A Ellery company - serving North Las Vegas, NV
A quiet residential street with a new ADU behind one of the homes
Summerlin, NV

ADU Services in Summerlin - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
An efficiency kitchen in a junior ADU
An attached garage converted into living space
The private side entrance of a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU Services in Summerlin, NV

Summerlin homeowners who call us usually have the same first question: what will this actually cost, and what will the Community Association say about it? We answer both in writing before anything gets drawn. Ellery ADU Studio North Las Vegas runs one contract for drawings, permitting, and construction across Summerlin, with a written price attached before work begins. A live person picks up the phone at (866) 403-8955, day or night. Our technicians have up to 11 years of experience, and they know the difference between a Clark County approval and a Summerlin design review sign-off.

Call (866) 403-8955

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

What a Summerlin ADU Actually Has to Clear

The bedroom inside a new ADU

Most cities give you one gatekeeper. Summerlin gives you three. Before an accessory dwelling unit goes up in 89135, it has to satisfy Clark County permits, the master plan’s CC&Rs, and the Community Association’s Design Review Board – and that last one is where projects die. The design review board controls setbacks, building height, exterior materials, roof pitch, and how much of the structure is visible from the street. A casita that passes county plan check can still come back rejected because its stucco tone doesn’t match the main house or its roofline peeks over a neighbor’s wall.

In the newer villages, this gets sharper. Rear-yard ADUs often get pushed upslope toward Red Rock-visible ridgelines, and there the height and visibility limits from HOA design review – not the county – are what end the project. We build the design review submission into the permit set from day one, so the drawings you approve are the drawings that clear all three layers. That’s the core product here, not a formality at the end.

Why Summerlin Homeowners Choose Ellery ADU Studio North Las Vegas

We’re a design-build studio, which means the drawings, the permit set, and the construction sit under a single contract at a single written price. There’s no designer to blame the builder, and no builder to blame the designer. Since 2015 we’ve designed, permitted, and built 900+ ADUs, every one with a written price before work started and a documented photo record when it was done. That matters in Summerlin, where the approval chain is long enough that a scope gap can cost you a resubmittal and months.

Homeowners in The Ridges and Red Rock Country Club tend to come to us after a first estimate left them with more questions than answers. Bring that estimate and we’ll give you a free second opinion on it – line by line. Background-checked, uniformed crews do the work, and their license number appears on every page of your documentation. Under Clause 1 of The Haven Standard, you get a written price before any work starts; the words “call for a quote” don’t exist in our process. Under Clause 5, No Surprises, the scope locks at signing – no door-side upsells, no scope creep. And if the finished ADU isn’t built to the permitted drawings, the 365-Day Done Right Promise means we make it right, in writing, before the project even starts.

ADU Services We Offer in Summerlin

ADU Design & Permitting

We produce the full drawing set and shepherd it through Clark County plan check and the Summerlin Design Review Board in one pass. The permit set is the product, so we build the CC&R and architectural submission into it from the start. Learn more about our ADU Design & Permitting in Summerlin.

ADU Design & Permitting

Garage Conversion ADU

Less common in Summerlin than in older valley neighborhoods, but workable where the existing slab, ceiling height, and egress meet code. We tell you in writing what the slab thickness and framing will mean for your foundation and insulation line items. Learn more about our Garage Conversion ADU in Summerlin.

Garage Conversion ADU

New Detached ADU

The casita tucked into a graded rear-yard corner is the typical Summerlin build – detached, matched to the main house, and positioned to satisfy design review’s visibility rules. We specify and coordinate modular systems from Mighty Buildings, Plant Prefab, and others inside the same contract when a prefab approach fits the lot. Learn more about our New Detached ADU in Summerlin.

New Detached ADU

Junior ADU & Interior Conversion

A JADU or interior conversion can add living space without triggering the full design review gauntlet the way a new structure does, depending on your village’s CC&Rs. We confirm which approvals apply to your address before drawing. Learn more about our Junior ADU & Interior Conversion in Summerlin.

ADU Site Prep & Utilities

Graded lots against the Spring Mountains mean retaining walls, drainage, and utility runs need real engineering, not guesswork. We handle the grading, trenching, and tie-ins as part of the same written scope. Learn more about our ADU Site Prep & Utilities in Summerlin.

Neighborhoods We Serve in Summerlin

We work across Summerlin’s villages, and response times are typically within a day for a site visit anywhere in the 89135 corridor. A few of the areas we know best:

  • The Ridges – larger lots, steep grades, and design review scrutiny on ridgeline visibility
  • Red Rock Country Club – established villages with mature landscaping and tight rear setbacks
  • Summerlin West – newer villages where upslope placement against Red Rock is the usual challenge
  • The Paseos and surrounding villages off West Charleston Boulevard

Why Summerlin’s Climate & Housing Affect ADU Design

Summerlin sits at the western edge of the Las Vegas Valley against the Spring Mountains, so an ADU here faces conditions a standard desert spec doesn’t cover. Summers hit 110°F, and the hot-day, cool-night swing means roofs and insulation have to be designed for real thermal movement, not just shade. Monsoon season brings flash drainage off the slopes, so grading and site prep have to move water away from the new structure deliberately. The housing stock in 89135 is mostly 1990s-to-2010s single-family homes and townhomes, stucco over frame, on lots already constrained by slope and retaining walls. That’s why ADUs here are usually detached casitas in a graded corner rather than garage conversions – the rear yard shapes the build more than the house does.

Pricing for ADU in Summerlin

Every project gets a written price before work starts, so you’re never guessing. Real ranges for Summerlin:

  • Junior ADU or interior conversion: typically $95,000 – $160,000 all-in, drawings through final inspection
  • Garage conversion ADU: roughly $140,000 – $220,000, depending on slab and egress work
  • New detached ADU (casita): generally $220,000 – $380,000, with design review resubmittals and slope grading as the main variables
  • Design and permitting only: $14,000 – $28,000, including the CC&R and design review submission

Prefab systems from Boxabl, Tuff Shed, or Plant Prefab can shift the numbers either way; we’ll quote a modular and a site-built option on your lot so you can compare on paper. Under Clause 1, the price is written down before any work begins.

Service Area – Cities Near Summerlin

We work with Summerlin homeowners and connect them to independent local professionals throughout the region, including home service across Spring Valley, Las Vegas, Winchester, and Paradise. If your address sits just outside the Summerlin villages, call and we’ll confirm coverage for your specific lot and its approval layers.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About ADU in Summerlin

Ready to get started? Free estimates in Summerlin
Call (866) 403-8955

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

★★★★★ 4.7 from 7+ reviews

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

- Stefan B.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Summerlin

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

More ADU services in Summerlin

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Summerlin. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch