Choose Ellery ADU Studio North Las Vegas
We’re a design-build studio, which means the drawings, the permit set, and the construction sit under a single contract at a single written price. There’s no designer to blame the builder, and no builder to blame the designer. Since 2015 we’ve designed, permitted, and built 900+ ADUs, every one with a written price before work started and a documented photo record when it was done. That matters in Summerlin, where the approval chain is long enough that a scope gap can cost you a resubmittal and months.
Homeowners in The Ridges and Red Rock Country Club tend to come to us after a first estimate left them with more questions than answers. Bring that estimate and we’ll give you a free second opinion on it – line by line. Background-checked, uniformed crews do the work, and their license number appears on every page of your documentation. Under Clause 1 of The Haven Standard, you get a written price before any work starts; the words “call for a quote” don’t exist in our process. Under Clause 5, No Surprises, the scope locks at signing – no door-side upsells, no scope creep. And if the finished ADU isn’t built to the permitted drawings, the 365-Day Done Right Promise means we make it right, in writing, before the project even starts.
ADU Services We Offer in Summerlin
ADU Design & Permitting
We produce the full drawing set and shepherd it through Clark County plan check and the Summerlin Design Review Board in one pass. The permit set is the product, so we build the CC&R and architectural submission into it from the start. Learn more about our ADU Design & Permitting in Summerlin.

Garage Conversion ADU
Less common in Summerlin than in older valley neighborhoods, but workable where the existing slab, ceiling height, and egress meet code. We tell you in writing what the slab thickness and framing will mean for your foundation and insulation line items. Learn more about our Garage Conversion ADU in Summerlin.

New Detached ADU
The casita tucked into a graded rear-yard corner is the typical Summerlin build – detached, matched to the main house, and positioned to satisfy design review’s visibility rules. We specify and coordinate modular systems from Mighty Buildings, Plant Prefab, and others inside the same contract when a prefab approach fits the lot. Learn more about our New Detached ADU in Summerlin.

Junior ADU & Interior Conversion
A JADU or interior conversion can add living space without triggering the full design review gauntlet the way a new structure does, depending on your village’s CC&Rs. We confirm which approvals apply to your address before drawing. Learn more about our Junior ADU & Interior Conversion in Summerlin.
ADU Site Prep & Utilities
Graded lots against the Spring Mountains mean retaining walls, drainage, and utility runs need real engineering, not guesswork. We handle the grading, trenching, and tie-ins as part of the same written scope. Learn more about our ADU Site Prep & Utilities in Summerlin.
Neighborhoods We Serve in Summerlin
We work across Summerlin’s villages, and response times are typically within a day for a site visit anywhere in the 89135 corridor. A few of the areas we know best:
- The Ridges – larger lots, steep grades, and design review scrutiny on ridgeline visibility
- Red Rock Country Club – established villages with mature landscaping and tight rear setbacks
- Summerlin West – newer villages where upslope placement against Red Rock is the usual challenge
- The Paseos and surrounding villages off West Charleston Boulevard
Why Summerlin’s Climate & Housing Affect ADU Design
Summerlin sits at the western edge of the Las Vegas Valley against the Spring Mountains, so an ADU here faces conditions a standard desert spec doesn’t cover. Summers hit 110°F, and the hot-day, cool-night swing means roofs and insulation have to be designed for real thermal movement, not just shade. Monsoon season brings flash drainage off the slopes, so grading and site prep have to move water away from the new structure deliberately. The housing stock in 89135 is mostly 1990s-to-2010s single-family homes and townhomes, stucco over frame, on lots already constrained by slope and retaining walls. That’s why ADUs here are usually detached casitas in a graded corner rather than garage conversions – the rear yard shapes the build more than the house does.
Pricing for ADU in Summerlin
Every project gets a written price before work starts, so you’re never guessing. Real ranges for Summerlin:
- Junior ADU or interior conversion: typically $95,000 – $160,000 all-in, drawings through final inspection
- Garage conversion ADU: roughly $140,000 – $220,000, depending on slab and egress work
- New detached ADU (casita): generally $220,000 – $380,000, with design review resubmittals and slope grading as the main variables
- Design and permitting only: $14,000 – $28,000, including the CC&R and design review submission
Prefab systems from Boxabl, Tuff Shed, or Plant Prefab can shift the numbers either way; we’ll quote a modular and a site-built option on your lot so you can compare on paper. Under Clause 1, the price is written down before any work begins.
Service Area – Cities Near Summerlin
We work with Summerlin homeowners and connect them to independent local professionals throughout the region, including home service across Spring Valley, Las Vegas, Winchester, and Paradise. If your address sits just outside the Summerlin villages, call and we’ll confirm coverage for your specific lot and its approval layers.
Serving Summerlin, NV – Our Local Coverage Area
We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs About ADU in Summerlin
Yes – in Summerlin an ADU must clear the Community Association’s Design Review Board in addition to Clark County permits and your village’s CC&Rs. That review controls setbacks, height, materials, and street visibility, so it runs alongside the county process, not after it. Call (866) 403-8955 for a free estimate that accounts for all three layers.
Expect roughly $95,000 – $160,000 for a junior ADU or interior conversion, $140,000 – $220,000 for a garage conversion, and $220,000 – $380,000 for a new detached casita, drawings through final inspection. Slope grading and design review resubmittals are the biggest swing factors on Summerlin lots. Call (866) 403-8955 for an exact written quote – the estimate is free.
No. Under Clause 5 of The Haven Standard, the scope locks at signing, so there are no door-side upsells or scope creep. The written price you get before work begins is the price.
Because 89135 lots are tight, graded, and often constrained by retaining walls, which makes a detached casita in a graded corner more practical than converting a garage that may not meet slab or egress requirements. We check your slab and ceiling height in writing before recommending either path.
Yes – the permit set we produce includes the Clark County submittal and the Summerlin design review and CC&R package as one deliverable. You approve one set of drawings that satisfies all three.
Ready to see what your Summerlin lot can actually hold? Call (866) 403-8955 for a free estimate – we’ll give you a written price, a written scope, and a real answer on what the design review board will and won’t allow. If you already have an estimate in hand, bring it and we’ll give you a free second opinion, line by line.
Written by the team at Ellery ADU Studio North Las Vegas.
What happens when you call
- 1A real person answersNo phone trees. Talk to a local ADU pro.
- 2You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
- 3We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
- 4You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.
What Summerlin Customers Say
"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."
- Mireille T."Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."
- Stefan B."The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."
- Helena V.






