A Ellery company - serving North Las Vegas, NV
A new modern detached ADU in a backyard
New Detached ADU · Summerlin, NV

New Detached ADU in Summerlin - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in North Las Vegas
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A kitchenette inside a converted garage
A new bathroom inside a converted garage
A former garage converted into a guest house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Summerlin

If you own a home in Summerlin and you’re weighing a detached casita, you already know the hard part isn’t the idea. It’s the approvals. Our New Detached ADU team spends most of its time on Summerlin projects reading Community Association design guidelines alongside Clark County code, because in 89135 those two rulebooks don’t always agree. We quote a written price before any work starts, and a live person answers calls 24/7 at (866) 403-8955. Summerlin homeowners deserve a plan that survives review, not just a nice rendering.

Call (866) 403-8955

Why Ellery ADU Studio North Las Vegas Is Summerlin’s Preferred New Detached ADU Company

The living room inside a new ADU

We’ve built our reputation in Summerlin on one thing: a permit set that holds up. That matters here more than almost anywhere in the valley, because a project that meets county setback and height limits can still get turned away at design review for poking above the rear slope. We do the design, the permit drawings, and the construction under one contract at one written price, so nobody points at somebody else when a review comment lands. Under Haven Standard Clause 1, you see the number in writing before work begins – not a range that drifts once the HOA weighs in.

Our clients in Summerlin tend to research hard before they call, and they come to us with a written estimate already in hand. We’ll give a free second opinion on any written estimate you’ve received. Every visit includes a documented photo record, so you have evidence of what was found and what was done. Our technicians have up to 11 years of experience, and they’re background-checked.

And the call side is simple: a live person answers, day or night, at (866) 403-8955. No voicemail queue.

Our New Detached ADU Services in Summerlin

Summerlin’s planned-community lots are tight. Rear yards are already graded, often against a retaining wall, and the casita almost always has to tuck into a corner rather than spread out flat. That shapes how we scope every build in 89135. Here’s how the work breaks down.

Custom Built ADU in Summerlin

A custom detached ADU in Summerlin is drawn for your specific lot grade and your community’s design guidelines, not pulled off a shelf. We work the pad and drainage into the footprint from the start, because re-grading after the fact is one of the most common cost surprises on the west side. Every plan goes to the table with a written price before construction begins.

Custom Built ADU in Summerlin

Prefab ADU Installation in Summerlin

We specify and coordinate prefab systems from names like Plant Prefab and Boxabl within the same single contract that covers the site work. A factory-built unit still has to clear design review and sit correctly on a graded pad, so the haul route and crane access get planned before anything ships. That upfront staging is what keeps a prefab install on schedule.

Prefab ADU Installation in Summerlin

Modular ADU in Summerlin

Modular units can make sense in Summerlin’s newer villages where the lot is flat enough for a clean set and the design guidelines favor a simple massing. We coordinate the module specs, the foundation, and the utility stubs together so the pieces line up. Material hauls and equipment access get mapped to your lot before we commit to a date.

Modular ADU in Summerlin

Studio ADU in Summerlin

A studio ADU is the smallest footprint that still clears Summerlin’s height and visibility caps, which makes it the most forgiving option when your rear slope is steep. It’s a good fit for a casita along the upslope corner where a larger mass would breach the ridgeline rule. We size the roof and insulation for 110°F summers from the first drawing.

1-Bed & 2-Bed ADU

When the goal is long-term rental or multigenerational use, a 1-bed or 2-bed detached ADU carries more value per square foot, but it also puts more pressure on your pad and drainage design. A two-bed casita on a graded Summerlin lot often needs a stepped footprint and retaining worked into the plan. We scope that before quoting, so the number you see matches the build you get.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 403-8955

Trusted Brands We Service in Summerlin

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, Mighty Buildings, Boxabl, Plant Prefab, Tuff Shed, and James Hardie siding. We don’t stock parts or run a warehouse – what we do is fit the right system to your lot and your community’s guidelines, then hold the whole project under one contract. If a brand’s panel system fits your Summerlin rear yard and clears design review, we’ll coordinate it. If it doesn’t, we’ll tell you why before you commit a dollar.

Common New Detached ADU Problems We See in Summerlin Homes

  • The county permit clears but design review doesn’t. A plan that meets Clark County setback and height limits can still be rejected by the Community Association’s Design Review Board for being visible above the rear ridgeline. We read the guidelines before we draw, not after.
  • Slope and existing retaining walls force a re-graded pad. Summerlin’s tight, graded lots often leave the rear yard already constrained by slope and a retaining wall. That means a re-graded or stepped pad, and grading and drainage cost the initial footprint didn’t budget for.
  • Monsoon flash runoff overwhelms a generic desert spec. Summerlin sits against the Spring Mountains, where monsoon-season drainage and 110°F sun exposure punish a roof and pad built to standard desert spec. We re-engineer roof, insulation, and drainage for the mountains’ edge.
  • Material haul and equipment access get discovered too late. On lots where the rear yard is hemmed by a wall or a steep grade, the haul route and crane or delivery access have to be mapped before quoting. Finding out after the deposit that a truck can’t reach the corner stalls the job.

Pricing for New Detached ADU in Summerlin, NV

A detached ADU in Summerlin typically runs $180,000 – $320,000 all-in, drawings through final inspection, depending on size, site grade, and how much retaining and drainage the lot needs. A studio casita sits at the low end of that range; a 1-bed or 2-bed unit with a stepped pad and added retaining runs toward the top. Prefab and modular installation can land lower on construction but still carries site work and design review costs. Every project is quoted with a written price before any work starts, per Haven Standard Clause 1. Call (866) 403-8955 for your free estimate.

We Also Serve Cities Near Summerlin

Summerlin sits at the valley’s western edge, and we work the surrounding communities too. If you’re just outside 89135, we cover New Detached ADU in Summerlin and the nearby cities of Spring Valley, Las Vegas, Winchester, and Paradise. Summerlin homeowners searching for a Summerlin ADU specialist will find we know this side of the valley cold.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – New Detached ADU in Summerlin

A small deck outside a new ADU

Why Summerlin Chooses Ellery ADU Studio North Las Vegas

We set the standard for new detached ADU in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T.
★★★★★

"Detached unit in the back garden. Good design, good build quality, and the cost changes were documented and agreed in advance."

Stefan B.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.

More ADU services in Summerlin

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery in North Las Vegas

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Your North Las Vegas team

A local vetted partner works across North Las Vegas and the towns around it, to the same written standard as every Ellery job.

Areas we serve
A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(866) 403-8955

Request a Free Estimate in Summerlin

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch