A Ellery company - serving North Las Vegas, NV
A new modern detached ADU in a backyard
New Detached ADU · Las Vegas, NV

New Detached ADU in Las Vegas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
An efficiency kitchen in a junior ADU
An attached garage converted into living space
The private side entrance of a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Las Vegas

Planning a detached ADU on a Las Vegas tract lot? The first real deadline isn’t the city permit. It’s the HOA architectural review, and in most of the newer master-planned subdivisions it runs several weeks before the building permit is even filed. Ellery ADU Studio North Las Vegas handles both clocks in one written contract at one written price, drawings through final inspection. Our technicians have up to 11 years of experience, and we know the Las Vegas lot shapes, CC&Rs and coverage math well enough to tell you what will actually fit before you spend a dollar on drawings. Call (866) 403-8955 to schedule a free estimate.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Las Vegas’s Preferred New Detached ADU Company

A compact kitchen inside a new ADU

Las Vegas is mostly a valley of post-2000 stucco-and-tile tract homes. We work those lots constantly, which means we’ve learned the local habits that sink ADU projects: plans drawn to the city setback that never checked the HOA CC&Rs, footprints that miss rear-lot coverage, and pads poured before anyone measured the pool-equipment strip. We quote a written price before any work begins and hold to it.

Under The Haven Standard, every visit produces a documented photo record of what we found and what we did, and the 365-Day Done Right Promise is in writing before the project starts. If the finished ADU isn’t built to the permitted drawings, we make it right. Our technicians are background-checked and experienced, and a live person answers our line 24/7. No voicemail queue.

Las Vegas homeowners tend to research before they call. We expect that. Put a written estimate and a Free Second Opinion next to whatever else you’re holding and compare the scope line by line.

Our New Detached ADU Services in Las Vegas

Custom Built ADU in Las Vegas

A custom unit is the right call when your lot’s constraint is geometry, not budget. On a small master-planned backyard in Las Vegas, the workable footprint is often a roughly 20-foot strip beside the pool equipment, which rules out off-the-shelf plans and rewards a design drawn to the actual lot. We deliver the permit set as the product, not an afterthought.

Custom Built ADU in Las Vegas

Studio ADU in Las Vegas

Studios are the most common detached unit in Las Vegas’s newer subdivisions, and the reason is coverage math: a smaller footprint passes rear-lot coverage limits that a two-bedroom fails. A studio here still needs aggressive insulation, a high-SEER mini-split sized for 110°F-plus summers, and deep roof overhangs.

Studio ADU in Las Vegas

1-Bed & 2-Bed ADU in Las Vegas

One-bedroom units fit most post-2000 tract lots in ZIPs like 89129, 89131 and 89149; two-bedrooms usually don’t unless the lot is a corner or an oversized cul-de-sac parcel. We measure first and tell you which side of that line your lot is on. Most lots land on the one-bedroom side.

1-Bed & 2-Bed ADU in Las Vegas

Prefab and Modular ADU in Las Vegas

Prefab and modular systems from brands like Abodu and Plant Prefab can work well on flat Las Vegas lots, but they don’t eliminate the HOA architectural packet. Factory-built or site-built, your subdivision’s architectural review still runs first. We coordinate the factory system and the site work under the same single contract.

Every one of these falls under our New Detached ADU service line, drawings through final inspection.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Las Vegas

We specify and coordinate prefab and modular systems from Abodu, Plant Prefab, Tuff Shed and others, and we work in James Hardie siding where the exterior package calls for it. We don’t warehouse parts or stock components. What we do is read the manufacturer’s system against your lot, your HOA packet and your budget, then tell you plainly which one fits. On a typical Las Vegas tract parcel, that conversation usually takes one site visit. Prefab timelines look fast on paper; the local review clock is what sets the real schedule.

Common New Detached ADU Problems We See in Las Vegas Homes

  • The plan ignored the HOA CC&Rs. The drawing meets the city setback, the architectural packet was never filed, and the project sits for weeks before revisions bounce it back. Under AB 135 your HOA can’t ban the ADU, but it can still impose design review, and that review runs weeks before the permit is filed.
  • Builder-grade envelope kept as-is. Reusing the main house’s stucco, roofing and window package is fine on a shaded wall. On a flat-roof detached unit in Las Vegas it underperforms in July heat and monsoon-driven rain, and the UV exposure on a low-slope roof is unforgiving.
  • Systems tied into the main house. Pulling new electrical and gas from the main panel can trip builder warranty exclusions on a newer home. Keeping the ADU systems independent protects the warranty you paid for.
  • Footprint laid out without coverage math. Rear-lot coverage and the pool-equipment side-yard strip get checked last instead of first, which forces a late re-pour on a narrower pad. Measuring before design is cheaper than measuring after concrete.

Pricing for New Detached ADU in Las Vegas, NV

Custom detached ADUs in Las Vegas typically run $180,000 – $340,000 all-in, drawings through final inspection, with studio units landing in the lower half of that band and two-bedrooms near the top. Prefab and modular installations usually run $120,000 – $220,000 before site work, and site prep runs $15,000 – $45,000 depending on pad re-pour, utility trenching and grading. HOA architectural review and city permitting are separate line items in the written scope. Every project gets a written price before any work starts, so the number you see is the number you sign. Call (866) 403-8955 for a free estimate.

We Also Serve Cities Near Las Vegas

We handle Las Vegas and the surrounding valley, including Winchester, North Las Vegas, Sunrise Manor and Paradise. The lot shapes and HOA rules shift street to street, so we check the subdivision before we check the parcel. If you’re just outside the city limits, the same AB 135 review logic applies.

Serving Las Vegas, NV – Our Local Coverage Area

We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – New Detached ADU in Las Vegas

A new modern ADU with wood cladding

Why Las Vegas Chooses Ellery ADU Studio North Las Vegas

We set the standard for new detached ADU in Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Las Vegas

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Las Vegas Customers Say

Trusted by homeowners across Las Vegas and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

More ADU services in Las Vegas

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Las Vegas.

(866) 403-8955

Request a Free Estimate in Las Vegas

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch