A Ellery company - serving North Las Vegas, NV
A backyard ADU foundation formed and ready to pour
ADU Site Prep & Utilities · Henderson, NV

ADU Site Prep & Utilities in Henderson - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Site Prep & Utilities Across Henderson

If you’re planning a detached unit in one of Henderson’s master-planned subdivisions, site prep is where the project is won or lost. Trenching, slab work, panel sizing, gas and water routing: this phase decides your final price and whether your build stays inside the HOA rules and the builder warranty. We work in Henderson constantly, from Green Valley to Anthem, so we know what the ground does here and how the architectural review boards think. Call (866) 403-8955 to set up your free estimate. Our technicians have up to 11 years of experience, and every project gets a written price before any work starts.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Henderson’s Preferred ADU Site Prep & Utilities Company

A fresh concrete slab for a backyard ADU

Most ADU site prep goes wrong for one of two reasons: someone cuts before they scan, or someone builds before anyone reads the CC&Rs. We handle both the drawings and the construction under a single contract, so there’s no gap where a designer blames a builder and nobody owns the mistake. In Henderson that matters more than anywhere else in the valley, because so many lots sit inside HOAs with their own architectural committees on top of the city’s setback rules.

We’ve designed, permitted, and built 900+ ADUs since 2015, and we bring that file cabinet of precedent to each Henderson address. Our technicians are background-checked and carry their license number, and the studio specifies and coordinates prefab and modular systems from Abodu, Plant Prefab, and others when a homeowner wants a shorter build window. The Haven Standard governs all of it: written price up front, a documented photo record of every visit, and a 365-Day Done Right Promise. If we already have a written estimate from another outfit, our Free Second Opinion will tell you what it misses.

Our ADU Site Prep & Utilities Services in Henderson

Foundation & Grading

Henderson lots in the 89012 and 89074 ZIP codes are usually flat and graded toward drains that were never designed for a second dwelling. We re-grade to move water around the new footprint, then set formwork and reinforcement to the permitted drawings. A typical foundation and grading package in Henderson runs $9,000 – $18,000, depending on whether the pad needs fill or a stem-wall.

Electrical Panel Upgrade

Plenty of 1990s and 2000s Henderson homes still carry a 100-amp panel, and adding an ADU with a heat pump and an EV charger will swamp it. We calculate the real load against Henderson’s 100°F+ summers, then specify a 200-amp service where the numbers call for it. A panel upgrade in Henderson typically lands at $2,800 – $5,500 including the permit and utility coordination.

Plumbing Lateral

This is where post-tension slabs change the conversation. We scan before we trench, and we route laterals through the side yard rather than under the slab wherever the site allows, which keeps you out of engineered-approval territory. A new sewer lateral in Henderson generally runs $3,500 – $7,500, and a water line $1,800 – $3,800.

Gas Line Extension

Gas runs for a tankless water heater, a range, or an outdoor kitchen need a pressure test and a permit pulled with the city. We size the line to the appliance load, not to what’s left over after the main house. Typical Henderson gas extension pricing sits at $1,200 – $3,000. For the full scope behind these line items, see our ADU Site Prep & Utilities service page.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Henderson

When a Henderson homeowner wants a modular or prefab approach, we specify and coordinate the system within the same single contract. We’re fluent in how Abodu, Plant Prefab, and Tuff Shed systems handle foundations and utility tie-ins, and how James Hardie cladding performs under Henderson’s sun. We don’t stock parts or carry inventory; what we do is get the right system specified and the site prepared to receive it on a schedule that holds. For a project in Anthem or Seven Hills, that coordination is the difference between a clean install and a yard full of idle boxes.

Common ADU Site Prep & Utilities Problems We See in Henderson Homes

  • Cutting a post-tension slab without an engineer’s letter. Many Henderson subdivisions built between 1990 and 2010 use post-tension foundations, and slicing one for a lateral voids the structural warranty and risks a cable. A slab scan and a routing plan come first, always.
  • Skipping HOA architectural review. Detached units that cross a view corridor or exceed the development’s height limit get stop-work orders. In Henderson’s HOA-governed subdivisions, the architectural review runs before city permitting, not after.
  • Undersizing the panel for the cooling load. A panel sized for the main house alone trips when the AC, the ADU’s unit, and an EV charger all pull at once on a July afternoon. We build Henderson’s summer into the load calculation.
  • Ignoring how the desert sun hits the new unit. A west-facing ADU wall with builder-grade insulation bakes in August. We plan shade and low-water cooling strategies during site prep so the utility work supports them.

The local pattern that catches most Henderson owners: a property in a subdivision built around 2000 has a backyard squeezed by shallow side setbacks, leaving a narrow buildable pocket. The existing 100-amp panel is already maxed. The work starts with an HOA/CC&R review, then a slab scan to dodge the post-tension cables, a service upgrade to 200 amps, and new plumbing and gas routed through the side yard instead of under the slab, all while keeping the builder warranty on the main house intact. That sequence is the whole job.

Pricing for ADU Site Prep & Utilities in Henderson, NV

A utility trench with new sewer pipe and conduit

Everyone in Henderson deserves a number, not a “call us.” Here are the ranges we see on residential ADU site work in this market:

  • Foundation & grading: $9,000 – $18,000
  • Electrical panel upgrade: $2,800 – $5,500
  • Plumbing lateral: $3,500 – $7,500
  • Water line: $1,800 – $3,800
  • Gas line extension: $1,200 – $3,000
  • Drought-tolerant landscaping & hardscape: $4,000 – $12,000

Post-tension work requiring an engineer’s letter, long runs through side yards, and HOA review documentation push the total toward the top of these ranges. Every Henderson project is quoted with a written price before any work begins (Haven Standard, Clause 1), with the scope locked at signing. No door-side upsells.

We Also Serve Cities Near Henderson

Homeowners in Boulder City, Whitney, Paradise, and Enterprise call us for the same site prep and utility work, and the rules shift as you cross each boundary. We handle the permitting differences between these communities and Henderson, so you’re not translating one city’s code into another. Wherever you sit on the southeast side, our ADU Site Prep & Utilities in Henderson coverage explains what we do close to home.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Site Prep & Utilities in Henderson

A new two-story ADU over a garage

Why Henderson Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU site prep & utilities in Henderson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Henderson

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

Trusted by homeowners across Henderson and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
An attached garage converted into living spaceThe private side entrance of a junior ADUA compact kitchen inside a new ADUA kitchenette inside a converted garageA new modern ADU with wood claddingA new bathroom inside a converted garage

More ADU services in Henderson

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Henderson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Henderson.

(866) 403-8955

Request a Free Estimate in Henderson

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch