A Ellery company - serving North Las Vegas, NV
A backyard ADU foundation formed and ready to pour
ADU Site Prep & Utilities · Paradise, NV

ADU Site Prep & Utilities in Paradise - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
A former garage converted into a guest house
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable ADU Site Prep & Utilities Across Paradise

Site prep is where most Paradise ADU projects are won or lost – and Paradise has a wrinkle most homeowners don’t discover until the drawings are done. Because Paradise is an unincorporated Clark County community, there’s no Paradise city hall to approve your plans; the packet goes to Clark County and, in the many planned communities here, to an HOA whose design conditions can bite after the approval you thought you had. Our ADU Site Prep & Utilities team files, sequences, and builds around that reality. Call (866) 403-8955 for a written price before any work begins.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Paradise’s Preferred ADU Site Prep & Utilities Company

We’re a design-build studio, which matters in Paradise because the drawings and the dirt work sit on one contract at one written price. Under Haven Standard Clause 1, you get a written price before work starts – no “call for a quote,” no number that moves after the survey. On every visit you receive a documented photo record: what the utility locate found, what the soil looked like, what the panel measured at. The scope is locked at signing under Clause 5 (No Surprises), so there are no door-side upsells once a trench is open. Our technicians have up to 11 years of experience, and their license number appears on every page – verified, not just claimed. We’ve designed, permitted, and built 900+ ADUs since 2015, every one with a written price before work started. A free second opinion is available on any estimate you already hold. And because Paradise sits inside the county’s jurisdiction rather than a city’s, we know which questions to ask Clark County and which to ask an HOA before a single stake goes in the ground.

Our ADU Site Prep & Utilities Services in Paradise

Foundation & Grading

Paradise’s caliche-heavy soils and monsoon-season flash flooding set the terms here: footing depth and drainage fall have to be designed for the desert, not borrowed from a template. A detached unit typically starts with a survey and an 811 utility locate, then re-grading and a stem-wall or slab pour sized to what the soil report shows. Typical foundation and grading in Paradise runs $9,000 – $22,000 depending on slab size, soil conditions, and how much re-grading the lot needs.

Electrical Panel Upgrade

Older Paradise homes built from the 1960s through the 1990s often carry panels that won’t support an ADU’s load alongside the main house. We assess the existing service, then coordinate a panel upgrade and dedicated ADU feed that passes inspection the first time. A 200-amp panel upgrade with an ADU subpanel in Paradise typically runs $3,200 – $6,800.

Plumbing Lateral

Shallow utility runs sit under some of Paradise’s older block-walled backyards, which is why a locate comes before any trench. We tie the ADU’s waste and water lines into the existing lateral or run a new one, sized and sloped to code. A plumbing lateral for a detached ADU in Paradise typically runs $4,500 – $11,000.

Gas Line Extension

If your ADU uses gas for cooking, hot water, or heating, the line extends from the meter and gets pressure-tested before inspection. Trenching shares the same utility corridor as the plumbing lateral, which keeps mobilization down. A gas line extension in Paradise typically runs $1,800 – $4,200.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Paradise

We specify and coordinate prefab and modular systems within the same single contract – including Plant Prefab, Tuff Shed, and Abodu. What those brands don’t handle is the ground under them: survey, 811 locate, caliche-aware footings, panel work, and the lateral tie-in all still land on your site-prep scope. We coordinate the factory delivery date against the county and HOA approval milestone so the unit arrives after the site is ready, not before. No parts are stocked on any truck; everything is scheduled and pulled to the job, and turnaround is coordinated through the brand and your approval timeline rather than promised on a phone call.

Common ADU Site Prep & Utilities Problems We See in Paradise Homes

  • Trenching before the locate clears. Some Paradise lots have shallow utility runs under what looks like open backyard, and staking a slab before an 811 locate marks them is how a project meets a damaged line and a repair bill. We locate first, then schedule excavation.
  • Design bounced after grading started. A site-prep package that ignores HOA architecture conditions – colours, heights, materials – gets returned even when AB 273 protects the use itself. Because Paradise’s planned communities impose deed restrictions and design conditions, the design review has to clear before a trench opens.
  • Caliche and monsoon assumptions that fail. Framing to a soil and drainage assumption without re-grading leaves water pooling against the ADU foundation in a flash-flood event. On Paradise’s older mid-century parcels, the footing depth and drainage fall are checked against the actual soil, not assumed.
  • Panels that can’t carry the load. A panel sized for a 1970s tract home rarely has headroom for a second dwelling. We measure the existing service during site prep so the upgrade is priced in the written scope, not discovered at inspection.

Pricing for ADU Site Prep & Utilities in Paradise, NV

Site prep for a detached ADU in Paradise typically runs $19,000 – $44,000 all-in across grading, foundation, panel upgrade, plumbing lateral, and gas extension, with the low end on a flat lot with existing capacity and the high end on irregular backyards or deeper utility work. Foundation and grading alone runs $9,000 – $22,000; a 200-amp panel upgrade with ADU subpanel $3,200 – $6,800; a plumbing lateral $4,500 – $11,000; a gas line extension $1,800 – $4,200. Caliche depth, block-wall access, locate findings, and HOA-driven design revisions move the number most. You receive a written price before any work starts, and the scope is locked at signing. Call (866) 403-8955 for a free estimate – a free second opinion is available on any estimate you already have.

We Also Serve Cities Near Paradise

We work ADU site prep across the neighborhoods around Paradise, including Winchester, Whitney, Spring Valley, and Enterprise. The county and HOA review thread runs through all of them, which keeps our scheduling consistent across the corridor. See our full ADU Site Prep & Utilities service scope and our ADU Site Prep & Utilities in Paradise page for what applies to your address.

Serving Paradise, NV – Our Local Coverage Area

We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – ADU Site Prep & Utilities in Paradise

A fresh concrete slab for a backyard ADU

Why Paradise Chooses Ellery ADU Studio North Las Vegas

We set the standard for ADU site prep & utilities in Paradise.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Paradise

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Paradise Customers Say

Trusted by homeowners across Paradise and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A new two-story ADU over a garageAn attached garage converted into living spaceThe private side entrance of a junior ADUA compact kitchen inside a new ADUA kitchenette inside a converted garageA new modern ADU with wood cladding

More ADU services in Paradise

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Paradise?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Paradise.

(866) 403-8955

Request a Free Estimate in Paradise

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch